Project Management

Please login or join to subscribe to this thread

What are the calculation methods for the probability of risk and the minimum cost of load?

linkedin twitter facebook   Estimating   Risk Management   Utility  
I'm not sure about this, so I'll consult with all the experts
 
Sort By:
avatar
Sergio Luis Conte Helping to create solutions for everyone| Worldwide based Organizations Buenos Aires, Argentina
Take a look to: Managing Risk: Methods for Software Development a book from Elliane M. Hall.
avatar
Keith Novak Tukwila, Wa, United States
Xia,
Statistical methods for calculating probability are not necessarily very difficult for those with an aptitude for math, but they are difficult to explain in few words. Often however, calculation of the probability is not necessary. Ranking risks as high, medium, and low is often enough unless the outcome of the risk is severe. When it comes to quantifying uncertainties, a precision doesn't change the plan for addressing them much.
Keith

Please login or join to reply

Content ID:
ADVERTISEMENTS

"It is better to deserve honors and not have them than to have them and not to deserve them."

- Mark Twain

ADVERTISEMENT

Sponsors