ALL    DOWNLOADS    ARTICLES    REFERENCE    PROCESS    ON-DEMAND WEBINARS   
TOOLS    TRAINING    LIVE WEBINARS    USER-GENERATED
Deliverable Templates    Project Plans    Checklists    Presentations   
Business Analysis,    Business Planning,    Component Reuse,    Configuration Management,    Construction,    Current Systems,    Database,    Design/Development,    Development Coordination,    Implementation/Support,    Iteration Planning,    Packaged Applications,    Process Management,    Project Management,    Quality Assurance,    Standards,    Strategic Planning,    Technical Architecture,    Testing,    User Requirements   

Language: All    English    French    Japanese    Portuguese    Spanish   
Access: All    Free    Premium   
Sort By: Newest    Title   
  All   A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

1104 items found

Page: 1 2 3 4 5 6 7 8 9 10 11......111 <prev | next>

Benefits Realization Planning Template

deliverable
by Andy Jordan

This template aims to tie business case commitments to specific tracking activities and measures. Not all projects will have objective measures, but it is not acceptable to ignore that form of benefit realization for all initiatives. This plan should be completed at the same time as the business case, and the measured and total benefits identified here should align with the commitments made in the business case.

Benefits Realization Planning Template (Japanese Translation)

PREMIUM deliverable
by Andy Jordan

このテンプレートは、ビジネスケースのコミットメントを特定のトラッキングアクティビティおよび指標に結びつけることを目指しています。すべてのプロジェクトが客観的な措置を講ずるわけではありませんが、すべてのイニシアチブのためのそのような形の利益実現を無視することは許されません。この計画は、ビジネスケースと同時に完了されるべきであり、ここで特定された測定された総利益とビジネスケースで行われたコミットメントとが一致する必要があります。

Benefits Realization Thought Guide

deliverable
by Andy Jordan

Does your organization have a process for ensuring that a strategic initiative's desired outcomes are thoroughly understood and achievable? This two-page document helps to structure thinking around identifying, quantifying and validating the benefits of a proposed project. By discussing and answering these questions, you will address the key areas of strategic alignment, analysis and accountability.

Benefits Validation Tracker

deliverable
by Andy Jordan

This tool tracks progress against proposed benefits for all project benefit metrics. It compares commitments/projections made in business cases with the actual outcomes. If your projects have purely objective metrics and you monitor performance over a fixed time period, you may wish to repurpose this template into Excel to take advantage of the calculation ability. For subjective metrics and/or variable time periods, this Word version provides more flexibility and easier tracking.

Bicycle Work Breakdown Structure (WBS) Example

deliverable
by Project Management Institute

This zip file contains the White Paper "The Work Breakdown Structure: A Brief Synopsis," a Bicycle Work Breakdown Structure in both Word and Excel, a Bicycle WBS Dictionary in Word and Excel, and a PDF Appendix of the Bicycle Work Breakdown Structure (WBS) Example. These resources are presented from the PMI Practice Standard for Work Breakdown Structure. PMI members can access a PDF of the full standard at no cost, and anyone can purchase a hard copy via the PMI Store.

Big Project Newsletter Planner

deliverable
by Joe Wynne

Get accurate, influential information out and squelch rumors and destructive speculation with this planning tool. It aids in establishing an effective newsletter and preparing each edition

Bottom-Up Cost Estimating Worksheet

PREMIUM deliverable
by Cyndi Stackpole

Bottom-up estimates are detailed estimates done at the work package level. Detailed information on the work package and other direct/indirect costs are used to determine the most accurate estimate possible. Use this worksheet to help you keep track.

Bottom-Up Cost Estimation Template

PREMIUM deliverable
by Venkata Sai Rambabu Potnuru

The Bottom-Up Cost Estimation Template is to estimate the cost of any portfolio, program or project by using the Bottom-Up Cost Estimation Technique. This template can be used in any type of industry. With the Bottom-Up Cost Estimation Technique, the overall cost of the project is estimated by breaking down the project into activities to the lowest level possible (similar to the Work Breakdown Structure). After considering the cost of each activity, the overall project cost is estimated.

Brainstorming Session Worksheet

deliverable

A crucial phase of the problem solving process is the brainstorming session. Use this worksheet to track and evaluate all ideas.

ADVERTISEMENT

Page: 1 2 3 4 5 6 7 8 9 10 11......111 <prev | next>

ADVERTISEMENTS

"Humanity has advanced, when it has advanced, not because it has been sober, responsible and cautious, but because it has been playful, rebellious and immature."

- Tom Robbins

ADVERTISEMENT

Sponsors