This blog contains details about various aspects of PMI's Disciplined Agile (DA) tool kit, including new and upcoming topics.

About this Blog

RSS

View Posts By:

Scott Ambler
Glen Little
Mark Lines
Valentin Mocanu
Daniel Gagnon
Michael Richardson
Joshua Barnes
Kashmir Birk
Klaus Boedker
Mike Griffiths

Recent Posts

The Disciplined Agile Enterprise (DAE) Layer

Disciplined Agile (DA)'s Value Streams Layer

The Disciplined DevOps Layer

Would you like to get involved with the 20th Anniversary of Agile?

The Four Layers of the Disciplined Agile Tool Kit

The Disciplined DevOps Layer

Disciplined DevOps

The Disciplined Agile (DA) tool kit is organized into four layers, overviewed in Figure 1.  These layers are: Foundation, Disciplined DevOps, Value Streams, and Disciplined Agile Enterprise (DAE).  This blog focuses on the Disciplined DevOps layer.

Figure 1. The layers of the DA tool kit.

Disciplined Agile Layer Overview

How is "Disciplined DevOps" different from normal/mainstream DevOps? Mainstream DevOps is the streamlining of software development, information technology (IT) operations, and support.  This strategy is often depicted as an infinite loop as you see in Figure 2.  Disciplined DevOps is an enterprise-ready approach that extends mainstream DevOps to include critical activities around security, data management, release management, and business operations.  The high-level workflow for Disciplined DevOps is depicted in Figure 3

Figure 2. The classic DevOps workflow.

DevOps infinite loop

 

Figure 3. The workflow of Disciplined DevOps.

Disciplined DevOps workflow

Let's explore the components of Disciplined DevOps.  The hexes in Figure 3 represent process blades, sometimes called process areas. A process blade encompasses a cohesive collection of process options, such as practices and strategies, that should be chosen and then applied in a context sensitive manner.  Process blades also address functional roles specific to that domain as well as extensions to the DA mindset specific to that domain. The process blades of Disciplined DevOps are:

  1. Disciplined Agile Delivery (DAD)
  2. Security
  3. Data Management
  4. Release Management
  5. Support
  6. IT Operations
  7. Business Operations (from the Value Streams layer)

 

Disciplined Agile Delivery (DAD)

Disciplined Agile Delivery (DAD) is a people-first, learning-oriented hybrid approach to solution delivery. DAD teams focus on the creation of a new, or evolution of an existing, consumable solution for their customers.  A solution may include any combination of software, physical assets (e.g. hardware), documentation, changes to the supported business process, and changes to the organizational structure(s) of the people involved. A solution is consumable when it is usable, desirable, and functional. DAD enables a flexible way of working (WoW), supporting several lifecycles in a manner that is tactically scalable.

Security

The Security process blade focuses on how to protect your organization from both information/virtual and physical threats. This includes procedures for security governance, identity and access management, security policy management, incident response, and vulnerability management. As you would expect these policies will affect your organization’s strategies around change management, disaster recovery and business continuity, solution delivery, and vendor management. For security to be effective it has to be a fundamental aspect of your organizational culture.

Data Management

Data management is the development, execution and supervision of plans, policies, programs and practices that control, protect, deliver and enhance the value of data and information assets. DA promotes a pragmatic, streamlined approach to data management that fits into the rest of your organizational processes – we need to optimize the entire workflow, not sub-optimize our data management strategy. Disciplined agile data management does this in an evolutionary and collaborative manner, via concrete data management strategies that provide the right data at the right time to the right people.

Release Management

The release management process blade encompasses planning, coordinating, and verifying the deployment of solutions into production. Release management requires collaboration by the team(s) producing the solutions and the people responsible for your organization’s operational environment(s). In the case of organizations with a “you build it, you run it” DevOps mindset these people may be one in the same, although even in these situations you will often find a group of people responsible for governing the overall release management effort. In a true DevOps environment release management is fully automated for the intangible aspects (e.g. software and supporting documentation), and perhaps even some physical aspects, of your solution.

Support

Support focuses on helping customers/end users to work with the solutions produced by your delivery teams. Ideally your solutions should be designed so well that people don’t need anyone to help them but unfortunately it doesn’t always work out that way. So in many ways your support strategy is your “last line of defense” in your efforts to Delight Customers. Support goes by many names, including help desk, customer support, and customer care.

IT Operations

The primary aim of IT operations is to run a trustworthy IT ecosystem. From the point of view of your customers, you want to do such a good job that they don’t even notice IT. For older organizations this can be a challenge due to the existence of hundreds, if not thousands, of legacy systems that have been deployed over the decades. You may face daunting technical debt in these systems – poor quality data, overly complex or poorly written source code, systems with inadequate automated regression tests (if any), different versions of the same system, several systems offering similar functionality, numerous technology platforms, systems and technologies for which you have insufficient expertise, and more.

Business Operations

Business operations is one of the process blades of the value stream layer, although as you see in Figure 3 it is a critical component of the Disciplined DevOps workflow. Business operations focuses on the activities required to provide services to customers and to support your products. The implementation of business operations will vary by value stream, in a bank retail account services is implemented in a very different manner than brokerage services for example. Business operations includes help desk and support services (integrated in with IT support where appropriate) as well as any technical sales support activities such as training, product installation, and product customization. As you can imagine close collaboration with both your Sales and Marketing efforts is required to successfully Delight Customers.

Posted by Scott Ambler on: September 29, 2020 10:55 AM | Permalink | Comments (3)

How to Choose an Agile Release Cadence

Metronome

One of the things that a delivery team needs to do, often in collaboration with product management, is choose the release cadence of their product. This is an important aspect of, you guessed it, release planning.  Your release cadence defines how often you release your solution both internally and externally into production (or the marketplace). The issue is how to determine how often the product should be released into production. In this blog we explore:

  1. Where are you deploying to?
  2. What affects release cadence?
  3. What release cadence choices do you have?
  4. What do we recommend?

 

Where Are You Deploying?

There are several target environments that you might choose to deploy to. These environments include:

  1. Demo environment(s). Many teams maintain a demo environment for their solution so that their stakeholders can see what has been developed to date at their leisure. Demo environments support transparency with your stakeholders, reduce the number of “one-off” requests by stakeholders for demos (because they can simply see the solution for themselves), and of course they provide a stable environment in which your teams can run demos.
  2. Testing environment(s). Many teams have their own testing environments, or they work with independent test teams with their own testing environments, or both. You should strive to test as often and early as possible, an implication being that want to deploy into your test environment(s) as often as you possibly can.
  3. Production/marketplace. Some teams will release their solutions into their production environments (or to someone else’s cloud) where end users will use the systems. In the case of commercial software companies they will release their solutions into the marketplace where they are then sold to customers. Throughout this blog whenever we use the term production we also mean the marketplace.

For the sake of terminology, deploying into demo or testing environments are often referred to as internal releases and into production as an external release.

 

What Affects Release Cadence?

There are several factors that affect the choice of release cadence:

  1. Stakeholder needs. How often do your stakeholders, and in particular your end users, want your solution to be released? This can be a difficult issue because very often your stakeholders might not be able to perceive what is appropriate for them. We’ve seen stakeholders ask for quarterly releases, be delighted when then get monthly releases, and then start asking for weekly releases once they realize the potential of modern agile strategies.
  2. Stakeholder capability to accept change. We like to think that more often is better, and in the vast majority of situations it is. As difficult to believe as this may seem, at the far extreme we’ve also seen some systems where the natural release cadence is once every three or four years because that’s the rate at which stakeholders are able to accept change. In this case the product was a transaction processing (TP) system infrastructure product, but we’ve heard similar stories about major database management systems (DBMSs) products too. Granted, a release cadence this long is very rare but it does happen in a small number of situations. Far more common is the mistaken belief by IT professionals that their stakeholders are unwilling or unable to accept shorter release cycles. We’ve seen numerous organizations where the IT people tell us that their stakeholders can’t handle anything more regular than a quarterly or bi-annual release, yet these same stakeholders regularly use commercial software that is updated several times a week.
  3. Your organizational culture. Some organizations, particularly those with an existing traditional release management team, often have release cultures that lean towards larger and less frequent releases. These organizations often have significant investments in legacy systems and insufficient investments in automated regression tests/checks. As a result releasing solutions into production tend to be seen as a risky endeavour. At the other extreme we’ve seen companies with more of a continuous delivery mindset that have a “release as swiftly and often as you can” culture. These organizations have typically invested heavily in code quality, automated regression testing, and automated deployment thus making deployment a simple and virtually risk-free effort.
  4. The team’s ability to deliver. Of course a primary determinant of your release cadence will be how often you’re able to actually produce a potentially consumable solution. This is affected by the skills of your team members, your ability to collaborate, your ability to vertically slice functionality into small features, and your delivery infrastructure.
  5. Your delivery infrastructure. How easy it is to release a potentially consumable solution into production is determined in part by your technical environment. This includes the extent of your automated regression tests, your automated deployment scripts, and your capability to monitor production. In general, the greater the level of automation the more often you can release.
  6. Your solution architecture. Is your solution architected to be released incrementally? Is it possible to enable/disable functionality at a granular level (perhaps via feature toggles or a similar technique)?
  7. The cost/risk to release.   Cost and risk tend to go hand-in-hand when it comes to releasing solutions into production. This is because the more manual your release/deployment processes the more expensive they become and the more likely there are to be problems somewhere in the process. Conversely, the more you automate the overall deployment effort the cheaper it is to deploy and the less risky it becomes as you’re more likely to run into, and then automate a solution to, deployment problems. The less expensive and less risky it is to release your solution the more viable it becomes to release more often.
  8. Release cadence of other teams. Like it or not your team is likely dependent on the work of other teams. For example you may need web services being built by another team, and you can’t fully release your solution until those web services are available in production.  We’ve written detailed articles about how to manage dependencies between agile/lean and traditional teamsdependencies between agile teams, and dependencies between agile and lean teams.

 

Release Cadence Choices

Table 1 lists many common release cadences, from more than annual to several times a day. It also lists the potential tradeoffs of each approach and indicates when you may want to adopt each one.

Table 1. Comparing external release cadence options.

Strategy Potential Advantages Potential Disadvantages When to Apply
Many times a day Enables very short time to market

 

Enables teams to adapt quickly to changing stakeholder needs

Enables granular release of functionality

Requires extensive continuous integration (CI) and continuous deployment (CD) automation

 

Requires high discipline to maintain quality

Your solution architecture must support toggling of features to enable deployment of larger functions as a collection of smaller features

Effective for high-use systems, particularly those used by external customers in highly-competitive environments
Daily Same as above

 

Provides a regular (daily) release cadence that is predictable

Same as above Same as above
Weekly Provides a regular (weekly) release cadence that is predictable

 

Enables quick time to market and responsiveness to changing needs

Same as above Effective for high-use solutions, particularly e-commerce or BI/reporting systems

 

Appropriate for teams following the Lean lifecycle

Monthly Provides a regular (monthly) release cadence that is predictable

 

Enables quick time to market and responsiveness to changing needs

Requires extensive continuous integration (CI) and continuous deployment (CD) automation

 

Requires high discipline to maintain quality

Effective for medium-priority solutions

 

Appropriate for teams following the Agile/Basic lifecycle with one-week iterations or the Lean lifecycle

Quarterly Provides a regular (quarterly) release cadence that is predictable

 

Enables quick time to market and responsiveness to changing needs

Enables simpler requirements management practices (compared with longer release cadences) due to lower impact of a feature moving to the next release

This is a major milestone for teams moving towards an “advanced” lean-agile strategy as it motivates greater discipline.

Requires continuous integration (CI)

 

Requires automated deployment strategies

Effective for medium-priority solutions

 

Appropriate for teams following the Agile/Basic lifecycle with one or two week iterations

Variable Works well with a project mindset (although that’s questionable in and of itself) Teams need to be able to judge when their work reaches the minimally marketable release (MMR) stage and the business value added exceeds cost of transition. This decision point is captured in the DAD project lifecycles by the “sufficient functionality” milestone

 

Politics can hamper this decision point. You should put an upper limit on the acceptable time between release

Project teams

 

Stable teams assigned large “projects”

Bi-annual Good starting point for teams new to agile who are currently working on traditional projects with longer release cadences because it motivates adoption of disciplined strategies Can be difficult for stakeholders who are used to less frequent releases The team may need significant agile coaching as they will run into many of the “but we’re different and that agile stuff can’t possibly work here” type of problems
Annual Provides a regular (annual) release cadence that is predictable

 

 

Very risky, the team is likely to miss their date

 

Requires internal releases to obtain feedback

The deployment has likely become high risk because you do it so infrequently (self fulfilling problem)

Appropriate for low priority systems or for high-risk deployments (note that the deployments may have become high-risk because you do them so infrequently)
More than annual   See annual

 

 

See annual

 

This is common for infrastructure systems, such as a database or transaction managers, that have many other systems highly dependent upon them

 

Our Recommendations

When it comes to releasing your solution, we have several recommendations for you to consider:

  1. Automate, automate, automate. The more you have automated, the lower the cost of deployment and the lower the risk. This enables you to release more often with confidence.
  2. Release internally very often. This is your opportunity to get good at releasing your solution, at squeezing out the cost and the risk.
  3. Release externally as often as possible. The faster and more often you can release into production the more competitive your organization will be.
  4. Always look for ways to release more often. Impressed with your ability to release once a month? Aim for bi-weekly. You’ve now releasing bi-weekly? What’s stopping you from releasing weekly? Weekly releases? Meh! Release daily! Your team is releasing daily grandpa? How about automatically releasing many times a day every time you have a working build?

 

Further Reading

Posted by Scott Ambler on: August 19, 2016 07:59 AM | Permalink | Comments (0)

The Lean IT Operations Mindset

The Disciplined Agile (DA) toolkit describes strategies for how an organization’s IT group can support a lean enterprise.  An important part of this is to have an effective IT operations strategy, and to do that the people involved need to have what we call a “lean IT operations mindset.”  The philosophies behind such a mindset include:

  1. Run a trustworthy IT ecosystem.  At a high level the goal is to “keep the lights on.”  At a detailed level anyone responsible for IT operations wants to run an IT ecosystem that is sufficiently secure, resilient, available, performant, usable, and environmentally friendly.  Part of running a trustworthy ecosystem is monitoring running services so as to identify and hopefully avoid potential problems before they occur.  For some systems, and perhaps for your IT ecosystem as a whole, you may have service level agreements (SLAs) in place with your end users that guarantee a minimum level of trustworthiness.
  2. Focus on the strategic (long-term) over the tactical (short-term).  Anyone responsible for IT operations needs to have a very good understanding between the long-term implications of a decision versus the short-term conveniences.  A classic example of this right now is the preference of people building micro-services to use what they believe to be the best technologies for each service.  This makes a lot of sense from the narrow viewpoint of that service and it often proves to be incredibly convenient, and fun, for the developers because they often get to work with new technologies.  However, from an operational point of view you end up with a mishmash of technologies that must be operated and evolved over time, resulting in a potential maintenance nightmare.  Yes, you will still make some short-term decisions but you should do so intelligently.  Too great a focus on the long term results in a stagnant IT ecosystem, too great a focus on short-term decisions results in operations teams who spend all their time fighting fires.  The long-term technical vision for your organization is developed by your Enterprise Architecture efforts and the long-term business vision comes from your Product Management activities.
  3. Streamline the overall flow of work.  This arguably should be part of everyone’s mindset, but it is particularly important for people doing IT operations work.  IT operations has traditionally been a bottleneck in many organizations, often the result of the need to run a trustworthy ecosystem and to focus on long-term considerations, hence the need to focus on streamlining the overall flow of work. BUT, this isn’t just operational work that we need to streamline, but the overall flow of work into, within, and out of IT operations.  In this case we need a disciplined approach to DevOps that takes all aspects of the development-operations lifecycle into account, including the support of multiple development lifecycles (not just continuous delivery), the release management process, and the operational aspects of data management.  Of course, streamlining the flow of work goes beyond development-operations and is an important goal of your organization’s continuous improvement strategy.
  4. Help end-users succeed.  An important goal of people performing operations activities is to ensure that your end users are successfully using your IT systems.  It doesn’t matter how well your systems are built, or how trustworthy they are, if your end users are unable or unwilling to use them effectively.  End users are going to need help – you need to be prepared to provide a support function.
  5. Standardization without stagnation.  The more standardized your IT ecosystem is the easier it will be to run, to release new functionality into, and to find and fix problems if they should arise.  However, too much standardization can lead to stagnation where it becomes very difficult to evolve your ecosystem.  You will need to work very closely with people performing enterprise architecture and product management activities to ensure that you understand the long term vision and are working towards it.
  6. Regulate releases into production.   Most DevOps strategies reflect the viewpoint of a single product team.  But what about the viewpoint of your overall IT ecosystem, which may comprise hundreds of products?  An interesting question to ask is what is the WIP limit for releases across your overall ecosystem?  In other words, what rate of change can your infrastructure, and your stakeholder community, bear?  In the Disciplined Agile (DA) toolkit this philosophy is an important driver of the Release Management process blade.  Furthermore, some regulatory compliance regimes call out a separation of concerns pertaining to release management – the people building a product are not allowed to release the product into production, someone else must make that decision and do the work (even if “the work” is merely pressing a button to run a script).
  7. Sufficient documentation.  Yes, there will be some documentation maintained about your IT ecosystem.  Hopefully this documentation is concise, accurate, and high-level.  Common documentation includes an overview(s) of your infrastructure, release procedures (even if fully automated, there’s still some overview documentation and training), and high-level views of critical aspects of your infrastructure including security, data architecture, and network architecture.  Organizations that operate in regulated industries will of course need to comply to the documentation requirements of the appropriate regulations.  When infrastructure components are discoverable and self-documenting there is a lesser need for external documentation, but there is still a need.  Any documentation that you do create should be maintained under configuration management (CM) control.

Future blog postings in this series about IT operations and support will explore topics such as why you need IT operations and support, what activities you perform, and the workflow of doing such.

Posted by Scott Ambler on: June 01, 2016 10:13 AM | Permalink | Comments (0)

Disciplined Agile Release Management: External Workflow

In this blog posting, the latest in our ongoing disciplined agile release management series,  we overview the external workflows that release management is likely to be involved with.

Workflow With Other IT Teams

The following diagram overviews the major workflows that people performing the Release Management activity will have with others.  One interesting aspect of this diagram is that it shows that many IT delivery teams, which may be following different lifecycles or even tailored versions of one of the disciplined agile lifecycles, potentially feed production ready releases into the release management process.  In some organizations you may have a separate release management team doing this work.  Other organizations, particularly those that are well on the way to adopting a disciplined DevOps strategy, will often choose to have the delivery teams themselves do the release management work via a “you build it, you release it, you run it” mindset.  For now our focus is on the activities surrounding release management, not on the potential organizational structures to support it.

Disciplined Agile Release Management Workflow

The following table summarizes the workflows depicted in the diagram.

Process Blade Process Blade Overview Workflow with Release Management
Continuous Improvement Addresses how to support process and organizational structure improvement across teams in a lightweight, collaborative manner; how to support improvement experiments within teams; and how to govern process improvement with your IT department. Your continuous improvement efforts should result in improvement suggestions gleaned from other teams that whoever is doing release management can learn from.
Enterprise architecture Addresses strategies for collaborative and evolutionary exploration, potential modelling, and support of an organization’s architectural ecosystem in a context-sensitive manner. The enterprise architects will produce a technology roadmap that will reflect the current operational environment as well as the expected direction that it will head in. This information will be used as input into decisions regarding any technology strategies to support release management activities.  Release intelligence, measures surrounding your release management activities (such the number of releases put into production, the time/cost of each release, results from deployment testing, and so on) are made available to enterprise architects to be used as input into their decision making processes.
IT Delivery Addresses how to develop solutions in a disciplined agile manner.  This includes the four lifecycles – basis/agile, advanced/lean, continuous delivery, and exploratory – supported but DAD plus the program management blade (effectively a large team following one or more of the lifecycles). Your release management strategy will need to be able to support the range of development/delivery teams within your organization.  Because each team is potentially working in their own, unique manner, it implies that release management professionals (if any) will need to be sufficiently flexible to work with these teams in manners that reflect their chosen strategies.
IT Governance Addresses strategies for consolidating various governance views, defining metrics, taking measurements, monitoring and reporting on measurements, developing and capturing guidance, defining roles and responsibilities, sharing knowledge within your organization, managing IT risk, and coordinating the various governance efforts (including EA governance). The IT governance team will provide guidance to all IT teams, including anyone performing release management activities.  Release intelligence will be provided to the IT governance team so as to provide insight into the effectiveness of the release management effort.
Operations Addresses how to run systems, evolve the IT infrastructure, manage change within the operational ecosystem, mitigate disasters, and govern IT operations. Your operations group will provide operations intelligence (a range of measures, including current system statuses) that will be used to guide release management decisions.  For example, if a platform is currently down (perhaps it is being upgraded), then you would likely be blocked from deploying into that environment until it is available.  The release management activities will produce release intelligence measures that operations staff will use in their decision making around the consumability of aspects of the operational infrastructure.  For example, they may be interested in knowing the level of effort required to deploy into various platforms.
Portfolio Management Addresses how to identify potential business value that could be supported by IT endeavors, explore those potential endeavors to understand them in greater detail, prioritize those potential endeavours, initiate the endeavours, manage vendors, and govern the IT  portfolio. Your organization’s portfolio management monitoring activities will take advantage of any release intelligence made available to it.
Posted by Scott Ambler on: July 26, 2015 07:34 AM | Permalink | Comments (0)

Disciplined Agile Release Management: A Goal-Driven Approach

This posting, the latest in a series focused on a disciplined agile approach to release management, overviews the activities associated with release management. The Disciplined Agile (DA) toolkit promotes an adaptive, context-sensitive strategy.  The framework does this via its goal-driven approach that indicates the process factors you need to consider, a range of techniques or strategies for you to address each process factor, and the advantages and disadvantages of each technique.  In this blog we present the goal diagram for the Release Management process blade and overview its process factors.

The following process goal diagram overviews the potential activities associated with disciplined agile release management.

Release Management Goal Diagram

The process factors that you need to consider for release management are:

  1. Plan IT release schedule.  Your organization’s overall release schedule needs to be planned and communicated.  Many organizations have blackout periods where teams are not allowed to deploy into production (for example, many retail organizations will not allow non-critical production releases near the Christmas holidays).  There are many strategies that organizations may choose to adopt when it comes to scheduling releases, including release trains, release streams, ad-hoc releases, and release windows.
  2. Schedule solution release.  The release of an individual delivery team’s work needs to be scheduled so that it does not conflict with the releases of other teams who want to deploy into the same operational environment.
  3. Manage infrastructure configuration.  The release management team will work closely with your operations team, in fact they are often members of your operations team, to perform configuration management of your operational environment.  To safely deploy into production you must know what is currently in production and how those hardware and software elements depend on each other.  The more complex your operational infrastructure, and the more IT delivery teams you have, the more important this process factor becomes.
  4. Determine production readiness.  Part of the release process is to verify that the solution is ready to be deployed and that the stakeholders are ready to have it deployed to them.  The bigger and more infrequent your releases, the more this becomes an issue.
  5. Support delivery teams.  The release management team, when a separate one exists, will work closely with the IT delivery teams to help them deploy successfully.  This help may take the form of coaching the team on deployment techniques, on planning, and even working with them to automate their deployments.  The release management team will often help with deployment testing, the verification after the fact that a deployment was in fact successful.
  6. Govern releases.  Your organization’s overall release efforts should be governed, ideally with the aim to streamline those efforts as much as possible.  This governance will include the development of policies and guidelines pertaining to the release process as well as the identification and collection of pertinent metrics.

Release Management and DevOps

Release management is an important part of your Disciplined DevOps strategy. Having said that, many IT departments are still in their early days of adopting a DevOps approach yet still effective release management.  The implication is that the way that you approach release management will vary depending on how far down the DevOps adoption path you are.  For example, with no DevOps in place at all your release management activities are likely to be performed by a team that is completely separate from your IT delivery teams.  When you are in the process of adopting a DevOps mindset release management is likely to be a collaborative effort between the IT delivery teams and the release management team.  When you have fully adopted DevOps strategies release management is mostly performed by the delivery teams themselves.

 

Related Postings

Posted by Scott Ambler on: July 18, 2015 07:40 AM | Permalink | Comments (0)