How could we reduce residual risk

linkedin twitter facebook   Estimating  
avatar
Md. Masudur Rahman Project Manager| Pride Group Dhaka, Bangladesh
In spite of taking risk control measure I am observing some residual risk.
Sort By:
< 1 2 >
avatar
Md. Masudur Rahman Project Manager| Pride Group Dhaka, Bangladesh
Oct 30, 2017 8:45 PM
Replying to Henry Hattenrath
...
In line with Peter’s input - despite implementing a response to a triggered event, the risk still exists and will continue to be monitored. It is also evident that the response action may not be adequate to address the estimated cost and schedule impact of the risk event.

Whether threat or opportunity, the objective of the response is to minimize the impact of the threat or to maximize the benefit of the opportunity. As a result, the risk response may need to be re-evaluated and adjusted to assure the next time the event is triggered the response is more complete.
Thanks for your answer
avatar
Md. Masudur Rahman Project Manager| Pride Group Dhaka, Bangladesh
Oct 30, 2017 9:13 AM
Replying to Stéphane Parent
...
Kiron is correct. The cost of increasing a system's availability from 99.9% to 99.99% is enormous. Likewise, the smaller the residual risk, the more expensive it gets to manage it.

Sergio is also correct: your secondary risks can quickly grow larger than your residual risk.
Thanks for your opinion.
avatar
Najam Mumtaz Retired Lahore, Punjab, Pakistan
Sometimes residual risks remains even after all possible risk responses are applied and that is usually accepted by the organization.
...
1 reply by Md. Masudur Rahman
Nov 18, 2017 10:00 PM
Md. Masudur Rahman
...
Thanks for your opinion
avatar
Mansoor Mustafa Senior PM| Government Department Rawalpindi Punjab, Pakistan
Brother Masdur Rahman, residual risk is risk which remain after risk response planning. it should be document in risk register and kept on watch
...
1 reply by Md. Masudur Rahman
Nov 18, 2017 9:59 PM
Md. Masudur Rahman
...
Thanks mansoor Bhai
avatar
Md. Masudur Rahman Project Manager| Pride Group Dhaka, Bangladesh
Nov 18, 2017 10:59 AM
Replying to Mansoor Mustafa
...
Brother Masdur Rahman, residual risk is risk which remain after risk response planning. it should be document in risk register and kept on watch
Thanks mansoor Bhai
avatar
Md. Masudur Rahman Project Manager| Pride Group Dhaka, Bangladesh
Nov 18, 2017 10:08 AM
Replying to Najam Mumtaz
...
Sometimes residual risks remains even after all possible risk responses are applied and that is usually accepted by the organization.
Thanks for your opinion
< 1 2 >

Please login or join to reply

Content ID:
ADVERTISEMENTS

"The whole problem with the world is that fools and fanatics are always so certain of themselves, but wiser people so full of doubts."

- Bertrand Russell

ADVERTISEMENT

Sponsors