Project Management

Baseplate Check Record

Keep track of your baseplates by project, client, structure, contractor and drawing number. This log has spaces for baseplate numbers, location, elevation and levelness of contact surfaces. Sign-off blocks are provided for the contractor and job inspector.

People who downloaded this item also downloaded . . .

Log in or sign up to download this deliverable
Log In
OR
Sign Up

ADVERTISEMENT

504
Downloads

Reviews (2)

Login/join to subscribe
ADVERTISEMENTS

"Only those who have been in the frying pan are really qualified to talk about the heat."

- Winston Churchill