How does the contractor in construction project evaluates the claims for extension of time ?

linkedin twitter facebook  
avatar
Ahmed Mohamed Alzarooni Principles Civil Maintenance Engineer | Dubai Municipality Sharjah, Sharjah, United Arab Emirates
For certain project a general contractor claimed for extension of time based on the evaluation made by a primevera program yet he considered only delay from client and consultant while the slipped items due to his delay is not recorded in the program is his statement is true ?
Sort By:
avatar
Alfred Horton CEO & President| AOC Connect, LLC Lovettsville, Va, United States
The only items that I would permit to be included in a change order for schedule creep would be items that impact the critical path of the project. If there was schedule creep on 10 items, but only one impacted the critical path, then that item is the cause for the delay, and that vendor should be held responsible from a cost perspective.
avatar
RAJESH K L Project Manager, PMP| Bharat Electronics, Bengaluru, India Bengaluru, Karnataka, India
Agree with Alfred

Please login or join to reply

Content ID:
ADVERTISEMENTS

Information is not knowledge,
Knowledge is not wisdom,
Wisdom is not truth,
Truth is not beauty,
Beauty is not love,
Love is not music
and Music is THE BEST

- Frank Zappa

ADVERTISEMENT

Sponsors