#ChooseYourWoW | #ContinuousImprovement | #Kaizen | #ProcessImprovement | Adoption | agile | Agile certification | agile transformation | Analogy | Architecture | architecture | book | Business Agility | Certification | Choose your WoW | CMMI | Coaching | Collaboration | Compliancy | Configuration management | Construction phase | Context | Continuous Improvement | COVID-19 | Culture | culture | DAD | DAD discussions | DAD roles | Data Management | database | DevOps | Discipline | disciplined agile delivery | Documentation | DW/BI | Enterprise Agile | Enterprise Architecture | Enterprise Awareness | Essence | Evolving DA | Experiment | Financial | GDD | Geographic Distribution | global development | Goal-Driven | goal-driven | goals | Governance | Guideline | Hybrid | Improvement | inception | Inception phase | Kanban | Large Teams | Lean | Lifecycle | lifecycle | Metrics | mindset | News | News and events | Non-Functional Requirements | non-functional requirements | Operations | Outsourcing | People | Philosophies | Planning | PMI | PMI and DA | Portfolio Management | Practices | Principle | Process | process improvement | Product Management | Product Owners | Program Management | Project Management | Promise | quality | Release Management | Requirements | requirements | Reuse Engineering | Risk management | RUP | Scaling | scaling | scaling agile | Scrum | Support | Surveys | Teams | Technical Debt | Terminology | Testing | testing | Toolkit | Transformation | Workflow | show all posts

About this Blog

RSS

View Posts By:

Scott Ambler
Glen Little
Mark Lines
Valentin Mocanu
Daniel Gagnon
Michael Richardson
Joshua Barnes

Recent Posts

Failure Bow: Choosing Between Life Cycles Flowchart Update

Evolving Disciplined Agile: Guidelines of the DA Mindset

Evolving Disciplined Agile: Promises of the DA Mindset

Evolving Disciplined Agile: Principles of the DA Mindset

Evolving Disciplined Agile: The DA Mindset

Strategies for Capturing Quality Requirements

Agile modeling

Quality requirements, also known as non-functional requirements (NFRs), quality of service (QoS) or technical requirements, address issues such as reliability, availability, security, privacy, and many other quality issues.  The following diagram, which overviews architectural views and concerns, provides a great source of quality requirement types (the list of concerns).  Good sources for quality requirements include your enterprise architects and operations staff, although any stakeholder is a potential source for them.

Figure 1. Architectural views and concerns.

Architecture Views and Concerns

Why Are Quality Requirements Important?

Stakeholders will describe quality requirements at any time, but it’s particularly important to focus on them during your initial scoping efforts during Inception as you can see in the goal diagram below for Explore Initial Scope.  Considering quality requirements early in the lifecycle is important because:

  1. Quality requirements drive important architecture decisions. When you are identifying your technical strategy you will often find that it is the NFRs that will be the primary drivers of your architecture.
  2. Quality requirements will drive some aspects of your test strategy. Because they tend to be cross-cutting, and because they tend to drive important aspects of your architecture, they tend to drive important aspects of your test strategy.  For example, security requirements will drive the need to support security testing, performance requirements will drive the need for stress and load testing, and so on. These testing needs in turn may drive aspects of your test environments and your testing tool choices.
  3. Quality requirements will drive acceptance criteria for functional requirements (such as stories).  Quality requirements are typically system-wide thus they apply to many, and sometimes all of your functional requirements.  Part of ensuring that your solution is potentially consumable each iteration is ensuring that it fulfills its overall quality goals, including applicable quality requirements.  This is particularly true with life-critical and mission-critical solutions.

Capturing Quality Requirements

Figure 2 depicts the goal diagram for Explore Scope.  As you can see, there are several strategies for exploring and potentially capturing quality requirements.

Figure 2. The goal diagram for Explore Scope (click to enlarge).

Explore Scope process goal

Let’s explore the three strategies, which can be combined, for capturing quality requirements:

  1. Technical stories.  A technical story is a documentation strategy where the quality requirement  is captured as a separate entity that is meant to be addressed in a single iteration.  Technical stories are in effect the quality requirement equivalent of a user story. For example “The system will be unavailable to end users no more than 30 seconds a week” and “Only the employee, their direct manager, and manager-level human resource people have access to salary information about said employee” are both examples of technical stories.
  2. Acceptance criteria for individual functional requirements.  Part of the strategy of ensuring that a work item is done at the end of an iteration is to verify that it meets all of its acceptance criteria.  Many of these acceptance criterions will reflect quality requirements specific to an individual usage requirement, such as “Salary information read-only accessible by the employee,”, “Salary information read-only accessible by their direct manager”, “Salary information read/write accessible by HR managers”, and “Salary information is not accessible to anyone without specific access rights”.  So in effect quality requirements are implemented because they become part of your “done” criteria.
  3. Explicit list.  Capture quality requirements separately from your work item list in a separate artifact.  This provides you with a reminder for the issues to consider when formulating acceptance criteria for your functional requirements.  In the Unified Process this artifact was called a supplementary specification.

Of course a fourth option would be to not capture quality requirements at all.  In theory this would work in very simple situations but it clearly runs a significant risk of the team building a solution that doesn’t meet the operational needs of the stakeholders.  This is often a symptom of a teams only working with a small subset of their stakeholder types (e.g. only working with end users but not operations staff, senior managers, and so on).

Related Resources

Posted by Scott Ambler on: January 23, 2018 01:17 PM | Permalink | Comments (0)

New goal: Develop Initial Test Strategy

Categories: Goal-Driven, Testing

Fire works

We have recently published a new Inception process goal, Develop Initial Test Strategy.  The potential need for this goal was identified a little over a year ago by an organization that we were actively working with and since then we have worked with several other organizations where it was also clear that this process goal was needed.

The basic idea is that during the Inception phase the team should consider developing an initial test strategy so as to identify how they will approach verification and validation. This includes thinking about how you intend to staff your team, organize your team, capture your plan, approach testing, approach development/programming, choose a platform for test environment(s) platform, choose a platform equivalency strategy, test non-functional requirements, automate test suites, obtain test data, automate builds, report defects, and govern your quality efforts. The goal diagram is depicted in Figure 1 and the update goals overview for Disciplined Agile Delivery (DAD) is shown in Figure 2.

Figure 1. The goal diagram for Develop Initial Test Strategy.

Develop Initial Test Strategy process goal

Figure 2. The process goals diagram for DAD.

The Process Goals of Disciplined Agile Delivery (DAD)

Posted by Scott Ambler on: January 30, 2017 01:02 PM | Permalink | Comments (0)

When Should You Assign Points to Defects?

Categories: Technical Debt, Testing

A common question that we get from teams who are new to agile is whether you should assign points (sizes) to defects.  From a Disciplined Agile point of view we know that the answer will vary depending on the context of the situation, or in other words “it depends.”   The really disciplined answer though is to say on what it depends, which is what we explore in this blog.

Rod Bray, a senior agile coach at Scott Ambler + Associates, suggests this principle:

Don’t reward people for shoddy work

An implication of this is that if a team is injecting defects, they’re producing shoddy work, then it makes sense that their velocity suffers when they have to spend time fixing those defects.  The decrease in velocity is a visible trigger to investigate, and address, the cause of the productivity loss.  But what if the “shoddy work” wasn’t caused by your team?  What if the “shoddy work” was previously acceptable to your stakeholders?  Hmmm… sounds like the context of the situation counts in this case.  The following flowchart works through common thinking around when to size a defect.  Note that this is just our suggestion, your team could choose to do something different.  Let’s work through common scenarios to understand whether defects should be sized or not.  These scenarios are:

  1. Is it existing technical debt?
  2. The defect is injected and found by the team
  3. The defect is found by independent testing
  4. The defect is found after the solution is released

 

When do you size defects

 

Do you size the repair of existing technical debt?

The quick answer is sometimes.  For the sake of discussion we’ll assume that this technical debt has existed for a long time, potentially years.  From a purist point of view technical debt may be injected at any time (this is obviously true) and as a result may only be seconds old.  In the case of technical debt that is very new, refer to the logic below.

The key issue is whether fixing the defect is going to be a substantial effort. This of course is subjective.  Is the work substantial if it’s less than an hour of effort?  Several hours?  Several days?  Several weeks?  This is a bar that your team will need to set.  Something that will impact your schedule is likely to be substantial (and something your Product Owner is likely going to want to prioritize so that it can be planned for appropriately).  Clearly a defect that takes several days or more to fix is substantial and one that takes less than an hour is likely not.  Something that takes several hours or a day or so is likely something you need to think about.

 

Do you size defects injected and by found by the team?

No, the exception being technical debt (see above).  This falls under the principle of not rewarding the team for shoddy work.

 

Do you size defects found by independent testing?

Some teams, particularly those working in regulatory environments or working in complex environments, may be supported by an independent test team.  An overview of the independent testing strategy is presented below.  With the exception of the defect being found in existing technical debt (see above), the defect should not be sized.  Once again, the principle described earlier holds.  Of course if you don’t have an independent test team supporting your team then obviously you can ignore this question.

Independent agile testing

 

Do you size defects found in production?

The answer is sometimes.  As you can see in the high-level lifecycle diagram below, the DA toolkit explicitly recognizes that change requests are often identified by end users of an existing solution.  These change requests are effectively new requirements that should be prioritized and worked on appropriately.  Many organizations will choose to distinguish between two types of change requests, defects and enhancements, so that they may be treated differently.  The issue is that defects are often tracked and, if the team is smart, they are analyzed to determine how they got past the team in the first place.  Additionally you may find that defects and enhancement requests are charged for differently (a topic for a future blog).

Disciplined Agile Lifecycle - High Level System

If you don’t distinguish between defects and enhancement requests then there’s nothing to do, you simply treat the change request as a new requirement and size it like you normally would.  But if you do distinguish between types then you need to think about it a bit.  If the defect is found during a warranty period then it shouldn’t be charged for. Sometimes, particularly when work is being outsourced, there is a warranty period of several weeks or even months after something is released where the development team is expected to fix defects for free.  In this case you likely wouldn’t size the work in line with the principle described earlier.  Once you’re out of the warranty period then it’s likely you want to assign points to it: The functionality in question passed testing and was accepted by your stakeholders, so they in effect have taken responsibility for it.

To summarize, the answer to the question “Should we assign points to a defect?” is “it depends.”  In this blog we explored in detail why this is the case and described when and when you wouldn’t want to assign points.

I’d like to thank Kristen Morton, Rod Bray, and Glen Little for their insights which they contributed to this blog.

Posted by Scott Ambler on: October 30, 2016 10:40 AM | Permalink | Comments (0)

Independent Testing and Agile Teams

Categories: Scaling, Testing

The majority of testing, and in simple situations all of it, is performed by an agile delivery team itself. This is because we strive to have cross-functional “whole teams” that have the capability and accountability to perform the activities of solution delivery from beginning to end.   For organizations new to agile this means that you embed testers on agile teams and for organizations experienced in agile that you’ve managed to motivate agile team members to gain testing skills over time (often via close collaboration with other people who already have those skills).

This blog is organized into the follow topics:

 

Parallel Independent Testing

The whole team approach to development where agile teams test to the best of the ability is a great start, but it isn’t sufficient in some scaling situations. In these situations, described below, you need to consider instituting a parallel independent test team that performs some of the more difficult or expensive forms of testing. As you can see in Figure 1, the basic idea is that on a regular basis the development team makes their working build available to the independent test team. This may happen several times an iteration – we’ve seen teams do so at the end of each iteration, on a nightly basis, as part of their continuous deployment (CD) strategy. How often this occurs needs to be negotiated between the two teams.

Figure 1. Independent testing with an agile team.

Independent agile testing

The goal of this independent testing effort is not to redo the confirmatory testing that is already being done by the development team, but instead to identify the defects that may have fallen through the cracks. The implication is that this independent test team does not need a detailed requirements speculation, although they may need updated release notes including a list of changes since the last time the development team sent them a build. Instead of testing against the specification, the independent testing effort typically focuses on:

  1. Investigative/exploratory testing. Confirmatory testing approaches, such as test-driven development (TDD), validate that you’ve implemented the requirements as they’ve been described to you. But what happens when requirements are missed? What happens when requirements are narrowly focused on a point-specific solution, but not the overall ecosystem? User stories are a great way to explore functional requirements but defects surrounding non-functional requirements such as security, usability, and performance have a tendency to be missed by teams new to this approach.
  2. Production readiness testing. This is sometimes called pre-production system integration testing. The system that you’re building must “play well” with the other systems currently in production when your system is released. To do this properly you must test against versions of other systems that are currently under development, implying that you need access to updated versions on a regular basis. This is fairly straightforward in small organizations, but if your organization has dozens, if not hundreds of IT teams underway it becomes overwhelming for individual development teams to gain such access. A more efficient approach is to have an independent test team be responsible for such enterprise-level system integration testing.
  3. Difficult testing. Many forms of testing require sophisticated skills and sometimes even expensive tooling. Security testing is a classic example.

 

Why Independent Testing?

There are several reasons why you should consider independent testing:

  1. Regulatory compliance. Disciplined agile teams that find themselves in strict regulatory compliance situations, typical in systems engineering and life critical environments, may need to perform independent testing by law. Having said that, only a portion of your testing efforts will need to be performed independently. We have yet to run into a regulation that says that all of your testing needs to be performed independently, although we have seen several organizations that choose to interpret the regulations that way.
  2. Production readiness testing is exponentially expensive in multi-team environments. Development teams may not have the resources required to perform effective production readiness testing, resources that from an economic point of view must be shared across multiple teams. For example, if there are 5 other development teams in addition to my own then chances are that each team can do the work required to integrate and test against the builds of the other teams. But what about if there’re ten other teams? Twenty? Fifty? It becomes exponentially expensive for each team to do this integration and testing work as the number of teams increases. The implication is that you will discover that you need an independent test team working in parallel to the development team(s) that addresses these sorts of issues.
  3. The average cost of fixing defects is exponentially expensive the longer you wait. For close to four decades Barry Boehm, and other researchers, have gathered data showing that the average cost of addressing a defect rises exponentially the longer it takes to fix. This is depicted in Figure 2. The implication is that we want to find defects as early as we can, in fact ideally we want to build quality in from the start and not inject the defects to begin with. In traditional environments we would have left some forms of testing, in particular system integration testing (SIT) and user acceptance testing (UAT) to the end for the convenience of the people doing the testing (“we need to have everything in place before we can test it”). This results in very expensive and risky defect repair. Parallel independent testing often proves to be a bit more complex for testers, at least at first, but results in much more economical repair efforts.
  4. Complex technical environments. When you’re working with multiple technologies, legacy systems, or legacy data sources the testing of your system can become very difficult. System integration testing (SIT), performance testing, load testing, and security testing become more complex and more important in these situations.
  5. Large or geographically distributed teams. Large agile teams or geographically distributed agile teams are often subdivided into smaller teams, and when this happens system integration testing of the overall system can become complex enough that a separate team should consider taking it on. In fact, SAFe prescribes this with their System Integration Team strategy (which is virtually identical to this strategy). Granted, the reason why you have such teams is because you’re facing either significant domain or technical complexity.
  6. Outsourcing. Teams that are organizationally distributed, for example when some of the work is being outsourced to another organization, will very likely want to perform independent testing to validate the work being performed by the other company(es).  Read this article about agile outsourcing strategies.

 

Figure 2: Average cost of change curve.

Average cost of change curve

 

Questionable Reasons to Adopt Independent Testing

We’ve run into a few rather poor excuses to justify independent testing over the years:

  1. Your testing/quality staff prefer to work in a traditional manner. They may insist on testing from a detailed requirements specification, testing that is better performed by the team. They may insist on waiting to test the entire solution once it’s ready, instead of incrementally testing the system while it’s being built (enabling much cheaper defect fixing as discussed earlier). They may insist on all testing being done independently, instead of embedding people with testing skills on solution delivery teams. All of these strategies are choices that reflect a traditional culture, not an agile one. The real solution is to overcome these cultural challenges and help them to gain the skills and mindset required to work in an agile manner.
  2. Testing is outsourced. Some organizations will choose to outsource their testing to an external organization that is focused on testing.

 

But That Isn’t Agile!

Bullshit! Please excuse my language. Disciplined agile is pragmatic, going beyond the limited approach promoted by many agile purists.  These purists will claim that you don’t need parallel independent testing, and in simple situations this is clearly true. The good news is that it’s incredibly easy to determine whether or not your independent testing effort is providing value: simply compare the likely impact of the defects/change stories being reported with the cost of doing the independent testing. In short, whole team testing works well for agile in the small, but for more complex systems and in some tactical scaling situations you need to be more sophisticated.

Posted by Scott Ambler on: August 02, 2016 07:07 AM | Permalink | Comments (0)

Recovery Testing

Categories: quality, Testing, testing

Tester - canstockphoto10102295 - small

by Danial Schwartz

In Disciplined Agile Delivery (DAD), testing is so important we do it all the way through the lifecycle. One approach that your team will need to consider performing is recovery testing, which is used to see the ability of a system to handle faults. If a fault occurs, does the system keep working and does not stop? In case of a fault can the system recover within a specified period of time? In the event of a critical failure will damage such as physical, economical, health related, etc., result or not?

Recovery testing constitutes of making the system fail; then the results of system recovery are observed. The efficiency of the system to return to normal and the time it takes to do so are examined. The disturbances which can result in failure and need to be checked vary from product to product and from industry to industry.

Consider the healthcare industry and medical devices. When products are developed for the health care industry they have to be in strict accordance with FDA guidelines. They also have to adhere to the guidelines provided by the company for which the product is being made. When recovery tests are made they naturally have to comply with these strict rules. The tests require validation and so does the environment in which they are to be carried out.

The Defense Industry consists of complex systems embedded within one another. The interlink of the systems requires recovery testing which takes into account how different systems affect one another. Since the industry has to deal with harsh environmental variables, these have to be replicated for recovery testing. Doing so is no easy task.

Cloud applications are increasing in popularity. They are part of cloud systems. The cloud systems, in turn, are made up of commodity machines. This allows taking advantage of economies of scale. But this results in needing to use complex software which makes recovery testing quite a challenge.

Before a recovery test can be carried out, the software recovery tester has to make sure that recovery analysis has been undertaken. A fail over test is designed. The fail over test serves to determine that if a given threshold is reached, can the system allocate extra resources. It also serves to show if, in case of critical failure, a system can distribute resources and continue to operate or recover within a specified time.

Consider the example of a server which is reachable but it is not responding as one would expect it to. This is the fail-over cause. The result of this, known as the possible impact, could be a crash. The severity of the impact is medium to high. To simulate this one could initiate wrong responses on the server side.

Another example of a fail-over cause is a power supply failure. If the failure was in the auxiliary power source its possible impact could be a complete shutdown. This is critical. To simulate this the system could be subjected to a change in power strength or the power cord could simply be unplugged.

A low impact severity example includes a DB overload. This could result in slow response time. It could also result in information not being fetched from the DB leading to an error. Using appropriate tools a load test could be created to simulate this scenario.

At times a service might stop posing a low to high impact severity depending on the service which stopped. There might not be any possible impact or an application might stop working. To simulate this one could stop the service manually to see the possible impact.

The tester also has to ensure that the test plan and test environment are prepared, information is backed up, the recovery panel has been provided education and a record is kept of the techniques used for recovery.

Use of resources and having to deal with unpredictable possibilities makes recovery testing a daunting task, but its benefits are worth the trouble.  First, recovery testing improves the system quality. It removes risk since one knows that in case of a failure the system will continue to work.  Second, recovery testing results in a staff which is educated to perform recovery failure when need arise.  Third, recovery testing also fixes problems and mistakes in a system before it has to go live.  Finally, recovery testing shows how important recovery is and raises awareness of the fact that long term business continuity relies heavily on recovery management.

In conclusion, recovery testing is used to see how a system behaves when failure occurs. Recovery testing can be a tedious process but shows the efficiency of a recovery plan, educates the staff on how to deal with faults and failures which occur in systems, highlights the importance of recovery at times of crisis to members of the IT and business organizations, and shows how important it is to the long term success of a business to have a recovery strategy in case of a disaster.

 

About the Author

Danial Schwartz is a content strategist who sheds light on various engaging and informative topics related to the health IT and Q&A industry. His belief in technology, compliance and cost reduction have opened new horizons for people in the health care industry. He is passionate about topics such as Affordable Care Act, EHR,testing, test automation, and privacy and security of data.

 

Related Resources

Posted by Scott Ambler on: February 22, 2016 11:56 AM | Permalink | Comments (0)