Drilling Through Granite, Part 2

linkedin twitter facebook Request to reuse this  

In evaluating the whole concept of knowledge transfer, it’s sometimes easy to become frustrated with the amount of energy devoted to analyzing the topic. I mean, seriously, isn’t “knowledge transfer” what happens when people engage in conversation? How hard can it be? Well, recall the classic scene from Monty Python and the Holy Grail, where Michael Palin’s King character is trying to tell two guards to “Stay here and make sure he (meaning the prince standing four feet away) doesn’t leave.”? The guards, who appear otherwise normal, can’t understand the simple command and, in the movie at least, hilarity ensues. It can be that tough.

So, in the analysis phase communications experts will usually invoke some truisms, such as it’s the responsibility of the communicator to make the message clear to the receivers, and not the responsibility of the receivers to take in the transmitter’s intended true meaning. Generally speaking, that’s true, but the exceptions to the rule(s) are the dangerous elements here.

For example, back when I was writing the Variance Threshold column for PMNetwork magazine, I had an incident where a fellow wrote to my e-mail address taking me to task for a piece I had written on critical path scheduling, where I discussed variables to consider when deciding how to handle schedule float. This person wrote in a rather condescending tone, challenging my analysis on schedule float based on his assertion that float did not exist. I swear I am not making this up. At first I assumed that nobody who described themselves as a “senior scheduler,” as this person did, could be that ignorant, and therefore took his meaning as being akin to some of Eliyahu Goldratt’s work in the novel The Critical Chain.  In this – again – novel, the project manager protagonist transfers personnel from non-critical path activities to critical ones, thereby shortening the project’s overall duration. Of course, since the idea was being presented in a fictional venue, the tactic succeeded fantastically, the protagonists lived happily ever after, no character ever steps up and says “Hey! Isn’t that tactic identical to the old ‘crashing—the – schedule’ trick?”, and the body of project management theory had been altered (and not necessarily for the better).

Graciously assuming my provocateur was referring to this bit of shoddy management science, I responded with the reasons I thought “critical chain” was not valid. The e-mail writer wrote again, stating flatly that that wasn’t what he was talking about. Rather, he clarified that schedule float did not exist because (I’m paraphrasing), when a manager told a project team member to do something, well, then, by golly, that thing had to be done then. Clearly, this fellow was resistant to knowledge transfer, at least when it came to CPM or came from me. I was tempted to respond with something along the lines of “Stay here, and make sure he doesn’t leave,” but thought the better of it. I’ve had similar e-mail interactions with those who took exception to my criticizing risk management techniques, some of which were positively hysterical.

I think the common thread here is that, once a person creates an emotional attachment to something otherwise as innocuous as a project management theory, hypothesis, idea, technique or tactic, that facts and insight – knowledge – suddenly have a much harder time of being transferred into that person’s thinking. This may be due to (ironically enough) a derivative of the sunk-costs argument, where, say, a professional risk analyst assigned to a non-pharmaceutical project looks back on those semesters of statistics classes suffered through (strikethrough) taken and passed, and can’t understand why the Earned Value and Critical Path information streams are so much more valuable than his Monte Carlo simulations. Frustration sets in, and the next thing you know mildly unhinged missives start showing up in some columnist’s in-box.

In any event, evaluations of knowledge transfer are usually predicated on the notion that there exists persons willing and able to receive the knowledge, once proffered. I’m not sure that’s always the case.

Posted on: March 15, 2015 08:52 PM | Permalink | Comments (1)

What Goes Down Must Come Up

linkedin twitter facebook Request to reuse this  

One of my business school professors – I can’t recall if it was in Organizational Behavior and Performance, or Information Technology – once offered up an axiom, that knowledge and information transfer was a two-way street, and if attempts to squelch it were made, then such communications would manifest in unexpected ways. I accepted his assertion on its face, without really understanding what the implications were. I didn’t have long to wait to find out.

I was working at the time for a medium-sized contractor, whose executive leadership indulged in a certain elitism that insulated them from any criticism from the lower-ranking members of the company, no matter how accurate or sincerely intended. This elitism was a source of frustration from the company’s workers, who largely felt that they were in a position to help the organization achieve its (stated) corporate goals, if they could only be heard. The first part of my professor’s axiom was in place – the executives’ arrogance represented a tamping-down effect on upward communications.

This company printed a little (around 8 pages) monthly newsletter, entitled the XYZ News (“XYZ” being the stand-ins for the company’s actual acronym). This newsletter represented the downward-trending communications, the bits of knowledge and information that these executives wanted the rest of the organization to know. It contained stories about project success, proposal wins, upcoming events, and some vignettes about the upper-level managers or owner. Access to information about project failures, proposal losses, stories about non-execs, or any other data item that might put the company in a bad light was banned from the official newsletter, and limited to rumor or hearsay.

Along about this time the knowledge transfer function dramatically broke free of the executives’ attempts at managing it. An underground newsletter sprang up that mimicked the official company’s newsletter, font, banner and all. The entries in the faux newsletter, however, did focus on those significant events going on in the organization that the executives did not want the rank-and-file to know, and the writing style threw in enough snark to amuse the workers and absolutely infuriate the leaders. Immediately an effort was launched to discover the producer of the imposter. People’s computers, hard drives, printers, and desks were searched, but the phantom publisher was never discovered.

Several issues of the fake newsletter were published prior to the time I left this company, and at least a couple were printed after my departure, or at least that’s what I heard from my friends and former co-workers. The company ended up being sold to a competitor within the year, at least in part due to the out-of-touch decisions being made by the executives.

What I found fascinating about the whole affair was the way that my professor’s assertion had come so dramatically true. The sense of superiority that these executives had indulged was largely detached from any true meritocracy, and was based instead on a pervasive cronyism. However, since these people were the bosses, it was really quite impossible to challenge any of their decisions, no matter how ill-advised.

It has been my experience that whenever the topic of knowledge transfer is broached, an automatic assumption is in place, that such transfers necessarily involve communicating the precious knowledge from the more august, learned, and, well, knowledgeable people – invariably highly-placed within the organization – to those in need of such knowledge, usually the lower-ranked ones. But, at least in this case, the necessary knowledge needed to go in the exact opposite direction, and did so, albeit not in a form those who needed it were willing to accept. They were only okay with sending “knowledge” down the hierarchy.

So, in this case, the knowledge transfer went down, when it needed to come up.

Posted on: March 08, 2015 10:50 PM | Permalink | Comments (0)

"You Are No God, Kirok!"

linkedin twitter facebook Request to reuse this  

In the classic Star Trek episode “The Paradise Syndrome,” Captain Kirk finds himself on a planet inhabited by people who practice the customs of North American native tribes but which, unfortunately, is about to be struck by a huge asteroid. An obelisk atop a structure (that clearly could not have been constructed by the natives) nearby is more than just an anomaly – it’s a device that an advanced civilization (“Preservers”) had put there untold years prior to deflect just such asteroids. However, the tribe’s medicine man, Salish, has no idea how to get inside the structure and invoke its protective capabilities. A stranded Kirk asks Miramanee, his love interest and future wife (a lot of people forget that, for much of the third season, James T. Kirk was actually a widower) how did it come about that Salish never received instruction on how to access the “temple,” and she replies that Salish’s father did not want to share the information too early, and died unexpectedly, leaving them in their current precarious situation.

Which brings us to ProjectManagement.com’s March theme, knowledge transfer and management. It’s axiomatic that information is the life-blood of any organization, particularly corporations and companies, and especially within project teams. It’s simply human nature to preserve that which makes a project team member valuable to the project team, and, in most instances, that’s some unique knowledge or capability. When everybody knows how to, say, operate Critical Path Methodology software effectively, then the price of CPM specialists drops precipitously. This is true of virtually any job that entails specialized knowledge, or advanced capability (which usually comes about because of specialized knowledge).

So, once again we have an instance of the best theoretical approach to a project management problem running smack-dab into legacy elements of human nature. The more heavy-handed amongst us will tend to demand policies that appear to combat such natural tendencies, while the more passive consultants will engage in (yet another) round of eat-your-peas-style hectoring, about how people ought to mentor, or engage stakeholders, or document their insights, blah blah blah.

My take, predictably enough, is a bit different. It’s based on the now-clichéd observations of how project teams become high-performers, specifically the Forming-Storming-Norming-Performing steps attributed to Bruce Tuckman in 1965. Newly-formed project teams that move into the Storming phase of this pattern can be expected to be comprised of individuals who are disinclined to do any knowledge sharing or transfer. Why? Because they don’t know where they fall within the team’s hierarchy. Offering up any insights that may be unique to them would make those insights suddenly un-unique, and the team member possessing them less valuable in a comparative sense. This reluctance is compounded if members of the team believe that others are competing with them for status within the group – the competitive sense within the group essentially destroys opportunities for cooperation, since the team’s members are attempting to establish their relative values to team leadership.

So, how does the project manager help reduce or eliminate inter-team rivalries, so as to shorten the Storming phase as much as possible? A few tactics are clearly indicated:

·         Prohibit ex parte discussions about team members. This is a common, but destructive tactic used by those attempting to curry favor with management at the expense of the other team members.

·         Make clear the precise ranking of each member of the project team, and how that ranking can be advanced. The answer to the second part of the previous sentence is always by helping the project team attain its objectives, and never about the individual moving up with respect to peers.

·         Finally, try to transfer the competitive instinct away from issues interior to the team, and on to the way things are unfolding exterior to the group, i.e. the team’s competitors.

I’ll discuss more advanced and nuanced methods in other March blogs. For now, though, if you find yourself on a planet inhabited by North American natives, about to be smashed by an asteroid, make sure Salish knows that slashing your hand open with a knife doesn’t help deflect the planet-crushing asteroid one little bit, and he needs to knock off the whole extending-the-Storming cycle gig.

Posted on: March 02, 2015 10:28 PM | Permalink | Comments (0)

Quality Overreach

linkedin twitter facebook Request to reuse this  

As February enters into its final week, so, too, does my blog enter into its last opportunity to gratuitously disagree with my other ProjectManagement.com columnists and bloggers about the whole quality management thing. But it’s this very realization,  that I’m coming up against a limit to my contrarianism (well, about this topic, anyway) that helps highlight my overall objection to the quality management guys: they don’t know when to quit!

Consider this definition of quality management from Investopedia:

The act of overseeing all activities and tasks needed to maintain a desired level of excellence.[i]

For those who are not themselves quality consultants and did not blanch upon reading the three-word term “overseeing all activities,” go back and read it again, please. The added “…needed to maintain a desired level of excellence” is somewhat perfunctory.  Seriously, what aspect of the management world isn’t part of “maintaining a desired level of excellence”? This definition of quality management, all by itself, has outed the quality aficionados as either (a) being unable or unwilling to state the epistemological limits of their discipline, or (b) really intending to take over the management science world.  In these two respects, the QC guys are eerily similar to one of my other favorite management science overreaching targets, the risk managers. Also like the risk managers, the QC guys rely heavily on statistical analysis to support their conclusions and recommendations. However, unlike the risk management-types, the quality gurus not only attempt to capture the impacts of their recommended changes, they often insist on it – which brings me to another disagreement I have with them. It’s really impossible to completely quantify the overall economic impact of altering the quality of a given product or service. Again as with the risk managers, there are simply too many factors to capture, much less evaluate.

But let’s return to the overreaching part. Suppose you, dear reader, hire me as a quality control consultant for, say, your yacht company. My first day there, I notice that the machine that your company is using to mold ship parts is set slightly below the recommended temperature for the type of plastic resin being supplied. I ask you about it, and you tell me that, due to the price of energy in California, your accountant (“Melvin”) performed an analysis that showed that a lowering of the molding furnaces by 10 degrees Fahrenheit would save $21,258.52 per month. However, a cursory reading of the supplier’s material data sheet indicates that, if the molding machine is not kept above the recommended temperatures, the resulting parts will experience a cohesion degradation of 24%, and that, when the $21,258.52 per month “savings” are spread out over the number of vessels being constructed, it ends up being a mere 1.2% savings per ship. Because I’m aware Melvin was opposed to your hiring a quality consultant in the first place, I’ll put the question to you this way: Are you sure you want to sacrifice hull integrity by 24% for the savings of 1.2% of the cost?

When you reply with the obvious answer, I continue: Why did you hire Melvin in the first place?” Surprised at my audacity, you politely invite me to confine my analysis to matters of quality. My response: the very definition of quality management is to oversee all activities needed to maintain a desired level of excellence, and your company’s ships have suffered from a significant drop in quality because somebody hired Melvin here. Clearly, your human resource activities fall within my purview. Also, I have some questions about how you raise your kids…

Okay, that last bit is clearly out of bounds. But that’s my point – so was the challenging of the decision to hire Melvin, even though, based on the definition quality management, the challenge was perfectly within the quality management consultant’s purview. Without a clearly articulable upper limit on which decisions may be challenged or overturned under the guise of what’s “needed to maintain a desired level of excellence,” overreach is virtually guaranteed.

It’s analogous to ProjectManagement.com bloggers telling their readers how to raise their kids.



[i] Retrieved from Investopedia, http://www.investopedia.com/terms/q/quality-management.asp, February 21, 2015, 13:25 MST.

Posted on: February 23, 2015 02:23 PM | Permalink | Comments (0)

Death By Quality

linkedin twitter facebook Request to reuse this  

There’s a story that at the onset of Operation Desert Shield, the United States’ and her allies’ effort to kick Saddam Hussein out of Kuwait, that the Pentagon had sent out a clue that something big was about to happen by inundating the nearby pizza delivery restaurants with so many orders that it was clear that the employees were going to be there through at least dinner time.

As I’ve discussed previously, project management information systems that deal with actual project performance – Earned Value and Critical Path methodologies-based, all others being fake – have two overarching functions: (1) to put into the hands of the project teams’ decision-makers the information they need to select the best strategies, and (2) to provide a narrative after-the-fact as to what happened, and why, as the project pursued its objectives. The first of these functions can be established relatively quickly and easily since (as I have also discussed before) both Earned Value and Critical Path can provide essential performance information without many of the formalities often associated with them, such as highly detailed cost estimates or intricately linked schedule baselines. The providing-the-narrative function, however, does need this level of formality and detail. But, like the Pentagon swamping local area pizza restaurants, there are going to be times that the prescient project manager does not want the particulars of her project’s narrative known to others, even if they do assert a claim to being a “stakeholder.”

The reasons for this are many. The particular project may have national security issues, or may involve the use of techniques or technologies that represent trade secrets. It may be as simple as the project team’s organization not wanting to share its insights on how to execute projects with its competitors. Whatever the reason, the very project management information systems that constitute the life-blood of informed decision-making can also be used against the owning organization and, in my humble opinion, this represents a quality issue.

So what we have with respect to assessing the quality of project management information systems are two essential, but potentially overlooked, components: the level of difficulty involved in establishing the information stream, and the potential for mis-use of that very information once it becomes available. In each instance, quality control plays a central role, and it’s not always positive. For example, the notion that a project’s cost baseline must be considered to be of poor quality if it does not take into account the most recent rates for labor, equipment, or any other line-item in the basis of estimate (BoE), is simply false. Perfectly usable and effective cost baselines can be (and are) created with budget estimates rather than detailed estimates, and those insisting that only detailed estimates will do are misguided. Depending on the project’s size and complexity, putting in the extra effort to create a detailed estimate (and it’s not cheap) will often lead to the attempt to derive other, irrelevant information from the cost baseline, such as the difference in price between the individual elements from the BoE and the same-time period actual costs. The fact that comparing budgets to actuals is useless is axiomatic among the better cost engineers, and this fact does not change simply because the comparison is occurring at a far more detailed level.

I’m sure many (if not most) of my readers have recognized a surge in the demand for schedulers who are adept at performing – not the creation and maintenance of Critical Path networks, but forensic analyses of projects that are either nearing completion or are complete, and some sort of claim/counterclaim is going on. This gets back to the narrative-building aspect of these information systems, and needlessly-detailed baselines are a gold mine to plaintiffs in these challenges. Any deviation from the original plan, no matter how innocent or appropriate, can be mis-interpreted as a quasi-breach of contract, essentially leading to the excusing of poor performance from subcontractors due to the collection and placement of irrelevant data in the project’s baselines.

But, hey! At least those who insist that quality baselines are synonymous with extremely detailed baselines are happy!

Posted on: February 16, 2015 02:59 PM | Permalink | Comments (1)