Project Management

Please login or join to subscribe to this thread

Statement of Work

linkedin twitter facebook   Work Breakdown Structures (WBS)  
avatar
SHADAV MOHAMMAD ANSARI PMO| ITC INFOTECH INDIA PVT. Ltd. New Delhi, Delhi, India
How Detailed Should A Statement Of Work Be?
What is difference between MSA and SoW?
Sort By:
< 1 2 >
avatar
Keith Novak Tukwila, Wa, United States
Mar 05, 2019 12:40 PM
Replying to Steve Ratkaj
...
Interesting. In our line of work (defence procurement), a SOW is very detailed as it must describe "ALL" work to be done, including technical/ performance requirements, and validation/ acceptance criteria. SOWs here can easily be several 100's of pages. For example, I'm just finishing a partial WBS for contract deliverables on a "small" CAN$400M contract that contains over 2000 WBS elements.
It's interesting that you have that much detail. We also have extensive SOW as a supplier to defense contracts, but they would typically call out a specification control drawing change, or perhaps a new/revised requirement rather than include the detailed requirements. Similarly we would call out defining test plans, supporting tests, etc. and but not the actual criteria.

That's one of the challenges I see in the future with digital transformation efforts, is that when exchanging data between parties, it can be organized very differently even in similar industries.
< 1 2 >

Please login or join to reply

Content ID:
ADVERTISEMENTS

"I've had a perfectly wonderful evening. But this wasn't it."

- Groucho Marx

ADVERTISEMENT

Sponsors