“What is Project Management,per the Project Management Institute?” (Strategy Execution Methodologies series. Post 2)

From the Change Whisperer on ProjectManagement.com Blog
by
This is a blog about Strategy Execution, about implementing change and driving ROI to the bottom line. It is intended for: Leaders and for Program, Project and Change Management practitioners trying to manage the weather systems of change raining inside the organization.

About this Blog

RSS

Recent Posts

Enterprise change vs Project change

Insights in Change Management—Interview with Kimberlee Williams, CEO, Ignitem (Part 1 Of 3)

What is leadership’s responsibility for driving and sustaining a nimble organization? Interview with Daryl Conner, Chairman, Conner Partners. Post 2 of 3

The strategic imperative of the "nimble organization" and the mirage. Interview with Daryl Conner

What is the Board’s Role in Strategy and Strategy Execution? Post 3 of 3

Categories

Change Management, Competencies, Culture, Ethics, Innovation, Leadership, Leading Change, Organization Development, Project Management, Resilience, Risk Management, ROI, Sponsorship, Strategy, strategy

Date

linkedin twitter facebook Request to reuse this  


Strategies identify “what” needs to change. Project management provides a structure for “how.” Some go so far as to say that “projects are the vehicles of change.” 

The most common organizational flow is this:

  1. The leadership team analyzes the market and documents a 3-, 5-, or 10-year strategic plan.
  2. Each functional leader takes it back to his or her division and identifies initiatives that will serve the strategic direction. (For example, if the strategy calls for integrating global systems for x% efficiency, then the leader may choose to select and implement an ERP system.)
  3. A team is assembled to execute each current initiative.  The team usually includes people who have full-time jobs that will be impacted by the initiative and who will have important insights as to what this organization specifically needs.  It may include additional project-specific resources.
  4. The team needs an interim leader—a project manager (PM).  The PM’s role is to guide the team through initiation, planning, design, implementation, monitoring, closing, and post mortem.  
  5. Project managers use a structured process to ensure delivery across three dimensions: scope, time, and budget.

History for context

It is important to realize that project management is a relatively young discipline, born in the height of the industrial age.  In the 1950s, project management was formalized in the construction industry to systemize and synchronize heavy engineering projects: “At that time, two mathematical project-scheduling models were developed—the ‘Critical Path Method’ (CPM) as a joint venture between DuPont Corporation and Remington Rand Corporation for managing plant maintenance projects, and the ‘Program Evaluation and Review Technique’ or PERT, developed by Booz Allen Hamilton as part of the United States Navy's (in conjunction with the Lockheed Corporation) Polaris missile submarine program.” (1)   A tactical, logistics-based approach made a lot of sense for such initiatives; the strengths of the approach were increasingly modified for private enterprise.

These approaches were codified into basically two schools: The Project Management Institute’s (PMI’s) approach, predominantly used in North America, and PRINCE2, which was derived from a UK government initiative.  The spheres of influence seem to radiate out of these centers.

This post addresses PMI’s approach, and the next post will address PRINCE2. 

What is “Project Management”—per PMI?

PMI provides a definition of “What is Project Management”on its website (2).  Here are a couple of relevant excerpts for our discussion:

  • Project management is the application of knowledge, skills, and techniques to execute projects effectively and efficiently. It’s a strategic competency for organizations, enabling them to tie project results to business goals and, thus, better compete in their markets.
  • PMI defines five processes: initiating, planning, executing, monitoring and controlling, and closing.
  • There are nine areas of knowledge: integration, scope, time, cost, quality, procurement, human resources, communications, and risk management. 
  • PMI’s methodology is best known for focusing on the “triple constraint” of scope, time, and cost.
  • Practitioners are certified and place the designation Project Management Professional (PMP)® after their names. PMI offers further designations—Certified Associate in Project Management (CAPM)®, Program Management Professional (PgMP)®, PMI Agile Certified Practitioner (PMI-ACP)SM, PMI Risk Management Professional (PMI-RMP)® and PMI Scheduling Professional (PMI-SP)®.
  • Depending on the size of the initiative, a program manager is retained to manage a group of projects. Where an individual project is of sufficient size or complexity, a project manager is retained to run it. In very large programs, several project managers will report to a lead project manager.
  • The senior program or project manager works with the business owner (often referred to as the “sponsor”) to plan and execute the project.

Discussion

In my view, project management is an essential discipline on most incremental change and on all transformational change. The challenge for many organizations is figuring out the answer to the question, “How much project management rigor do we need?” The rigor rises with the degree of difficulty of the project. 

At the level of transformational change, the requirement at the highest levels expands into program or portfolio management, which provides for a rolled-up and comprehensive view of the current status of all projects supporting the strategy (again against scope, time, and budget). 

To all the Project Management Professionals (PMPs) out there: if you feel that I have missed anything, please do comment.

What’s next?  A review of PRINCE2 and then we peer into the murky waters of change management?a younger discipline that is advancing rapidly. Stay tuned… in fact perhaps you’d like to subscribe. If you are not reading this post on my home site you can link over to The Change Whisperer(http://gailseverini.wordpress.com/) and look for the subscribe button top left.

References:

  1. “Project Management”, Wikipedia
  2. Project Management Institute (PMI)

Related Posts:


Posted on: May 06, 2012 06:25 AM | Permalink

Comments (1)

Please login or join to subscribe to this item
avatar
Kevin Coleman Subject Matter Expert, Author, Speaker and Strategic Advisor| - Insights Pa, United States
Interesting point of view

Please Login/Register to leave a comment.