A project manager has created a document and wants to track the changes made in the document. The project manager should create _______.

linkedin twitter facebook  
avatar
Mahammad Ibrahim Scheduling Engineer | Samsung Engineering Gudivada, Andhra Pradesh, India
a) Configuration management system

b) Project Management Information system

c) Project management system

d) Control management system
Sort By:
< 1 2 >
avatar
Rami Kaibni
Community Champion
Senior Projects Manager | Field & Marten Associates New Westminster, British Columbia, Canada
You have to have Change Control System or Plan !
avatar
Avinash Bajaj Assistant Manager| Mahanagar Gas Limited Mumbai, Maharashtra, India
Its Configuration Management System
avatar
Abiodun Adetoro Winnipeg, Manitoba, Canada
You should create a Configuration Management System
avatar
Mahammad Ibrahim Scheduling Engineer | Samsung Engineering Gudivada, Andhra Pradesh, India
@Rami, Does Change Control system or Plan means configuration management system?
...
1 reply by Rami Kaibni
May 09, 2016 3:20 PM
Rami Kaibni
...
I did not really hear about Control Management Plan, there is Change Control Management Plan.
avatar
saurabh mahajan PMP, ITIL, PRINCE2| vodafone Pune, Maharashtra, India
Configuration management system

CMS helps in version control and thus you can always have sight of the latest baseline you have created. plus you can compare the latest and old version of the configuration items (document in your case) to see the change made in the document
avatar
Mahammad Ibrahim Scheduling Engineer | Samsung Engineering Gudivada, Andhra Pradesh, India
Surprisingly, Configuration management system is not the answer.
avatar
STEVE BOEDECKER Unemployed Project Manager| FutureVision Productions Vernon, Nj, United States
Control. You need to control the changes and track them. Config management would be to review the PROCEDURES for updates, etc.
...
1 reply by Mahammad Ibrahim
May 09, 2016 10:33 PM
Mahammad Ibrahim
...
@Steve, Its interesting that you said Control. and later Config management. We would like to see your opinion. You have something to say.
avatar
Samuel Vaddi Avon, In, United States
I also feel that Configuration Management System is the closest match for an answer. Obviously, Mahammad says it is incorrect. I cannot wait for him to let us know what the correct answer is and why :-)
avatar
STEVE BOEDECKER Unemployed Project Manager| FutureVision Productions Vernon, Nj, United States
Read Pembok pg. 532 in definitions of Config Management System.
avatar
Anonymous
Sorry for the wait@Samuel, Answer is Control management system,
Justification in PMP Simulator is Control Management System tracks the changes.

I do agree with you all, that answer should be Config Management system, In PMBOK or RITA i haven't seen "Control Management System", then how it could be Control Management system.
< 1 2 >

Please login or join to reply

Content ID:
ADVERTISEMENTS

"Life is but a walking shadow, a poor player that struts and frets his hour upon the stage and then is heard of no more. It is a tale told by an idiot, full of sound and fury, signifying nothing."

- William Shakespeare

ADVERTISEMENT

Sponsors