linkedin twitter facebook Request to reuse this  
I rather envy those whose Project Management career trajectory happened in an organization that valued the practices and techniques of PM, and could provide a stable and reliable path forward over the long term within the industry. Or, rather, I should say that I would envy those people if they, in fact, existed.
Cynical? Maybe. It’s just that in the strong majority of organizations where I’ve been employed in a PM- or PM-derivative role, the truly stellar PMOs would eventually fall to executives who were, to some degree or another, hostile towards PM practices and techniques. In organizations with mediocre (or even lame) PMOs, the zeitgeist was, at best, neutral tolerance masquerading as acceptance. In between these two extremes are probably the most dangerous organizations for attempting to advance a career in Project Management, those that appear to be amenable towards it on the surface, but are, in reality, rather resentful of the whole codex.
But before I go into what strategies might be effective for advancing a career in these environs, I want to explore the ways that a given company might be gauged as to its willingness or capacity to graft PM practices into its existing business model. The answers to the following multiple-choice questions might be highly instructive to discovering this key parameter.
1.At your job interview, when the HR Director asks if you have any questions for them, and you ask where the PMO Director’s office is situated, the response is:
a.      Two doors down from the CEO, in the executive suite.
b.     One floor down from the CEO, and one floor above the Facility Manager’s.
c.      In a transportable building near the parking lot.
d.     What’s a PMO?
2.Where and when are the Project Review Meetings held?
a.      The third working day of each month, in the executive boardroom.
b.     Sometime during the second week of each month, when the PMO Director wants to have them, held in the Main Floor Conference Room.
c.      It depends on when the Chief Financial Officer closes the books – usually by mid-month, and held in the warehouse after most of the staff has gone home for the day.
d.     Down the street at Bob’s Bar and Grill, after some project or other has gone completely off the rails, and we’re trying to figure out who to blame.
3.How are Estimates at Completion (EACs) derived?
a.      The average of the three most accurate formulae listed in the NAVSEA Estimate at Completion study, depending on how far along the specific Project is.
b.     Just the Budget at Completion divided by the Cost Performance Index.
c.      We re-estimate the remaining work, add that to the cumulative actuals, and go with that.
d.     One of the Control Account Managers who shows up at Bob’s, the one who just lost a bar bet about drawing a square with three lines, gives us his “expert opinion.”
4.What are your minimum qualifications for a Project Controls Manager?
a.      We prefer a Masters’ Degree, in Business or some technical area, and at least one certification, ideally a PMP®, with at least ten years in the profession.
b.     College degree, cert is a plus, but not required. Five years in the field, knows how to drive a Critical Path Methodology software package, and has generated a Cost Performance Report in Format 1.
c.      A good administrative worker, who knows how to conduct a Performance Review.
d.     The CEO’s nephew/niece, who needs a managerial role.
If the answer was D to any of the above, or even an occasional C, you’re probably in a PM-hostile environment.
What to do now? First off, don’t put on airs. Give absolutely nobody any reason whatsoever to resent what you’re trying to bring to the organization. You’re there to offer a service, even if it’s one they don’t realize they desperately need, and confronting execs with evidence that they’re messing up, even if you are 100% right, is counter-productive in the extreme.
Next, you should know that your most powerful information stream stems from the calculated EAC. Amazingly, this can be derived with just two data points: the specific Project’s cumulative actual costs, and an estimate of their percent complete. Divide the cumulative actuals by that percent complete, and you have a fairly accurate EAC. Compare this EAC to the Project’s Budget at Completion (BAC), and you have management information gold: the projected Variance at Completion. Using those VACs from the Projects showing a major overrun, but have not informed upper management that they are in trouble, is your key. If you are the person informing the execs where they are in Project Portfolio trouble, when everyone else is saying everything is fine, you almost instantaneously become indispensable, haters notwithstanding.
And the payback for all of the organizational hostility you’ve had to deal with comes about on those occasions when you can document that the PMs of the Projects with the highest negative calculated Variances at Completion are the same ones making your corporate life difficult.
Posted on: February 11, 2026 09:53 PM | Permalink | Comments (2)

Key Career Development Insight: Si Vis Pacem, Para Bellum

linkedin twitter facebook Request to reuse this  
The Latin part of this blog’s title, roughly, if you want peace, prepare for war, is attributed to Publius Flavius Vegetius Renatus[i], though even George Washington used a derivative of it during his first address to a joint session of Congress, in 1790.[ii] My interpretation: if one desires their country to be at peace, then that country had better be prepared to defend that peace. What does all of this have to do with career development within the PM realm (ProjectManagement.com’s theme for January), GTIM Nation may ask? Well, I’ll tell you.
Meanwhile, Back In The Project Management World…
I have to believe that the point of developing one’s career – particularly within the management sciences – is to get to a place where your mastery of the techniques and philosophies of management can be appropriately (if not excessively) monetized, for the economic security of yourself and your loved ones, sure, but also to have left a contribution to the advancement of said management sciences (which, if we’re being frank, is measured by its economic success). Okay, fine, but how do we get there? To paraphrase the Latin part of the title, if you want to be a leader within PM, first become an excellent servant.
I once worked with a colleague – I’ll call him Dan – who had two particularly interesting interactions that are very illustrative. The company we worked for was medium-sized, but had encountered a sudden growth spurt, and had to convert its main conference room into a cubicle farm. These cubes were tiny, too, and Dan had been assigned to one. One morning a young woman arrived to move in to the cubicle across from Dan. She was the daughter of the company’s new Chief Executive Officer, freshly graduated from college with a business degree. As they got to know each other, as Dan would later tell me, it became obvious that this young lady had very high expectations of her career path, indeed. She was, in fact, appalled at both her office conditions as well as her relative placement within the organization. Keep in mind she had just graduated. She showed little knowledge of the company’s primary technical capabilities, its business practices or techniques, nor did she seem inclined to learn them. Her sense of entitlement was not just annoying, it was positively blinding her to the path that she would need to recognize and ultimately embrace – that her (corporate) worth had little to do with her degree or lineage, and more to do with her ability to provide a service to others. That would, in the long term, determine whether or not some PM would be willing to bring her onto the Project Team as they pursued the scope in front of them. Sure, her father being the CEO would, umm, encourage some PMs to give her a charge code; but, should she fail to deliver anything other than diatribes on how everyone else was getting it wrong (i.e., disagreed with her professors), even these would eventually seek to distance themselves from her.
I ended up moving on from this particular nepotism-addled company before Dan did, and had actually lost contact with him when, some years later, I was surprised to receive a phone call from him. He had moved on to some type of utility company that had hired Dan to set up their brand-new Project Management Office. Unfortunately, his “honeymoon” period had come to an abrupt end. Apparently the executive who had hired him had a level of enthusiasm for PM that was not shared by the others in the management team, making even the simplest of implementation attempts insanely difficult, if not impossible. I could tell by the tone of his voice that he was wound up pretty tight, too.
“You need to provide an information stream that’s indispensable to the anti-PM crowd.”
“Thanks, Captain Obvious. How exactly can I do that? They won’t even consider creating a Work Breakdown Structure!”
While I was pretty good at setting up critical PM-based information streams, I had never done it under conditions analogous to an organizational behavior and performance emergency room. I don’t remember precisely what I told him at that time. In retrospect, I should have advised the following tactics:
·Pull some targeted projects’ total budget from the general ledger.
·Get access to their cumulative actual costs by month.
·Find a way to pull an estimate of their percent complete, also by month.
·Create an Estimate at Completion for each project by dividing the cumulative actuals by the percent complete.
·Create a histogram that compares the Budget at Completion and the EAC, and sort it in order of largest negative Variance at Completion to largest positive.
·Send this report to the exec who initiated the PMO in the first place, but also to those opposed to it.
The point here is to resist the temptation to criticize or scold the organizational opposition, even in extreme anti-PM environs, and instead become a valuable servant, providing timely, accurate, and relevant management information to information-starved decision makers. Become an indispensable servant, and your journey towards a fully-developed career is far more likely to be successful. Or, Si dux esse vis, servus fias.[iii]


[i] Retrieved from https://en.wikipedia.org/wiki/Si_vis_pacem%2C_para_bellum on January 26, 2026, at 19:11 MST.
[ii] Ibid.
[iii] Retrieved from https://lingvanex.com/translation/english-to-latin on January 29, 2026, at 19:26 MST.
Posted on: January 29, 2026 09:36 PM | Permalink | Comments (1)

The Dark Side Of Career Development

linkedin twitter facebook Request to reuse this  
I attained my PMP® certification soon after I graduated with my MBA, and I’m pretty sure that if that version of Michael could have read this blog, his response would have been to think the author to be overly cynical at best, and likely a flat-out curmudgeon. Alas, young Michael, that’s not the case – I know everything you know, and a whole bunch more besides, much of it delivered somewhat painfully. For those members of GTIM Nation with fewer career advancement scars than I have, I have a few things to pass along.
First, the organization based on a pure meritocracy doesn’t exist. The closest may be United States Chess, where your standing equals your ranking, period. But even here players have been known to try to “psych out” their opponents, meaning that they will engage in allowed but bizarre tactics in-tournament to try and throw their opponents off of their games. When I was playing tournament chess back in high school, I once played against an opponent who was decked out in full ski clothing, including a parka and heavy mittens. He could barely move individual pieces.
I beat him, handily.
But back to the point of the creation of business models that, contrary to any of the Mission Statement or Company Values pablum, ultimately operate in ways that actually frustrate the most talented or insightful employees. Sure, demonstrated talent backed by hard work dramatically increases your chances of success, and those successes will normally lead to career advancement – but that’s not always the case. I had the misfortune to work for an organization chock-full of people who had become remarkably adept at distancing themselves from project failure, but glommed on to project successes like Great Lakes lampreys. So prevalent was this behavior that I had to wonder if it was being taught at some in-house seminar. When I, personally, was assigned the heavy lifting on a particularly difficult piece of scope, the “corporate” person assigned was nowhere to be found, and contributed absolutely nothing to its pursuit and completion. When it became clear that I was actually going to deliver on-time, on-budget, this fellow was suddenly in my office, hovering over me at each of the very last steps of the task, while still contributing nothing. Weeks later, during a review of the performing quarter, this person was being complimented for having “accomplished” this difficult task. My name wasn’t mentioned at all.
And then we have the Office Politicos, those whose main goal is to advance their own personal interests, even if such advancement comes at the expense of the others on whatever team is unfortunate enough to have them in its ranks. These people’s favorite tactic is the ex parte communication, where only one side of an argument is presented to decision-makers. These conversations aren’t confined to gossip or calumny – in fact, they don’t have to be personal at all. But there’s a reason why ex parte conversations are not allowed in the field of Law, and that reason extends to discussions about business and management decisions, as well. Attempting to influence any decision that impacts a Project Team (or other organizational unit) without bringing in the basis for alternatives is not only disingenuous, it dramatically reduces the odds that the optimal – or even workable – strategy gets selected.
The last scenario I want to address is the one where a new leader (or entire management team) is introduced into an existing PMO or other macro-organization. The brutal reality here is that loyalty, not merit or talent, is the coin of the realm when it comes to whose career is advanced, and whose is frustrated. I’m not without sympathy or understanding here: the new/transplanted leader/management team has, no doubt, experienced significant success using a set of specific management strategies and tactics, and are typically brimming with confidence that those strategies will work here, too, if only the extended organization embraces them. Unless the new manager/team is exceptionally advanced, anyone not a superior who even suggests that those new techniques aren’t necessarily optimal, or even workable, will be viewed as an obstruction to the newbies and their success narrative, an obstruction that must be neutralized (or even eliminated) immediately. It’s rather unfortunate that those who know this newbie effect to be true, and adjust their interactions accordingly, can be perceived as patronizing. True, some workers can be positively obsequious when dealing with higher-ups, and use this approach to get ahead. I hold these types of people to be very off-putting, if not insufferable, but that’s not what I’m talking about here. I’m talking about those who are genuinely pursuing a goal of excellence, but must face the fact that they may be in a position where whatever flag is being raised by the execs must be saluted. It’s a difficult situation, but one that will likely present itself somewhere along a PM’s career path.
Many other organizational behavior and performance pathologies exist that can disrupt the talented, hard-working PM’s career trajectory, unfortunately. But, as that career path unfolds, sticking with the pursuit of excellence approach, while more difficult, will pay dividends that the glommers, politicos, and organizational reality rejecters will never know.
And I can live with that.
Posted on: January 21, 2026 09:31 PM | Permalink | Comments (1)

Is PM Really Just A Fad?

linkedin twitter facebook Request to reuse this  
The short answer to the question in the title is no, of course not; however, I believe that there is a real danger that the codex we embrace as advanced practitioners of Project Management might be susceptible to a similar erosion of its acceptance across the management sciences realm, and that we as a PM community ought to do something to prevent that from happening. For GTIM Nation regulars who may take umbrage at my title, along the lines of “If you knew the answer to be ‘no,’ why did you pose the question? You didn’t do it for cheap clicks, did you?” I have this to say: also, no. If I was going for cheap clicks, I would have entitled this blog entry “Read This Blog, Or A Tarantula Will Bite Your Face.” Now, on to the fad problem.
The Financial Times had an article back in 2013, entitled “Where Others Failed: Top 10 Fads.”[i] Number 9 on this list is “Matrix Management.” I believe the author is in error here, as she mis-characterizes Matrix Management, and then goes on to disparage it. In organizations with considerable Project work, Matrix Management simply differentiates between the organization’s human resources (Asset Management), and its Projects’ demands (Project Management). It allows PMs to pursue delivering scope on-time, on-budget, while leaving issues about whether or not the engineers have sufficient certifications to the head of that pool of human resources. But author Lucy Kellaway[ii] didn’t check with me before Matrix Management made it to her list of “fads,” so there it is.
To be sure, some of the entries on this list I hold to be spot-on. Her assessment of the number 3 entry, Six Sigma, is chillingly accurate. Kellaway’s assessment centers on the overly complex techniques used by the “green belts” and “black belts,” and deservedly so. And yet, in my opinion even here she kind of misses the point. Six Sigma, the Quality Managers’ sensational push into overarching corporate culture, does not apply to everybody. Recall my oft-cited axiom Quality, Affordability, Availability: pick any two. For those organizations that have staked out market share in the Affordable and Available niche, a sudden embrace of Quality is absolutely not indicated, even if the majority of highly-placed and massively influential executives and academics hold it to be the thing to do.
And yet Six Sigma / Quality Management’s sudden rise and elongated decline provides an interesting model on how management fads experience sudden contagion, peak, plateau, and finally recede to the place approximately it had previously occupied in the management sciences realm. Motorola was its notable pioneer, in the late 1980s, followed closely by Honeywell, Dow Chemical, DuPont, and General Electric[iii]. About the same time Congress created a really cool national award dedicated to Quality, the Malcolm Baldridge Award. But as General Electric’s powerful influence on the universe of the Management Sciences began to wane in the early 2000s, so did Six Sigma’s popularity. Part of this loss of popularity was due, in my (and other’s) opinion, to an influx of consultants eager to push its precepts without a genuine understanding of its actual function, attempting to force its principles wayyyyy beyond products, and into processes and services where it really didn’t belong. Also, according to an article by Oliver Staley in QZ.com,
It didn’t help that Six Sigma has no owner, accreditor, or even a commonly agreed upon body of knowledge.[iv]
Meanwhile, Back In The Project Management World…
Quality was one of the eight major sections in the original PMBOK Guide®, considered integral to the overall PM process, and consuming an eighth of the questions on the PMP® Certification exam (at least when I took it. My PMP® number is 1004, so it was a while back). Which all leads us back to the question, could the same rapid-adaption, peak/plateau, and loss of widespread acceptance cycle hit PM?
I think we already have one of the two causal elements in place, where consultants and content providers pushing PM without a robust understanding of its proper place within overall business model development/maintenance are influencing the macro conversation. (This was, incidentally, the theme of my very first keynote speech, at a PM conference in Silicon Valley, that there are “charlatans” amongst us, and we should work to weed them out.) Typically, these can be readily identified by the way they make their assertions, in the “eat your peas”-style hectoring tone.
But the other causal element behind Six Sigma’s demise is notably absent from PM. We do, indeed, have a universally-recognized accreditor, AND a body of knowledge, and have had for some time.
Will the anchors of the PMBOK Guide® and PMP® accreditation be sufficient to prevent authors for business or management magazines of the future from declaring PM a fad? It should. And, if it doesn’t, then a tarantula should bite that author on the face.



[i] Retrieved from https://www.ft.com/content/3c7f1e40-a03e-11e2-88b6-00144feabdc0 on January 7, 2026, 19:02 MST.
[ii] Ibid.
[iii] Retrieved from https://www.qualitygurus.com/history-of-six-sigma/ on January 8, 2026, 18:30 MST.
[iv] Retrieved from https://qz.com/work/1635960/whatever-happened-to-six-sigma on January 8, 2026, 18:51 MST.
Posted on: January 10, 2026 10:33 PM | Permalink | Comments (1)

How To Monetize PM

linkedin twitter facebook Request to reuse this  
Yeah, I know this blog’s title appears to be somewhat inconsistent with ProjectManagement.com’s December theme of philanthropy – in fact, it’s kind of the opposite, examining ways that PM can be used as a tool to attract funds rather than charitably dissipate them. But such funds can’t be charitably dissipated if they’re not available in the first place, so I will proceed.
GTIM Nation is familiar with my assertion that, within a given organization, the demand for Project Management expertise can be highly cyclical, generally adhering to the following template:
·The young organization experiences an increase in the dollar value or visibility of its project portfolio, or a more mature org sees a significant overrun or late delivery.
·This prompts an awareness (for young organizations) or an urgency in advancing or recovering PM capability.
·New PM specialists are hired (or current PM-adjacent professionals trained), and put into their own organization, typically referred to as the Project Management Office, or PMO.
·Tools are selected for ascertaining cost and schedule performance, techniques for deriving scope, cost, and schedule baselines implemented, project review meetings scheduled, etc., etc.
·Areas where project performance is lacking get addressed by management, and, perhaps more importantly, projects that are doing fine get left alone by upper management, leading to an overall improvement in the cost and schedule performance of the portfolio.
·As the fears of experiencing a large overrun or late project delivery fade, some of the smaller projects (at first) will make the case that they do not need to use the cost/schedule performance systems that the larger projects use, nor should they have to participate in the project review meetings.
·The percentage of projects in the portfolio being covered by any type of valid cost/schedule performance measurement system continues to erode, along with the authority, influence, and budget of the PMO, until…
·One or more projects experiences a significant (or even catastrophic) overrun or late delivery, and the cycle begins again.
Naturally such fluctuations in demand directly impact PMO morale, retention and staffing which, in turn, advances or contracts PM capability maturity. I used to work with one brilliant Project Controls Team Lead who would remind his charges “You never know, we could all be run out of here tomorrow!” Seasoned PMO Directors are well aware of this pernicious cycle, and will often attempt to implement strategies that will lessen its effects. One of the primary methods for attempting to place a “floor” underneath the cycle (i.e., limit the extent that the PMO loses its authority/budget in times of low demand) is to set the elements of the PMO’s business practices into official organizational policy or procedures.
But here’s the problem with such attempts: projects are, by definition, unique. Procedures and requirements are, also by definition, designed to restrict the amount of latitude a given manager has in pursuing project objectives. Any procedural document with any oomph to it will almost certainly proscribe use of a managerial technique or strategy that’s appropriate for most of the projects within the portfolio, but not all of them (especially if there’s a requirement for doing risk management [no initial caps]). Sooner or later this appropriateness mismatch will be used to break through the “floor,” and the PMO will continue to hemorrhage relevance until the re-initiation of the cycle.
How can this cycle be broken? I don’t have the definitive answer to that question, but I would like to offer some ideas, beginning with this: I don’t believe you can stop the cycle by publishing procedures, so that technique should be abandoned. I think that the preferrable approach is more like the way food is offered in a cafeteria. Let the PMs choose for themselves if they want or need thoroughly documented and approved baselines, Earned Value or Critical Path Methodologies employed, Baseline Change Control Boards formed, and so forth; or, very simple cost/schedule performance measurement systems, informal reviews, loose configuration management boundaries (e.g., Agile), etc. Many who will tap into the more robust PM techniques will be compelled to do so by their customers, others may simply seek the confidence that they will be given sufficient warning when a project disaster looms. Still others will either have legitimate reason to avoid an advanced PM implementation for their scope, or they may simply be too arrogant (or ignorant) to employ one, but that’s okay. The PMO Director’s job, in my opinion, is not to humble or inform the latter, and attempts to do so often lead to overreach and frustration. Simply make PM strategies, exhibits and techniques available to the owners of the scope – because we all know what will happen. Those projects in the portfolio that avail themselves of the PMO’s assistance will consistently out-perform their counterparts in cost and schedule results. Projects may very well experience overruns and delays, but at least the PMO-covered ones will be able to provide early warning. Project disasters are never welcome, but there’s just something about them arriving as a surprise that makes them particularly galling to the execs.
Note that this analysis pertains only to the PMO within the macro-organization. The client organizations can issue procedures, guidance, and requirements to their heart’s content – it’s their money, after all. But if you want to monetize the PM application so that it attracts money, in my opinion, humbly offer it as a service – never push it as a mandate.
Posted on: December 27, 2025 09:35 PM | Permalink | Comments (3)
ADVERTISEMENTS

"Nearly every great advance in science arises from a crisis in the old theory, through an endeavor to find a way out of the difficulties created. We must examine old ideas, old theories, although they belong to the past, for this is the only way to understand the importance of the new ones and the extent of their validity."