The correct answer to the above is 37 days, can you help me to arrive at that answer
Sort By:
avatar
Sabedin Meha System Design Engineer| DataProgNet Ferizaj, Kosove, Albania
Hi Aejaz,

Check the diagram attached.

And yes the answer is 37 days.
avatar
Sabedin Meha System Design Engineer| DataProgNet Ferizaj, Kosove, Albania
Better screenshot attached
avatar
Aejaz Shaikh PM I| Alyx Technologies India Pvt Ltd Pune, Maharshatra, India
Sabedin Meha thanks for explaining the answer with a simple illustration