Dr.Shaban Osman |Consultant |Instructor |Author|| freelancer Elshourk, Egypt
In pmbok 6 edition ,there is a new register called lessons learned register ,so my question is what is the deference between it and lessons learned which exist on OPA ?
Sort By:
< 1 2 >
avatar
Dr.Shaban Osman |Consultant |Instructor |Author|| freelancer Elshourk, Egypt
May 17, 2018 5:48 PM
Replying to Sante Delle-Vergini, PhD
...
We have to start somewhere, and that is recording LL throughout the project.
Thanks
avatar
Dr.Shaban Osman |Consultant |Instructor |Author|| freelancer Elshourk, Egypt
May 17, 2018 10:53 AM
Replying to Sergio Luis Conte
...
Lessons Learned is the "what". Lessons Learned Register is the tool to register Lessons Learned. Inside OPAs you have Lessons Learned registered inside the Lessons Learned Registered and it will be part of the knowledge base system (where system is not software system)
Thanks