Project Management
Task                                              010                                                - Assess Existing Technical Architecture010 Assess Existing Technical Architecture Task                                              030                                                - Determine Availability Requirements030 Determine Availability Requirements

Task 020 - Determine Performance Requirements

Role Apportionment Weights
Inputs
Outputs
Roles
Techniques
Templates for this Process
Templates for this Stage
Index
ADVERTISEMENT
linkedin twitter facebook Request to reuse this  

Description

Assess and document the Data Warehouse performance requirements. This document should specify acceptable load times, backup times, query response times, and all relevant performance issues. Preliminary requirements for technical performance may have been determined during BQA focus sessions conduc...

Please login/register as a Premium Plus member to continue reading. You must be a Premium Plus member to access this content.


Role Apportionment Weights


Inputs


Outputs


Roles


Techniques


Predecessors

DWH.DAR.0400.010 Task - Assess Existing Technical Architecture - Dependency: Finish - Start

ADVERTISEMENTS

"What is wanted is not the will to believe, but the wish to find out, which is the exact opposite."

- Bertrand Russell

ADVERTISEMENT

Sponsors