Project Management

Earned Value/Risk Applied To Hydro Power Plant Design

Featuring

Premium Content
PMI Membership
$129 /year
(plus $10 application fee)
Sign up to view this on-demand webinar and get unlimited access to our library of webinars, time-saving templates and more.
PMI Membership perks include job opportunities, local chapters, respected publications, and standards.   Learn more
Already a PMI Member? Log in now.
Premium Content
PMI Membership
$129 /year
(plus $10 application fee)
Sign up to view this on-demand webinar and get unlimited access to our library of webinars, time-saving templates and more.
PMI Membership perks include job opportunities, local chapters, respected publications, and standards.   Learn more
Already a PMI Member? Log in now.
Premium Content
PMI Membership
$129 /year
(plus $10 application fee)
Sign up to view this on-demand webinar and get unlimited access to our library of webinars, time-saving templates and more.
PMI Membership perks include job opportunities, local chapters, respected publications, and standards.   Learn more
Already a PMI Member? Log in now.
45m 60s
Duration
1.00
PDUs
179
Views

Overview

Guatemala has embarked on an ambitious program to reduce dependency on oil-based power generation by 50% in 15 years. Based on the 2007 findings of the Institute of Energy of Japan, Guatemala has increased electrical generation from hydro power plants by installing power plants ranging from 5MW to 40MW. However there are risks arising from the needs of local communities and environmental groups requiring effective communication strategies. Further there are technical design risks associated with the calculation of head (altitude) and flow that drive the investments needed for the turbine, generator and piping diameter. Monte-Carlo simulation can be used to assess the confidence in field data for these design parameters.

NOTE: You must watch videos in their entirety and all the way through to the end for our system to record your viewing activity accurately. Learn more about PDUs on ProjectManagement.com.

Suggested Webinars




Talent Triangle Alignment

This video qualifies for the following PDUs:
 
PMP/PgMP
PMI-ACP
PMI-SP
PMI-RMP
PfMP
PMI-PBA
1.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
1.00
0.00
0.00
1.00
0.00
0.00

Learn about earning PDUs on ProjectManagement.com


Reviews (6)

Login/join to subscribe
ADVERTISEMENTS

"My sole inspiration is a telephone call from a producer."

- Cole Porter

ADVERTISEMENT

Sponsors