Rolling Wave Duration?

linkedin twitter facebook   Estimating   Work Breakdown Structures (WBS)  
avatar
David Maynard Fort Wayne, In, United States
In at least two (probably more) the guide (version 6) talks about how the Project Manager and team should understand and analyze the duration of the rolling wave in effect for planning purposes (6.1)

I understand the concept of rolling wave planning, but how is the DURATION of the wave analyzed? Is there a mathematical technique that one can use to establish what the rolling wave SHOULD be for a project? That's pretty strongly hinted at by the PMBOK guide in chapter 6.
Sort By:
< 1 2 >
avatar
Abolfazl Yousefi Darestani Manager, Quality and Continuous Improvement| Hörmann-TNR Industrial Doors Newmarket, Ontario, Canada
As far as I know, there is not any mathematical formula for this.
< 1 2 >

Please login or join to reply

Content ID:
ADVERTISEMENTS

Whenever you are asked if you can do a job, tell 'em, "Certainly, I can!" Then get busy and find out how to do it.

- Theodore Roosevelt

ADVERTISEMENT

Sponsors