What is your % on Floor and % in office?

linkedin twitter facebook  
avatar
Riyadh Salih Saskatchewan, Canada
If you are a project manager on site or doing upgrade project on a facility what is your percentage spent on floor and the percentage spend inside the office?

I have turn down one offer from a company because they wanted me to spend 80% on floor their facility is very hot and noise level exceed 120 decibel.
Sort By:
< 1 2 >
avatar
Riyadh Salih Saskatchewan, Canada
I have turn down one offer from a company because they wanted me to spend 80% on floor their facility is very hot and noise level exceed 120 decibel.
avatar
Sante Delle-Vergini, PhD Senior Project Manager| Infosys Melbourne, Victoria, Australia
I think the split depends on the type of project we manage, and sometimes there are multiple projects. Lucky you didn't take that job Riyadh.
avatar
Riyadh Salih Saskatchewan, Canada
Sante, thanks I guess yeah that would be a disaster but it shouldn't be specified it should be at the discretion of the PM to evaluate how much time he needs to do rounds
avatar
Drew Craig Sr. Agile & Product Coach| Vanguard Philadelphia, Pa, United States
Client dependent and on the budget for travel expenses vs the reward of an on-site presence.

We have clients that prefer 100% on-site vs those that are simply as needed.
avatar
Riyadh Salih Saskatchewan, Canada
Andrew, yes absolutely you are right some times it's 100% on site to verify constructions
Thanks for your feed back
...
1 reply by Drew Craig
Jul 08, 2018 1:53 PM
Drew Craig
...
Not just construction, right? Software, too.
avatar
RAJESH K L Project Manager, PMP| Bharat Electronics, Bengaluru, India Bengaluru, Karnataka, India
Probably depends on the kind of project. Clients usually prefer 100% on site, but practically its not feasible.
...
1 reply by Riyadh Salih
Jul 09, 2018 12:21 AM
Riyadh Salih
...
Rajesh, yes but 100% is too much you still need to do some administrative work and reply emails and generate reports etc
avatar
Drew Craig Sr. Agile & Product Coach| Vanguard Philadelphia, Pa, United States
Jul 08, 2018 11:31 AM
Replying to Riyadh Salih
...
Andrew, yes absolutely you are right some times it's 100% on site to verify constructions
Thanks for your feed back
Not just construction, right? Software, too.
...
1 reply by Riyadh Salih
Jul 09, 2018 12:19 AM
Riyadh Salih
...
Yes Andrew, I guess software too for testing and connection of hardware, fibre optic cables and other equipment
avatar
Riyadh Salih Saskatchewan, Canada
Jul 08, 2018 1:53 PM
Replying to Drew Craig
...
Not just construction, right? Software, too.
Yes Andrew, I guess software too for testing and connection of hardware, fibre optic cables and other equipment
avatar
Riyadh Salih Saskatchewan, Canada
Jul 08, 2018 1:39 PM
Replying to RAJESH K L
...
Probably depends on the kind of project. Clients usually prefer 100% on site, but practically its not feasible.
Rajesh, yes but 100% is too much you still need to do some administrative work and reply emails and generate reports etc
avatar
Kavitha Gunasekaran Project Manager| Aerospace & Defence Organisation Chennai, Tamil Nadu, India
Every project demands some amount of floor time and the need rises from the client most of the time than management, though expectation touches 100%, it is practically not feasible as we maybe linked to multiple projects that need our attention.
...
1 reply by Riyadh Salih
Jul 09, 2018 1:03 PM
Riyadh Salih
...
Kavita, thanks for your comment, it is not possible to be 100% on floor you are right.