Project Management

Earned Value Management Systems - Lesson 1 of 2

September 21, 2016 12:00 PM EDT (UTC-4)

Platform: Adobe Connect
Capacity:
Duration: 60 min
Presenter: Henrique Nuno Saavedra Lemos de Moura


Support: Earning PDUs | Tips For Attendees

The webinar will first highlight process and human factors that lead to late acknowledgement of project performance issues. The webinar will then introduce the case for a solid control system as defined by the PMI Practice Standard for EVM and ANSI/EIA-748. Finally, the webinar will describe EVM basic metrics, as well as how to determine physical progress, variances, performance metrics, forecasts at completion and variance at completion.

At the end of this webinar, participants should be able to recognize the challenges, purpose and key performance metrics of a project control system based on Earned Value Management (EVM).

This webinar qualifies for the following PDUs:
 
PMP/PgMP
PMI-ACP
PMI-SP
PMI-RMP
PfMP
PMI-PBA
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
1.00
0.00
0.00
0.00
0.00
0.00


ADVERTISEMENT
Premium Content
PMI Membership
$129 /year
(plus $10 application fee)
Sign up to register for this webinar and get unlimited access to our library of webinars, time-saving templates and more.
PMI Membership perks include job opportunities, local chapters, respected publications, and standards.   Learn more
Already a PMI Member? Log in now.

ADVERTISEMENTS

"This planet has - or rather had - a problem, which was this: most of the people living on it were unhappy for pretty much of the time. Many solutions were suggested for this problem, but most of these were largely concerned with the movements of small green pieces of paper, which is odd because on the whole it wasn't the small green pieces of paper that were unhappy."

- Douglas Adams

ADVERTISEMENT

Sponsors