The Gantt chart will be as good as the inputs used to build it.
My recommendation before engaging in any Gantt chart is to create a project charter, and a work breakdown structure, with its activities. The activities will be based on the requirements you have collected previously.
Once you have this, you may start building a Gantt draft - i.e. allocate resources to each activity, duration, cost, etc.
To sum up, it is essential to have a rough approximation of a WBS, and project deliverables or milestones, before building a Gantt chart.
...
1 reply by Ali Adel Ali Ali Ibrahim
Sep 16, 2016 3:12 AM
Ali Adel Ali Ali Ibrahim
...
Thanks so much .. can you please provide me with any sample of Gantt chart .. I already have the WBS and the project charter !
I just need to take a look on a real project !
The Gantt chart will be as good as the inputs used to build it.
My recommendation before engaging in any Gantt chart is to create a project charter, and a work breakdown structure, with its activities. The activities will be based on the requirements you have collected previously.
Once you have this, you may start building a Gantt draft - i.e. allocate resources to each activity, duration, cost, etc.
To sum up, it is essential to have a rough approximation of a WBS, and project deliverables or milestones, before building a Gantt chart.
Thanks so much .. can you please provide me with any sample of Gantt chart .. I already have the WBS and the project charter !
I just need to take a look on a real project ! Saving Changes...
Have you search the Content in this site, could be a template the get you started when you have all pre-required documents stated by Eduard. Saving Changes...
Vinay ShahManager| NYISOWatervliet, Nj, United States
Hi all,
I am trying to make a 1-page project dashboard timeline. I intend to have several swimlanes for the various departments, and have high-level activities I need to represent.
I do not have the luxury of real-estate on my 1-page - therefor individual tasks need to be clustered together on the same line. Example: Requirements may be from Jan 1 thru Feb 1. Design may be Feb 1 thru March 15. I'd like to represent them on the same line.
does anyone have any templates that help with this? PPT/Visio/Excel/Etc.
Ali:
You have your WBS so build out your project schedule outline in MS Project and create a draft gantt chart. You can probably google construction gantt chart to see an examples but you have enough to create your own draft. Saving Changes...
I am trying to make a 1-page project dashboard timeline. I intend to have several swimlanes for the various departments, and have high-level activities I need to represent.
I do not have the luxury of real-estate on my 1-page - therefor individual tasks need to be clustered together on the same line. Example: Requirements may be from Jan 1 thru Feb 1. Design may be Feb 1 thru March 15. I'd like to represent them on the same line.
does anyone have any templates that help with this? PPT/Visio/Excel/Etc.
Thank you in advance!
Visio will work; look for an example template. Saving Changes...
Kathy CastleAuthor at https://www.projectcubicle.com/| FreelanceTx, United States
Ali,
Why don't you use Primavera P6 ? If you want I can send you an example project. Saving Changes...
Zaitulamrah AmanSenior Manager| Omesti BerhadKajang, Selangor, Malaysia
Can anybody share with me a sample of processing plan template or gantt chart. Appreciate very much for helping. Saving Changes...