RAU User Design
|
TRN Transition
|
Stage RAC - Rapid Construction
![]() |
Step 0100 - Prepare for Rapid Construction Step 0200 - Construct System Step 0300 - Generate Test Data and System Documents Step 0400 - Prepare for Transition Step 0500 - Verify System Construction |
Description
The design of the proposed system, initially described in the User Design stage, is completed in the Rapid Construction stage, and application software to implement that design is developed and tested. Activities to prepare for the transition of the system to production status are also performed.Th...
Please login/register to continue reading.
Process Flow
Outputs
|
"If you have an important point to make, don't try to be subtle or clever. Use a pile driver. Hit the point once. Then come back and hit it again. Then hit it a third time--a tremendous whack." - Winston Churchill |