Top Influencers

Network:1685




Network:0




Network:144




Network:820




Network:1515




Network:3079




Network:32




Network:733




Network:882




Network:157




See all Quality Influencers


On-demand Webinars

The Necessary Culture for Soaring Performance

by Karen Chovan
March 22, 2017 | 61:48 | Views: 3,642 | PDUs: 1.00 | Rating: 5.48 / 7

Has your organization or quality management team gone through the effort of adopting the Plan, Do, Check, Act (PDCA) strategy for making improvements to various processes? This talk will dive into what it really takes for an organization, or even a department within, to make true gains from the PDCA process.

O Titanic e os 5 pecados capitais dos gerentes de projetos

by Luis Alberto Caceres Villota
February 28, 2017 | 65:53 | Views: 397 | PDUs: 1.00 | Rating: 5.81 / 7

Neste webinar projeto RMS Titanic é explorado para mostrar algumas causas comuns de falhas nos projetos bem gerenciados. O autor explora os "cinco pecados dos gerentes de projeto”, cinco comportamentos identificados em pesquisas recentes como fatores chaves de fracasso na gestão de projetos. Estes são: arrogância, ganância, ignorância, fraude e abstinência.

See all Quality On-demand webinars

Save Time With Tools + Templates

Key Performance Indicator Template

PREMIUM deliverable
by Harold Hunt

While numerous key performance indicators (KPIs) typically influence IT projects generally, the benefit of tracking all of them may be outweighed by the cost to do so. Therefore, each project must carefully select and manage those KPIs most relevant to its specific situation. This sample template can be used to define KPIs; also included is a table with examples of possible KPIs for each of the previously defined project-critical success factors (PCSFs) and a metric (measure and dimension) for each KPI. Use in conjunction with the article Determining IT Project Health.

Sample Project Charter/Record

deliverable
by Arassen Chocalingum

This deliverable relates both a project charter and a project record form to be used during the initiating phase of a given project. It gives a high-level overview of the project including the budget, scope, resources and roles and responsibilities.

Non-Conformance Report (NCR)

deliverable
by Sameh Nasr

Need to document a non-conformance identified in a quality audit or other process review? This form helps you document the problem so that corrective action can be initiated. To be signed by the resident engineer, quality manager and contractor.

Project Status Report (Presentation)

presentation
by Ashish Gudibande

This blank sample presentation can be used as a general project status report that includes an overall project status review; detailed tasks/modules review; and quality incidents/discussion of mitigation steps for continuous improvement.

Learn From Others

Rescue Me! Understanding Triple Constraint Problems

by Michael Zekser

What constitutes a troubled project? The answer is truly in the eyes of the sponsor, but as project managers we need to measure objectively and then decide how to use those facts in our go-forward plans. Here the author puts everything in the context of the triple constraint.

Dealing with Claims in Construction

by Manavasi Ramesh

Claims arise in a project mainly due to lack of clarity in scope and specifications, ambiguities in contract clauses, interface scope with other projects, site conditions and time constraints. Here we discuss various scenarios and issues that can arise during project execution—along with possible solutions to address the issue of claims management in construction projects.

Quality Planning for Projects

by Elok Robert Tee

A quality process is typically entrenched as a documented procedure or a quality document or standard that governs the creation of services, products and activities that produce results. Here is some help developing this important document.

Tracking Project and Task Progress

by Michael Zekser

This article describes a useful technique for tracking project and task progress in situations where project resources are less than fully cooperative due to conditions outside project manager or sponsor control. It can also be applied with specialized or uniquely skilled resources that are challenged to accurately report progress due to communication issues--or are over-loaded with work for other projects or operations.

Be Careful Not to Break Something While Being Agile

by Rich Hephner

Agile is all about managing change, but every organization has a different rate of change. We generally think about agile as removing impediments to accelerate development and keep up with change. It also has an important role to play in placing constraints on change so that it doesn’t spin out of control. This article is a case study of how too much change can lower quality and lead to products that completely miss the mark.

Much More Than the Triple Constraint

by Kumar Srikant

For a long time, the constraints of time, scope and cost have been the key attributes that a project management professional had to handle effectively for project success. However, project success encompasses much more.

The Cost of Quality

by Ayhan Özcan

Many organizations consider quality improvement as a critical factor of success for competitiveness. The goal of continuous improvement attempts to not only meet customer requirements, but to also do it at the lowest cost. Values obtained as a result of the calculation need to be analyzed to prepare plans for improvement and set goals for reducing the cost of quality.

Running the Short Project

by Kenneth Darter, PMP

Not every project is a multi-year, billion-dollar implementation. Sometimes, you need to get something done in a few weeks or a few months…and the approach to these projects is much different.


Ask a Question

Discussion Rules

Recent Questions

Topic Originator Last Post Votes Replies
Project Management & Lean Six Sigma  Adnan Shareef  Jul 17, 2017 9:39 AM 
assumptions template  Albert Mun On Wong  Jul 17, 2017 1:23 AM 
Find or make PM templates?  Michael Shanklin  Jul 14, 2017 1:13 PM 
Tools vs Techniques  George Lewis  Jun 27, 2017 6:04 AM  19 
If out-of-tolerance product is accepted by the Owner for work performed by in-house construction staff, is a response to a Non-Conformance Report (NCR) required?   Henry Hattenrath  Jun 17, 2017 3:01 PM 
What's The Difference Between Scrum & Kanban?  George Lewis  Jun 7, 2017 4:49 PM  16 
Quality of PM?  Stéphane Parent  May 25, 2017 10:04 AM 
What is a Project Manager?  Von Brickhouse  May 21, 2017 8:40 AM  24 
Do I need to be certified to lead the QA Team?  Dr. Zulk Shamsuddin  May 19, 2017 7:51 AM  12 
Quality Enhancement Project  Loïc Hascher  May 15, 2017 12:42 PM 
Seven Basic Quality Tools  Aejaz Shaikh  May 8, 2017 3:25 PM 
Game Theory in Project Management  George Lewis  Apr 30, 2017 3:58 AM 
Study group for PMP aspirants planning to become PMP  Pavan Nallamalli  Apr 27, 2017 4:23 PM 
Inspections and Audits are they the same?  George Lewis  Apr 13, 2017 1:51 AM 
Quality !!  Aejaz Shaikh  Apr 11, 2017 2:51 AM 
Feedback  Jeffrey Semon  Apr 8, 2017 2:56 AM 
Quality Tools in Project management  Sajeev Kumar Menon  Apr 4, 2017 9:38 AM  10 
Process audits  Visswanathan KKN  Apr 3, 2017 7:11 PM 
Book on Agile for non-software development  Stewart Ting Chong  Apr 2, 2017 9:00 PM 
What's the difference between Six Sigma Projects and Traditional Projects?  George Lewis  Mar 31, 2017 12:42 PM 
Page: 1 2 3 4 5 6 next
See All Questions
ADVERTISEMENTS

"It takes a lot of courage to show your dreams to someone else."

- Erma Bombeck