Project Management
ALL    DOWNLOADS    ARTICLES    REFERENCE    PROCESS    ON-DEMAND WEBINARS   
TRAINING    LIVE WEBINARS    USER-GENERATED

Language: All    English    Arabic    French    Japanese    Korean    Portuguese    Romanian    Russian    Spanish   
Access: All    Free    Premium   
Sort By: Newest    Title   
  All   A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z   _            ¿   É  

2960 items found

Page: 1 2 3 4 5 6 7 8 9 10 11......296 <prev | next>

Painting Checklist

deliverable

How to track a paint job from start to finish, including the quality of the paint as well as the quality of the painting itself.

Pair Programming

Wiki

Paired programming is an agile development technique in which 2 developers/engineers work together at the same workstation using same keyboard at a time,to improve the quality of deliverable. The main advantages of paired programming are:

Panoramic Project Planning

by Tom L. Barnett, PMP

Take the wide-view planning approach to reduce your next project’s blind spots.

Paper Chase

by Elizabeth Harrin

Project management generates plenty of paperwork, and it’s easy to lose track of all the changes that are made to various documents. Version control is a simple way to track those changes. Here are some techniques for managing your project documents to make sure that every team member is, quite literally, on the same page.

Paperless Projects

by Elizabeth Harrin

Everyone’s talking about going green, but many organizations are getting bogged down in how and where to start. When it comes to the document-laden world of project management, going paperless is a modest but important first step. It not only helps the environment, it can be more cost-effective and save you time.

Parachute Projects

by Kathleen Ryan O'Connor

When you're catapulted into an ongoing project, the situtation is often volatile, potential minefields abound, and there isn't much time to ramp up and get the existing team on your side. Revamping plans and schedules is almost always critical, but rarely sufficient. Here are seven best practices to hit the ground running.

Parametric Cost and Duration Estimation

Wiki

Parametric Estimation is an estimating technique which uses bottom-up approach to calculate estimated cost and duration based on inputs from historical data and project parameters. It is calculated based on mathematical relationship between historical data and other variables such as product output per day and cost per unit.

Parametric Estimating

Wiki

Parametric Estimation as the name suggests is based on parameters, a number of units you need to do. In many cases based on industry published tables, then adjusted by region and season. Some large organizations have built detailed historical data that can be used.

ADVERTISEMENT

Page: 1 2 3 4 5 6 7 8 9 10 11......296 <prev | next>

ADVERTISEMENTS

"If a man does only what is required of him, he is a slave. If a man does more than is required of him, he is a free man."

- Chinese Proverb

ADVERTISEMENT

Sponsors