Project Management

Please login or join to subscribe to this thread

RBS (resource Break down Structure

linkedin twitter facebook   Estimating  
avatar
MANSOUR THABET ALQUBATY System Controller| Teleyemen Sana'A, N/A, Yemen
According to PMBOK 6th Ed.

RBS is one of the tool of (Data Representation) of (9.1 -Plan Resource Management process) and also in the same time it is an output of (9.2 Estimate Activity Resources process).

1) Is this case breaking down the ITTO?
2) How can I use something for a tool and get as an output?

BR,
avatar
Sergio Luis Conte Helping to create solutions for everyone| Worldwide based Organizations Buenos Aires, Argentina
RBS is something that mifght be exist at organizational level. From that structure which contains all type of resources at organizational level the project RBS is created. That is because it is a tool and an output.

Please login or join to reply

Content ID:
ADVERTISEMENTS

A mind once stretched by a new idea never regains its original dimensions.

- Anonymous

ADVERTISEMENT

Sponsors