Project Management

Game Theory in Management

by
Modelling Business Decisions and their Consequences

About this Blog

RSS

Recent Posts

George Jetson, Bring Me A Rock!

How To Obstruct A PMO

Rage, Rage Against The Dying Of The Project

Think You Have A Culture Problem? Think Again.

Finally! A GAAP Concept PMs Can Get Behind!

Categories

Game Theory, PMO, Politics, Risk Management, Strategic Management

Date

Knowledge Transfer on the Down-Low

linkedin twitter facebook Request to reuse this  

Arthur Conan Doyle’s famous character Sherlock Holmes was known for being able to tease out vital information from people and events he encountered based on the slightest clue, the fastest of interactions. He knew within an instant of meeting Dr. Watson that Watson was an M.D., had served as an officer in the British Army, and had suffered a gunshot wound  (and in which theater), none of which Watson had verbalized.

Are there similar “tells” in the project management profession? I believe there are, but, much like Watson’s frustrations with Holmes’ fascination with and focusing on what would normally present as minutia, these indicators of sub-standard analysis or inadequate management science adherence may strike my readers as trivial, or unworthy of serving as the basis for usable conclusions. I would argue to the contrary, and will go further – if you, my dear readers, are doing any of the following, you might want to seriously consider stopping.

The first tell involves writing skills. From e-mails to variance analysis reports, real PMs will not escape having to, at some point, convey vital information through the written word. One dead giveaway of a writer’s cluelessness is the misspelling of the impersonal  possessive pronoun. Yes, it’s “its.”

When I’m teaching the variance analysis report prep class, I make it a point to take a moment, and write on the white board the word “theirs.” Then, I’ll call on one of the students, ask them to read the word, and ask if it’s misspelled. I do the same with “his,” “hers,” and “ours.” Then I’ll write the word “its.” By this time, everyone sees my point, and will even start to laugh that I’ve gone there.

“You laugh” I begin, “but I can guarantee you that, if I look through ten of your VARs, at least two of you have made this error.” The laughing dies down, and ceases. “Y’all have to understand – this stuff will get a seventh grader’s paper marked down. ‘It’s’ is a contraction, short for ‘it is.’ ‘Its’ is the impersonal possessive pronoun, and, when you mix them up, it betrays a lack of professional awareness or effort.”

The second tell I want to cover: the expression “the proof is in the pudding.” This is idiocy. The saying that is being alluded to is “the proof of the pudding is in the eating,”  One acceptable near-adaptation is, after discussing something that has proven its intrinsic value despite questionable methods to develop it, that the object being discussed is “the proof of the pudding.” But “the proof is in the pudding” is simply dopey. How did the proof get into the pudding? Did somebody put a Venn Diagram into the pudding as it set? And wouldn’t it be difficult to read afterwards? The mis-use of this cliché is a clear indicator that the person uttering it is not to be trusted with anything resembling advanced information analysis.

The third tell has to do with a management information technique that is common among the asset managers, but is a clear sign that PMs who do it are neophytes. It’s the tactic of comparing budgets to actual costs. This comparison yields usable information the same way a broken clock is correct twice per day – on a purely coincidental basis. In fact, the only time it’s supposed to be used in the accountant’s version of quantitative business analysis is in the calculation of depreciation. Other than that, it’s a useless number. As any real PM can tell you, a cost variance is not budget compared to actuals. It’s earned value (percent complete times budget-at-completion) minus actual costs. And performing the budget versus actuals comparison at more and more detailed levels of the basis of estimate and line items within the actuals accomplishes exactly nothing, even though it does present as being a more sophisticated analysis. It’s profoundly flawed, at any level, and its practitioners are the very opposite of prescient.

Should you come across a self-described expert in the management sciences in general, and project management in particular, who commits one of these tells, don’t react overtly, lest you commit a tell yourself. Instead, simply smile, appear as if you value the “analysis” given – and then completely disregard it, and you will have saved yourself (and your organization) significant time and money.

And don't bother to scrutinize this blog for correct usages of "its" and "it's." I did that five times already.

Posted on: March 30, 2015 08:36 PM | Permalink | Comments (0)

Stop Transferring Knowledge!

linkedin twitter facebook Request to reuse this  

In 1962, Thomas Kuhn wrote The Structure of Scientific Revolutions, a truly insightful book on science philosophy, and the source of the term “paradigm shift.” Kuhn theorized that, while scientific advances appear to assume a steady upward trajectory, the truth is that science advances in fits and starts, and tends to assume a certain pattern that reflects somewhat poorly on human nature.

This pattern roughly follows the following steps:

·         New data is discovered that challenges the currently-accepted theory.

·         Cycles and epicycles – essentially, addendum – are added to the current theory in an attempt to accommodate the new, challenging data.

·         Someone comes up with a new theory, which tends to explain the new data better than the old theory.

·         This someone is subjected to criticism, often very aggressive (if not out-and-out abusive).

·         As more and more data is made available, the newer theory begins to attract advocates, and defenders of the old theory become less vocal, or switch sides altogether.

·         Once a preponderance of self-proclaimed experts has accepted the new theory, the notorious paradigm shift has occurred, and the new theory becomes the most widely-accepted one – until new discoveries uncover facts that challenge it, and the cycle begins again.

Of course, Kuhn was writing about the hard sciences – his primary examples included cosmology – but I believe that his insights have bearing in the world of the management sciences. Yes, I know that real scientists scoff or cringe at the term “management science,” and they probably have good reason to do so. After all, when one of them comes up with a theory, say, of the best solvent to extract aminobenzoate, she can verify and repeat her theory’s application in an experimental setting. While project management aficionados can point to one project disaster after another when leaders eschew basic PM techniques, such as the creation of scope, cost, and schedule baselines, there are far too many other factors in play. The necessary conditions to test for just baseline utilization are far too difficult to isolate in our laboratory, since our laboratory is the world of business, which is to say the free enterprise marketplace. And, just to make the experimental verification of management science theories even more difficult, elements of topics ranging from organizational behavior and performance to management information system architecture come in to play, resulting in a hopelessly complex, if not out-and-out chaotic, experimental environment.

So, what happens when someone has an idea, a hypothesis that they genuinely believe is a useful managerial insight, but runs counter to existing, widely-accepted practice?  Well, academics and real scientists publish their ideas in peer-reviewed journals, hoping to persuade their colleagues to at least evaluate the efficacy of the new theory, while documenting the experimental data that supports the new idea. So-called management scientists tend to be either primarily managers themselves, or business owners (academics belong to a separate category). These peoples’ insights are usually the only thing that keeps their organizations competitive, because, if they do have a genuinely paradigm-shifting insight on how to manage much more effectively or efficiently, they actually have a disincentive to have that idea widely-disseminated. It’s far better for them to try out their idea in the business world, to see if it attracts profits or accomplishes scope objectives at a greater rate than the others’ ideas on how a company or project ought to be run. If it works, they will stick with it. If it doesn’t, they will abandon it. In either instance, shouting the idea from the published management sciences rooftops is contra-indicated (to borrow a real scientific term).

In fact, if a large project were to be concluded successfully while indulging some management pathologies, its principals would be rewarded if they could make the case that that success was because of those suspect tactics. Kind of makes me wonder about those who are eager to “transfer” their “knowledge.”

Ultimately, as a project management practitioner, if you are privy to truly usable knowledge, knowledge that makes your organization or project team better, you might want to think twice before you transfer it, and to whom.

Posted on: March 22, 2015 11:06 PM | Permalink | Comments (1)

Drilling Through Granite, Part 2

linkedin twitter facebook Request to reuse this  

In evaluating the whole concept of knowledge transfer, it’s sometimes easy to become frustrated with the amount of energy devoted to analyzing the topic. I mean, seriously, isn’t “knowledge transfer” what happens when people engage in conversation? How hard can it be? Well, recall the classic scene from Monty Python and the Holy Grail, where Michael Palin’s King character is trying to tell two guards to “Stay here and make sure he (meaning the prince standing four feet away) doesn’t leave.”? The guards, who appear otherwise normal, can’t understand the simple command and, in the movie at least, hilarity ensues. It can be that tough.

So, in the analysis phase communications experts will usually invoke some truisms, such as it’s the responsibility of the communicator to make the message clear to the receivers, and not the responsibility of the receivers to take in the transmitter’s intended true meaning. Generally speaking, that’s true, but the exceptions to the rule(s) are the dangerous elements here.

For example, back when I was writing the Variance Threshold column for PMNetwork magazine, I had an incident where a fellow wrote to my e-mail address taking me to task for a piece I had written on critical path scheduling, where I discussed variables to consider when deciding how to handle schedule float. This person wrote in a rather condescending tone, challenging my analysis on schedule float based on his assertion that float did not exist. I swear I am not making this up. At first I assumed that nobody who described themselves as a “senior scheduler,” as this person did, could be that ignorant, and therefore took his meaning as being akin to some of Eliyahu Goldratt’s work in the novel The Critical Chain.  In this – again – novel, the project manager protagonist transfers personnel from non-critical path activities to critical ones, thereby shortening the project’s overall duration. Of course, since the idea was being presented in a fictional venue, the tactic succeeded fantastically, the protagonists lived happily ever after, no character ever steps up and says “Hey! Isn’t that tactic identical to the old ‘crashing—the – schedule’ trick?”, and the body of project management theory had been altered (and not necessarily for the better).

Graciously assuming my provocateur was referring to this bit of shoddy management science, I responded with the reasons I thought “critical chain” was not valid. The e-mail writer wrote again, stating flatly that that wasn’t what he was talking about. Rather, he clarified that schedule float did not exist because (I’m paraphrasing), when a manager told a project team member to do something, well, then, by golly, that thing had to be done then. Clearly, this fellow was resistant to knowledge transfer, at least when it came to CPM or came from me. I was tempted to respond with something along the lines of “Stay here, and make sure he doesn’t leave,” but thought the better of it. I’ve had similar e-mail interactions with those who took exception to my criticizing risk management techniques, some of which were positively hysterical.

I think the common thread here is that, once a person creates an emotional attachment to something otherwise as innocuous as a project management theory, hypothesis, idea, technique or tactic, that facts and insight – knowledge – suddenly have a much harder time of being transferred into that person’s thinking. This may be due to (ironically enough) a derivative of the sunk-costs argument, where, say, a professional risk analyst assigned to a non-pharmaceutical project looks back on those semesters of statistics classes suffered through (strikethrough) taken and passed, and can’t understand why the Earned Value and Critical Path information streams are so much more valuable than his Monte Carlo simulations. Frustration sets in, and the next thing you know mildly unhinged missives start showing up in some columnist’s in-box.

In any event, evaluations of knowledge transfer are usually predicated on the notion that there exists persons willing and able to receive the knowledge, once proffered. I’m not sure that’s always the case.

Posted on: March 15, 2015 08:52 PM | Permalink | Comments (1)

What Goes Down Must Come Up

linkedin twitter facebook Request to reuse this  

One of my business school professors – I can’t recall if it was in Organizational Behavior and Performance, or Information Technology – once offered up an axiom, that knowledge and information transfer was a two-way street, and if attempts to squelch it were made, then such communications would manifest in unexpected ways. I accepted his assertion on its face, without really understanding what the implications were. I didn’t have long to wait to find out.

I was working at the time for a medium-sized contractor, whose executive leadership indulged in a certain elitism that insulated them from any criticism from the lower-ranking members of the company, no matter how accurate or sincerely intended. This elitism was a source of frustration from the company’s workers, who largely felt that they were in a position to help the organization achieve its (stated) corporate goals, if they could only be heard. The first part of my professor’s axiom was in place – the executives’ arrogance represented a tamping-down effect on upward communications.

This company printed a little (around 8 pages) monthly newsletter, entitled the XYZ News (“XYZ” being the stand-ins for the company’s actual acronym). This newsletter represented the downward-trending communications, the bits of knowledge and information that these executives wanted the rest of the organization to know. It contained stories about project success, proposal wins, upcoming events, and some vignettes about the upper-level managers or owner. Access to information about project failures, proposal losses, stories about non-execs, or any other data item that might put the company in a bad light was banned from the official newsletter, and limited to rumor or hearsay.

Along about this time the knowledge transfer function dramatically broke free of the executives’ attempts at managing it. An underground newsletter sprang up that mimicked the official company’s newsletter, font, banner and all. The entries in the faux newsletter, however, did focus on those significant events going on in the organization that the executives did not want the rank-and-file to know, and the writing style threw in enough snark to amuse the workers and absolutely infuriate the leaders. Immediately an effort was launched to discover the producer of the imposter. People’s computers, hard drives, printers, and desks were searched, but the phantom publisher was never discovered.

Several issues of the fake newsletter were published prior to the time I left this company, and at least a couple were printed after my departure, or at least that’s what I heard from my friends and former co-workers. The company ended up being sold to a competitor within the year, at least in part due to the out-of-touch decisions being made by the executives.

What I found fascinating about the whole affair was the way that my professor’s assertion had come so dramatically true. The sense of superiority that these executives had indulged was largely detached from any true meritocracy, and was based instead on a pervasive cronyism. However, since these people were the bosses, it was really quite impossible to challenge any of their decisions, no matter how ill-advised.

It has been my experience that whenever the topic of knowledge transfer is broached, an automatic assumption is in place, that such transfers necessarily involve communicating the precious knowledge from the more august, learned, and, well, knowledgeable people – invariably highly-placed within the organization – to those in need of such knowledge, usually the lower-ranked ones. But, at least in this case, the necessary knowledge needed to go in the exact opposite direction, and did so, albeit not in a form those who needed it were willing to accept. They were only okay with sending “knowledge” down the hierarchy.

So, in this case, the knowledge transfer went down, when it needed to come up.

Posted on: March 08, 2015 10:50 PM | Permalink | Comments (0)

"You Are No God, Kirok!"

linkedin twitter facebook Request to reuse this  

In the classic Star Trek episode “The Paradise Syndrome,” Captain Kirk finds himself on a planet inhabited by people who practice the customs of North American native tribes but which, unfortunately, is about to be struck by a huge asteroid. An obelisk atop a structure (that clearly could not have been constructed by the natives) nearby is more than just an anomaly – it’s a device that an advanced civilization (“Preservers”) had put there untold years prior to deflect just such asteroids. However, the tribe’s medicine man, Salish, has no idea how to get inside the structure and invoke its protective capabilities. A stranded Kirk asks Miramanee, his love interest and future wife (a lot of people forget that, for much of the third season, James T. Kirk was actually a widower) how did it come about that Salish never received instruction on how to access the “temple,” and she replies that Salish’s father did not want to share the information too early, and died unexpectedly, leaving them in their current precarious situation.

Which brings us to ProjectManagement.com’s March theme, knowledge transfer and management. It’s axiomatic that information is the life-blood of any organization, particularly corporations and companies, and especially within project teams. It’s simply human nature to preserve that which makes a project team member valuable to the project team, and, in most instances, that’s some unique knowledge or capability. When everybody knows how to, say, operate Critical Path Methodology software effectively, then the price of CPM specialists drops precipitously. This is true of virtually any job that entails specialized knowledge, or advanced capability (which usually comes about because of specialized knowledge).

So, once again we have an instance of the best theoretical approach to a project management problem running smack-dab into legacy elements of human nature. The more heavy-handed amongst us will tend to demand policies that appear to combat such natural tendencies, while the more passive consultants will engage in (yet another) round of eat-your-peas-style hectoring, about how people ought to mentor, or engage stakeholders, or document their insights, blah blah blah.

My take, predictably enough, is a bit different. It’s based on the now-clichéd observations of how project teams become high-performers, specifically the Forming-Storming-Norming-Performing steps attributed to Bruce Tuckman in 1965. Newly-formed project teams that move into the Storming phase of this pattern can be expected to be comprised of individuals who are disinclined to do any knowledge sharing or transfer. Why? Because they don’t know where they fall within the team’s hierarchy. Offering up any insights that may be unique to them would make those insights suddenly un-unique, and the team member possessing them less valuable in a comparative sense. This reluctance is compounded if members of the team believe that others are competing with them for status within the group – the competitive sense within the group essentially destroys opportunities for cooperation, since the team’s members are attempting to establish their relative values to team leadership.

So, how does the project manager help reduce or eliminate inter-team rivalries, so as to shorten the Storming phase as much as possible? A few tactics are clearly indicated:

·         Prohibit ex parte discussions about team members. This is a common, but destructive tactic used by those attempting to curry favor with management at the expense of the other team members.

·         Make clear the precise ranking of each member of the project team, and how that ranking can be advanced. The answer to the second part of the previous sentence is always by helping the project team attain its objectives, and never about the individual moving up with respect to peers.

·         Finally, try to transfer the competitive instinct away from issues interior to the team, and on to the way things are unfolding exterior to the group, i.e. the team’s competitors.

I’ll discuss more advanced and nuanced methods in other March blogs. For now, though, if you find yourself on a planet inhabited by North American natives, about to be smashed by an asteroid, make sure Salish knows that slashing your hand open with a knife doesn’t help deflect the planet-crushing asteroid one little bit, and he needs to knock off the whole extending-the-Storming cycle gig.

Posted on: March 02, 2015 10:28 PM | Permalink | Comments (0)