Project Management

Please login or join to subscribe to this thread

Is the Work Breakdown Structure (WBS) still relevant in outcome-focused, agile-driven projects?

linkedin twitter facebook  
avatar
Lissette Indhira Pimentel Sosa
Community Champion
Program Manager| HARPER SRL Santo Domingo / Distrito Nacional, Dominican Republic

 WBS has been the backbone of project planning for decades. But in agile, where outcomes matter more than task hierarchies, some see it as outdated. Does WBS still have a role, or is it time to retire it?

Sort By:
avatar
Kiron Bondale Retired | Mentor| Retired Welland, Ontario, Canada
Lissette -

A WBS supports both predictive and adaptive approaches and if you think of an agile practice such as story mapping, it is effectively a work-oriented decomposition. A WBS can be a useful way for a team to take a set of epics and roll them up to the product as a whole to ensure nothing major is missed.

Kiron
avatar
Keith Novak Tukwila, Wa, United States
There are multiple different ways to use a WBS, and multiple different approaches to managing projects with a focus on business agility.

Agile may be practiced in manufacturing such as continuous improvement, and a WBS may be very helpful in organizing inputs throughout the supply chain. Can your Finance dept. simply allocate a large sum of money to a project, or must it be organized by color of money and job functions? A WBS may be necessary to parse the work into cost buckets.

There are some fundamental differences in how a WBS may be organized. The original way from the 1950's was organized based on a logical breakdown of a physical product structure. The work might be organized into a narrative statement of work sometimes called an IWS for itemized statement or work. That would start with detail parts that tree-up to sub-assemblies, assemblies, installations, and products. Another version that fits a sprint type scenario is an Integrated Statement of Work, where rather then organized by the product structure heirarchy, work from different organizations may be included together such as design, manufacturing, test, and product support all based on their relationship to a product.

How you logically organize work may be governed by business requirements, or it may only be limited by your own imagination as to the best way to manage the project.

Please login or join to reply

Content ID:
ADVERTISEMENTS

"If you are patient in a moment of anger, you will escape a hundred days of sorrow."

- Chinese Proverb

ADVERTISEMENT

Sponsors