WBS Construction for Project with multiple sub-projects

linkedin twitter facebook  
avatar
MD Sarfaraj Alam Advisor, Sales Operations| Dell Technologies India
Hi Team

Hope everyone is safe and well.

I am looking to find a reference article for construction of WBS for a mega project which has multiple sub-projects. Is there a good article that explains the creation of WBS in detail for such cases? Preferably with explanation of what levels of WBS would be managed by sub-project managers and what level of details would be captured in the main WBS?

Thanks
Alam (Raj)
Sort By:
avatar
Tarun Nair Adoor, Kerala, India
It would be good to elaborate a bit more. In general all project and subproject has to follow the scope of work and simple definition of wbs
avatar
Thomas Walenta Global Project Economy Expert Hackenheim, Germany
You can look into the practice standard for WBS, free download for members.
It includes examples of WBS containing a set of projects.

Personally, I think the main purpose of a WBS is to communicate the scope to a stakeholder group. Any WBS should fit on one page and have max 8 horizontal elements and be max 6 levels deep.

If you need more detail, create further WBS for work packages in the major WBS.
avatar
Tejas Sura Managing Director| Cubic Turnkey Private Limited Mumbai, Maharashtra, India
I would suggest to work out a WBS of sub-projects to at least 4-5 levels.

The same can be imported into the master WBS and rolled up to get a high-level summary WBS.