Who Does What in KPI Project Reporting

From the The Money Files Blog
by
A blog that looks at all aspects of project and program finances from budgets and accounting to getting a pay rise and managing contracts.

About this Blog

RSS

Recent Posts

5 Types of Project Cost [Infographic]

What’s New in Project Resource Management (pt 6: Control Resources)

3 Soft Project Benefits [Video]

The Estimating Life Cycle

3 More Ways to Track Schedule Performance [Video]


Categories: reports


For more information and extra detail about who does what when it comes to project reporting at different levels of the organisation, you can check out this guide and infographic.

Posted on: January 09, 2018 06:57 PM | Permalink

Comments (6)

Please login or join to subscribe to this item
Thank you Elizabeth for sharing what kind of performance reporting should be done at what level.

KPI's are so important. Success needs to be tracked.

Thanks for the overview.

Thanks for posting.

Liz: I think an additional point to be covered in the video is the one related to the amount of resources already spent against the scheduled resources at one point in time and to compare it against progress. This last comparison gives de degree of deviation; if project is correctly performed, such a deviation has to be zero.