What Government PMs Really Do Not Want
| A basic characteristic of Project Management which is often given short-shrift is the aspect of being particularly applicable to unique work. By definition, projects are unique, and have a definitive beginning and end, which occurs when the documented scope has been attained to the customers’ satisfaction. But new software, buildings, and devices are being created all the time, right? And, in most cases, these projects deliver an improvement or advancement over the thousands of software packages, buildings, and devices already in existence, while still sharing many (if not most) of their predecessors’ characteristics. So, yeah, the project is unique in many ways, but it’s also very much like hundreds, if not thousands, of projects that went before, which is where the performance goals of such work tend to be derived. And this is where a lot of government PMs get really frustrated. Consider some of history’s greatest and truly unique projects, like the Manhattan Project, or the Apollo space missions. Yes, bombs, and rockets that could carry people into space, already existed, but these were different. No explosive had ever harnessed the power of the atom, and no space vehicle had ever come close to allowing an occupant to step foot on another heavenly body. Past the attainment of the primary scope, what could be used to evaluate these projects’ performance? The unfortunate tendency here is for those outside the PM structure to invoke performance parameters from the asset managers’ realm, i.e., the accountants, with the Return on Investment (ROI) being prime. There is a rather funny story about a time when Manhattan Project scientists were creating a device that needed large amounts of copper, then in short supply due to the war effort. However, silver had similar electrical characteristics, so the scientists asked Undersecretary of the Treasury Daniel W. Bell for 6,000 tons of silver bullion. Bell responded “Young man, you may think of silver in tons, but the Treasury will always think of silver in troy ounces!”[i] A quick calculation later, and the request was amended to 430,000,000 troy ounces of silver, whereupon it was granted. Now, put yourself in the shoes of a government oversight manager. Could you even begin to calculate the ROI of 6,000 tons of silver being diverted to industrial purposes? Even if you had the security clearance to know the precise nature of the science behind the request, it would be quite impossible to capture the value of contributing to the radical altering of the balance of geopolitical power that would result from the successful development of atomic weapons. Something similar happened within the Apollo Program. Pushing mass into outer space is very expensive, and the need to miniaturize and lighten the electronics needed to reach the moon became a priority. The solution came in the form of the integrated circuit. As put by Sharon Gaudin at the Computerworld website, The development of that integrated circuit, the forbearer to the microchip, basically is a miniaturized electronic circuit that did away with the manual assembly of separate transistors and capacitors. Revolutionizing electronics, used in nearly all electronic equipment today. While Robert Noyce, co-founder of Fairchild Semiconductor and then Intel Corp. is credited with co-founding the microchip, Jack Kilby of Texas Instruments demonstrated the first working integrated circuit that was built for the U.S. Department of Defense and NASA.[ii] The total cost of the Apollo Program was reported to the United States Congress in 1973 at $24.5B (USD). Since integrated circuits, and their progeny the microchip, are used in virtually all computers today, what can be said of their ultimate “value”? Microsoft is worth $483B[iii], Google is worth $101.8B[iv], and Amazon is worth $430B[v], and these are just three examples of prominent computer-based enterprises. None of these organizations would be in existence if not for widespread use of personal computers, personal computers which would not be in existence if not for the technology that brought us integrated circuits and microchips. The government program to put a man on the moon in the 1960s would radically alter the world’s economies, to the point that the United States’ $24.5B investment—as hefty as it must have been perceived in 1973 – has to be seen as comically small in terms of the economic benefits it eventually wrought. Just the three companies cited above represent a 745% return, adjusted for inflation. But just 10 years after Apollo 11 landed on the moon, a Gallup survey indicated that only 41% of Americans thought the benefit of landing on the moon outweighed its cost.[vi] Really. So, what is it that government PMs really do not want? They don’t want their truly unique projects’ performance to be evaluated unfairly. All things fail by irrelevant comparisons, and newly discovered technologies, by definition, are, at least to some degree, incomparable. If nothing else, can we at least stop pretending that the Return on Investment figure has a place in evaluating project performance? [i] Manhattan Project. (2017, November 20). In Wikipedia, The Free Encyclopedia. Retrieved 04:46, November 26, 2017, from https://en.wikipedia.org/w/index.php?title=Manhattan_Project&oldid=811268990 [ii] Retrieved from https://www.computerworld.com/article/2525898/app-development/nasa-s-apollo-technology-has-changed-history.html, 20:05 MST, 25 November 2017. [iii] Retrieved from https://www.quora.com/How-much-is-Microsoft-worth, 20:12 MST 5 November 2017 [iv] Retrieved from http://metro.co.uk/2017/11/24/how-much-money-is-google-worth-7106408/, 20:14 MST, 25 November 2017 [v] Retrieved from http://money.cnn.com/2017/04/04/investing/amazon-stock-900-alltime-high/index.html, 20:17 MST 25 November 2017. [vi] Retrieved from http://news.gallup.com/poll/3712/landing-man-moon-publics-view.aspx, 18:19 MST, 26 November 2017. |
What Government/Contractor PMs Really Want
| I think that there’s a major management science issue inherent in managing projects for the government – any government – but I have never seen it addressed in the PM periodicals. It has to do with the nature of the real customer, and how far removed they are from the actual transaction(s). I’ll explain by way of example. If I decide I want to buy a product or a service, I’ll do some research on the desired good or service, and will generally do more research as the anticipated price goes up. By the time I initiate the actual transaction, I’m spending my own money – based on how much I have budgeted (or can afford), balanced against the level of quality or capability I have determined best for my uses. In this scenario, waste is minimized – I have set the budget, and I have determined the parameters for a successful acquisition, so I’m in a position to let the competition among suppliers determine the best price for my target. This kind of purchase is known as a first-party transaction. In those instances where I am spending my own money, but for someone else’s benefit (gift-giving, for example), the price is still important to me, but I’m a little less concerned about the “perfect fit” aspect of the transaction. In those cases where I’m buying a gift for a family member who has been very specific about what they want, I do my best to accommodate them, assuming their very specific request fits within my budget. Similarly, if I am the recipient of a product or service that I'm not paying for (like being given a gift), then I’m keenly interested in the quality of the product or service, but a bit less concerned about its price. These are known as second-party transactions, and they have an increased opportunity for waste or abuse since the spending versus expected quality parameters are not as precisely aligned as in first-person transactions. Finally, in those instances where I’m neither the person paying for the product or service, nor the recipient or consumer, the opportunities for waste or abuse are magnified further due to the additional mis-alignment of an exact budget figure versus a clear picture of the precise nature of what is to be delivered. These are known as third-party transactions. Much of what most Western industrialized governments spend their money on falls in this category, as in government-furnished food, housing, or health care, and, predictably enough, much fraud, waste, and abuse is present in such programs. Meanwhile, back in the project management world… For managers in charge of government projects, such transactions tend to fall into the second-party category. Our government customers don’t actually pay for the projects out of their own pockets (“Do you have any idea how many points I get if I pay for that aircraft carrier using my Discover Card?”), but instead act as representatives for the actual buyers, those citizens who pay taxes. They can be counted on to become highly adversarial if the project looks like it’s going to bust its approved budget, but will usually be okay with the cost as long as that does not happen. Generally speaking, the customer will not be the actual person using or consuming the final product or service, but they are typically very closely related to those who do, and can be counted on to be extremely interested in the quality of the product. So, if the cost doesn’t mean as much as the delivered product, what can we expect our government customers to demand from their project managers? If you said “as much quality as they can wring out of the approved budget,” go to the head of the class. Because of this effect, the management effect most often associated with government representatives or PMs is scope creep (as opposed to a pathological focus on efficiency), since they seek the best value for their (somewhat fixed) budget. Conversely, contractor PMs are responsible for delivering a certain level of quality at a (somewhat fixed) budget, so their worries are two-fold: if they believe that the product or service being delivered is consistent with the quality standards depicted in the Statement of Work (SOW), but the customer disagrees, then a lot of churn can be expected in the execution of the project. The other issue is whether or not the project can be delivered on-time, on-budget. If it can, then everybody has a good day. But, if it can’t, the contractor PM must determine if the fault is with the efficiency or performance of the project team, or if the government PM has added scope informally, i.e. engaged in scope creep. If they have, and will admit to it, then a Baseline Change Proposal fixes the problem. But, if they have engaged in adding scope informally without owning up to it, or if the problem lies with the project team’s performance, the only available remedy is to try to tap any reserves (e.g., Management Reserve, or Contingency) that may be available. If no reserves are available, well, then everybody has a bad day. So, here’s the central focus of optimal government project management: well-defined scope. For the government PM, poorly-defined scope could allow an unscrupulous contractor to deliver sub-standard quality, while making a strong claim to having fulfilled the vague terms of the SOW and, therefore, the whole of the available budget. From the contractor’s point of view, poorly-defined scope could allow opportunistic government PMs to informally add upgraded quality or reliability standards that the contractor hadn’t planned nor budgeted for, leading (almost automatically) to the overrun condition discussed in the previous paragraph. It would all be much simpler if we could just give Naval Officers Discover Cards with really large limits…
|
More Likely Than…?
| According to The Daily Beast, there are a whole lot of things that are more likely to happen to you than winning the lottery, specifically, the American lottery MegaMillions (Note to my readers: I’m not shilling for MegaMillions, I’m just using them to point out the folly of Gaussian Curve aficionados). How these odds are calculated is not provided, but the following are supposedly more likely than winning a jackpot:
…among others. Keeping with my deep-seated skepticism about anything statisticians assert, I did a little digging on my own. Consider:
Again, I have no idea how these odds were computed, but verifiable performance reveals that these computations were, well, wrong. I mean, seriously – death due to asteroid apocalypse is more likely than something that’s happened 219 times since 2002? Do these people even read what they’re asserting? I think the reason that The Daily Beast’s published assertions were wrong has to do with the nature of calculating possible future outcomes. A “fair” coin – one that’s perfectly balanced, I guess – when flipped, will come up heads half the time, and tails the other half. Even here, though, causes me to wonder: how hard could it be for a patient person to learn to flip a coin in such a way as to lead to a result where the flipped coin would land the same side up as when it was positioned for flipping? I imagine it wouldn’t be easy, but it probably isn’t impossible. And, if this, the ultimate in binary-outcome randomness, can be influenced, what scenario can’t? Meanwhile, Back In The Project Management World… As I’ve maintained for years now, the future cannot be quantified, therefore the optimal project management strategy for any given situation cannot be calculated. The projected outcome from individual decisions may (or, realistically, may not) be estimable, but that’s not the same thing as calculating an optimal strategy. Even within the confines of game theory, the strategies that lead to maximizing a given participant’s payoff rarely translate to supposedly analogous real-life situations. But that doesn’t stop risk management experts from claiming that they can do so, no siree. If you think about it, though, there’s really nothing to stop them. When they are transparently wrong, they can always point to the occurrence that upended their “analysis” as being from the realm of the “unknown unknowns.” Convenient, huh? Now, I am aware that no risk management specialist worth the title claims to be able to predict the future with usable certainty. They will maintain that they are simply identifying risks that may negatively impact their organizations – until they aren’t, and insist that “opportunity management,” or “upside risk,” is part and parcel of risk management, even though those aspects of the word “risk” appear nowhere in any reputable dictionary. So, to the two or three remaining risk management specialists who read this blog, I have some advice for you. When generating an estimate of the things that are, say, more likely to happen to a person than winning the lottery, you might want to start with one critical data point: how many people tend to win the lottery? And, if it averages out to 14.7 people per year, seek out statistics on things that happen more often than that. Does this sound like common sense? Well, it is. Does it also sound simple? It most certainly is not, for it represents a paradigm shift in the way risk management is conducted. The implication is that the future, to the extent that it can be grasped in any meaningful way, is best projected based on past performance. Project-ruining occurrences tend to happen to project teams that historically perform poorly, no matter the identified and “quantified” cause. No amount of hyper-ventilating analysis based on Gaussian curves can change that. Now, if you’ll excuse me, I think I'll go buy a lottery ticket.
[i] Retrieved from https://www.thedailybeast.com/15-things-more-likely-to-happen-than-winning-mega-millions, 11 November 2017, 13:46 MST. [ii] Retrieved from https://www.quora.com/Fact-Vending-machines-kill-4-times-as-many-people-as-sharks-per-year-How-can-that-be on 13 November 2017, 18:45 MST. [iii] Retrieved from https://www.livescience.com/52613-identical-triplets-quadruplets-science.html on 13 November 2017, 18:46 MST. |
PM Technology Is Advancing – Are We?
| From an article entitled “Less Work For Mother,”: In the early 1960s, when synthetic no-iron fabrics were introduced, the size of the household laundry load increased again; shirts and skirts, sheets and blouses that had once been sent out to the dry cleaner or the corner laundry were now being tossed into the household wash basket. By the 1980s the aver- age American housewife, armed now with an automatic washing machine and an automatic dryer, was processing roughly ten times (by weight) the amount of laundry that her mother had been accustomed to. Drudgery had disappeared, but the laundry hadn’t. The average time spent on this chore in 1925 had been 5.8 hours per week; in 1964 it was 6.2.[i] Meanwhile, back in the PM world of the 1980s… I’m old enough to remember a time when, for contractors working for the United States Department of Defense, our cost and schedule performance reports would be typed (on an IBM Selectric®, no less) onto a printed form from the Government Printing Office. Of course, all of the calculations for the time-phased budget (Budgeted Cost of Work Scheduled, or BCWS), the Earned Value (Budgeted Cost of Work Performed, or BCWP), and actual costs (Actual Costs of Work Performed, or ACWP), as well as the associated indices and percentages, were done by hand, calculator (no, not the kind you had to hand-crank – don’t be ridiculous) or, on occasion, on one of the new-fangled spreadsheet programs (Lotus 1-2-3® was the favorite, although Quattro® was coming on strong. Microsoft Excel® wouldn’t become the go-to application for another decade[ii].). It was, obviously, somewhat time-consuming, but we consistently delivered our reports on-time, and somehow managed to bring in our projects (mostly) on-time, on-budget. Fast forward to the 21st Century, and the very idea of using a typewriter is absurd, much less for generating formal project performance reports. Both desktop computers and Project Management software applications have advanced significantly, so we’re all processing more and better PM information, right? Well, much like the change in clothes-washing technology meant more clothing was being cleaned, the new hardware and software capabilities are processing much more data. But is it better information? Meanwhile, back in the PM world of 2017… Certain guidance and procedure-generating organizations that I won’t name keep sending out missives on the subject of what constitutes more advanced PM information, much of it silliness. A few examples include:
Each of these is asserted due to a supposed vulnerability of project schedules that have multiple start-to-start, finish-to-finish, or high-float elements to hiding or camouflaging negative variances. I have never – and I do mean never – seen any hard data supporting this assertion. It seems to always based on hypothetical scenarios. Then there’s the ultimate data collecting and crunching waste, that of comparing the project’s time-phased budget to its actual costs. There was a time when anybody asserting that this is an appropriate (much less necessary) PM analysis technique would have been immediately recognized as a hack. But now, some guidance-generating organizations are actually calling for it to be performed, and even amped up: this analysis must now be executed at a level of granularity all the way down to the line-item level in the original basis of estimate as it compares to the line-item level in the general ledger. The reason why this analysis is provably useless at higher levels, but suddenly takes on the patina of legitimacy when it’s performed at a sufficiently detailed level, is not provided. Now back to the 1980s… It’s analogous to our 1930s American housewife, having access to 1980s clothes-washing technology, electing to run the exact same clothes through the washer to the dryer, and then simply loaded them back into the washer, without expanding the amount of laundry actually being cleaned. In order for the act of cleaning clothes to have any value whatsoever, the clothes in question must actually need cleaning. Similarly, in order for all of this advanced data processing capability to have any significance whatsoever, the resulting analysis must be relevant. Using advanced data processing capacity to deliver irrelevant data isn’t advancing Project Management science. It is, in fact, wasting time and energy when so many of the existing techniques, which have been shown to work (like the calculated Estimate at Completion), are being elbowed aside. Rather than embrace these “advanced” techniques, we would be better served making more use of the IBM Selectric®.
[i] Retrieved from http://www.americanheritage.com/content/less-work-mother, November 3, 2017, 20:36 MDT. [ii] Microsoft Excel. (2017, November 1). In Wikipedia, The Free Encyclopedia. Retrieved 02:43, November 4, 2017, from https://en.wikipedia.org/w/index.php?title=Microsoft_Excel&oldid=808192493. |
Rule #2: Go Back And Learn Rule #1
| As we wrap up October and its theme of Portfolio Management, I’d like to take some time to examine what it is that sets Portfolio Managers apart from other types of managers, and some of the ensuing implications. In last week’s blog I discussed how Portfolio Managers can be expected to be the targets of Asset, Project, and Strategic Managers, all of whom will want to sell their ideas of discipline pre-eminence: the Asset Managers will try to push the notion that all management is purposed towards maximizing shareholder wealth, the PMs will want an emphasis on meeting project performance goals with respect to scope, cost, and schedule, while the Strategic Managers will seek to maximize the organization’s market share. Going back further in time, this blog often takes aim at what I consider to be invalid management practices, notions, and information systems, and the business-decision follies that can (and do) result from their presence within the organization. Now, I want to combine these two notions into a hopefully useful insight that will add clarity to the Portfolio Managers job, if not make it out-and-out easier. Virtually all Portfolio Managers will be confronted with managers seeking to further their particular discipline’s organizational interest, usually at the expense of others (old conservative axiom: there are no solutions, only trade-offs). When these managers do so with clearly invalid techniques or strategies (and, yes, I’m looking at you risk managers), it’s relatively easy to identify and frustrate these actions. But what happens when the techniques being pushed have been proven to be useful or effective, but they’re being pushed into areas where they lose this effectiveness? The Significance of St. Crispin’s Day This past Wednesday was the 602nd anniversary of the Battle of Agincourt, where Henry V of England and his army of approximately 7000 were intercepted by a French army of over 30,000 in a field bounded on both sides by thick woods. Dating from even before the Battle of Cannae in 216 BC, numerically superior armies had great success by encircling their opponents, and attacking from all sides, particularly if the attacking forces had superior mobility (e.g., cavalry units available). But this technique was unavailable to the French, since the field of battle was relatively narrow and, as previously mentioned, bounded by forest. Even without the envelopment tactic available to them, the French were confident of victory, since not only did they outnumber the English, but their armor was superior as well. Unfortunately for the French, the field of battle had been recently ploughed, and it rained heavily the night before. By the time the vanguards of the two armies were within weapons range of each other, the French knights, wearing around 60 lbs. of armor, were exhausted and sinking into the mud, making them easy targets for the lightly (if at all) armored English longbow archers. The ensuing fighting resulted in an astonishingly lopsided victory for the English. As the martial equivalent of Portfolio Managers, the French leadership (Charles d’Albret) was, no doubt, thoroughly familiar with the traditional tactics of advancing his goals, in this case envelopment, or simply overwhelming the opponent with superior arms and armor. But 602 years ago those two techniques, as successful as they were in many other occasions, were not only ineffective, but disastrous for the superior French forces. The conditions on the day of battle had changed so significantly that the familiar strategies would have had to have been abandoned if there was to be any hope of victory, either by retreating to a place large enough for envelopment, or arranging to fight on more solid ground, or both. Meanwhile, back at the Portfolio Management Program Office Managerial advisors and their Management Information Systems (MISs) are thoroughly familiar with the traditional techniques and strategies that will allow the organization to advance on its overarching goals. The challenge for the Portfolio Manager is to quickly and accurately identify those situations where the traditional techniques do not work, and those advising their use must be ignored. In short, rule number one for the Portfolio Manager is to question every tactic, technique, or strategy that they’ve been taught will work in most (or all) managerial situations, and be prepared to abandon such approaches when the situation merits it. And rule number two: even rule number one should be questioned, from time to time. This is why those executives who seek to fulfill the role of Portfolio Manager, but can’t be convinced to alter their technical approach to management problems, will almost always represent one of the greatest threats to the overall success of the organization. If they can’t recognize their own moribund, staid, and pathology-ridden techniques and eliminate them, how can they be expected to do the same with the other types of management? |