Project Management

Please login or join to subscribe to this thread

Difference Between Audit & Inspection

linkedin twitter facebook  
avatar
Abhishek Kumar Project Manager| HCL Technologies Noida, Uttar Pradesh, India
Confused about Audit & Inspection processes in Project Management
Sort By:
avatar
RAJESH K L Project Manager, PMP| Bharat Electronics, Bengaluru, India Bengaluru, Karnataka, India
Audit is performed by third party to verify/check process is followed as per documentation.
Inspection is performed as part of operations to ascertain work products satisfy predefined criteria
avatar
Tamer Zeyad Sadiq Assistant Cost Manager| Turner & Townsend Riyadh, Ar Riyad, Saudi Arabia
The audit is tool for quantity assurance to ensure the deliverable, which is come from control quality as measurements, is as policy and procedures while inspection is examine the deliverable is meet requirements or not to recommend change request if required.

All information is available in PMBOK for Quality management.

Tamer
avatar
SAMUEL ODJELUA Msc, PMP, PMI-RMP, PMD Pro 1&2| THE LANDS COMMISSION, ACCRA - GHANA Accra, Spintex, Ghana
Audit is quality check technique.Whether the deliverable conforms to predetermined quality standards and policy after the product is delivered.
Inspection is done to avoid rework. It is carried out as part of the operations process.
Please refer to the PMBOK for more detailed clarification.
avatar
Ruth Marina Lopez Perez Responsable TI| INSTITUTO DE PREVISION SOCIAL MILITAR - NICARAGUA Masaya, Los Madrigales, Nindirí, Nicaragua
The audit is a technique for better process and correcting and prevention of practices bad Is use in management of quality and control of adquisitions.
The inspection is a technique for verify if deliveries acomplished with of requirements of products, results or services.

La auditoría es una técnica para un mejor proceso y corrección y prevención de prácticas malas. Se utiliza en la gestión de la calidad y el control de las adquisiciones.
La inspección es una técnica para verificar si los entregables se realizan con los requisitos de productos, resultados o servicios.

Please login or join to reply

Content ID:
ADVERTISEMENTS

"If you want to please only the critics, don't play too loud, too soft, too fast or too slow."

- Arturo Toscanini

ADVERTISEMENT

Sponsors