A project manager has created a document and wants to track the changes made in the document. The project manager should create _______.

linkedin twitter facebook  
avatar
Mahammad Ibrahim Scheduling Engineer | Samsung Engineering Gudivada, Andhra Pradesh, India
a) Configuration management system

b) Project Management Information system

c) Project management system

d) Control management system
Sort By:
< 1 2 >
avatar
Mahammad Ibrahim Scheduling Engineer | Samsung Engineering Gudivada, Andhra Pradesh, India
Sorry for the wait@Samuel, Answer is Control management system,
Justification in PMP Simulator is Control Management System tracks the changes.

I do agree with you all, that answer should be Config Management system, In PMBOK or RITA i haven't seen "Control Management System", then how it could be Control Management system.
avatar
Samuel Vaddi Avon, In, United States
You are correct, Mahammad. Control Management System does not seem like a term found in the PMBOK. Perhaps you should check the quality of this PMP Simulator.
avatar
Rami Kaibni
Community Champion
Senior Projects Manager | Field & Marten Associates New Westminster, British Columbia, Canada
May 09, 2016 12:24 AM
Replying to Mahammad Ibrahim
...
@Rami, Does Change Control system or Plan means configuration management system?
I did not really hear about Control Management Plan, there is Change Control Management Plan.
avatar
Mahammad Ibrahim Scheduling Engineer | Samsung Engineering Gudivada, Andhra Pradesh, India
May 09, 2016 8:23 AM
Replying to STEVE BOEDECKER
...
Control. You need to control the changes and track them. Config management would be to review the PROCEDURES for updates, etc.
@Steve, Its interesting that you said Control. and later Config management. We would like to see your opinion. You have something to say.
avatar
Avinash Bajaj Assistant Manager| Mahanagar Gas Limited Mumbai, Maharashtra, India
yes its true there is no terminology like Control Management System as i again say from my perspective Configuration Management system is the right answer as it helps you to review the documentation or versions of same & thus helps project manager to track changes...
avatar
Pushpa Bangalore Narayana Project Specialist| Webhelp Bangalore, Karnataka, India
Config management system helps to track changes through version control and it seems to be the right one.
avatar
Haitham Baraka Sr. Project Controls Manager | Hill International
a) Configuration management system
< 1 2 >

Please login or join to reply

Content ID:
ADVERTISEMENTS

"I never resist temptation, because I have found that things that are bad for me do not tempt me."

- George Bernard Shaw

ADVERTISEMENT

Sponsors