See All

81 Elgin Street, Brantford, Ontario (12 May 15 - 1 Oct 15)
The project was basically renovation of an existing warehouse, demolition of mezzanine floor, introducing new structural steel elements in order to accommodate a new Wax Factory.
Technologies: TPO Roof Waterproofing, Various Equipment (Cranes, Excavators) and Dry Fall Spray Paint for the New ...
Industry: Construction/Architecture/Engineering
Role: Project Manager
Team:30


695 Bishop Street, Cambridge, Ontario (10 May 15 - 30 Oct 15)
The project was mainly to demolish part of an existing building and separate it into two properties in addition to renovation of both buildings and introducing new services.
Technologies: Special Shear Equipment for Demolition, Steel Cladding and Insulation for newly introduced exterior ...
Industry: Construction/Architecture/Engineering
Role: Project Manager
Team:25


Procurement Process Improvement, China (8 Aug 12 - 31 Dec 17)
The project and support office was established to assist the company's overseas projects in procuring material from the Chinese Market, Estimating Projects using material from the Chinese Market (Main...
Technologies: Strategic Agreements, Global Agreements, New Automated Procurement Systems for support of all Overse...
Industry: Construction/Architecture/Engineering
Role: Project Management Office
Team:75


Qatar Faculty of Islamic Studies, Qatar (1 Apr 11 - 15 May 14)
The work was mainly the construction of a faculty for the Islamic studies inside the premises of Qatar Educational City. The complex design of the faculty includes a huge prayer hall, Auditorium, Cla...
Technologies: Many new products and technologies were used on this project especially for interior finishes. It wa...
Industry: Construction/Architecture/Engineering
Role: Project Manager
Team:9000


Barwa Commercial Avenue, Qatar (10 Dec 08 - 31 Jul 12)
The work is mainly the construction of an 8.6 Kilometer long Commercial / Residential Buildings. The mixed development will encompass shops, offices and residential apartments with gross floor area of...
Technologies: New Progress Monitoring and Control system was introduced in this project do to the complexity of th...
Industry: Construction/Architecture/Engineering
Role: Team Lead
Team:2000