Root Cause Analysis, Delay Assessment & Contractual Exposure

linkedin twitter facebook  
avatar
Assi Ahmed Raza Project Lead| Rmes india pvt ltd India

This prompt is based on the CREATE formula + Chain of Thoughts. It is based on one of my active and current project. The prompt is designed to identify the Root Cause of the delay, Assessment on Exposure risk to LD applicable in the project.

Act as a PMP-certified senior project manager with 15+ years of EPC and industrial project experience in GCC countries specializing in GIS-based substation and online condition monitoring projects.

- Project Type: GIS-based Substation Online Condition Monitoring
- Project Value: USD 1.1 Million
- Contract Duration: 14 weeks after drawing approval
- Current Delay: 4 weeks
- Schedule Slippage: 47%
- LD Clause: 0.2% per week capped at 10%
- Client escalation ongoing and warning letter anticipated
- Engineering completion approximately 40%
- Manufacturing has not yet started
- Drawing approval status remains partially conditional
- Client issued MFC based on MAS document approved by end user
- IFC engineering maturity remains incomplete

Major Delay Drivers

- Design-team understaffing
- Rework activities
- Vendor data delays
- Interface clarification delays
- Absence of dedicated engineering lead
- Excessive dependency on PM for engineering coordination
- Multiple concurrent projects affecting resource availability

Critical Path Activities:

- Engineering deliverables
- Material procurement
- Panel manufacturing
- FAT activities


Perform a comprehensive root cause analysis and contractual impact assessment to:

- justify project delays,
- defend PM performance,
- identify organizational and engineering constraints,
- support future EOT discussions,
- and reduce LD exposure.

- Use realistic EPC project assumptions where required
- Maintain executive-management-oriented language
- Clearly distinguish confirmed facts vs assumptions
- Avoid generic recommendations
- Focus on engineering governance and critical-path impact
- Analyze both operational and contractual implications

Provide output in the following sections:

Section 1 — Executive Delay Summary

Section 2 — Root Cause Analysis Table
Columns:

- Issue
- Detailed Root Cause
- Critical Path Impact
- Schedule Impact
- Organizational Impact
- Contractual Risk
- Recommended Corrective Action

Section 3 — Delay Responsibility Assessment
Identify:

- Internal organizational factors
- Engineering governance failures
- Client-related dependencies
- Shared responsibility areas

Section 4 — Contractual & LD Exposure Analysis
Include:

- LD exposure assessment
- EOT justification considerations
- Risks associated with incomplete IFC maturity
- Impact of delayed engineering finalization
- Commercial implications of delayed manufacturing

Section 5 - Executive Observations
Include:

- PM workload concerns
- Resource governance gaps
- Engineering leadership concerns
- Immediate executive intervention areas
Show more Copy Try prompt on PMI Infinity

Please login or join to reply

Content ID:
ADVERTISEMENTS

"I never resist temptation, because I have found that things that are bad for me do not tempt me."

- George Bernard Shaw

ADVERTISEMENT

Sponsors