Colleagues, as Project Managers, we are usually the ones driving change. However, I want to talk about what happens when there is simply too much of it.

Nowadays, organizations are constantly implementing new software, changing internal processes, or restructuring departments—often all at the same time. This leads to "change saturation" or "change fatigue," where teams become overwhelmed, lose motivation, and start resisting even the good projects.

I would love to hear your experiences on this topic.

Questions for the community:

What are the early warning signs you notice when a team has reached its limit for change?

How do you manage a project when the team is already exhausted from previous implementations?

Have you ever had to push back and tell stakeholders, "We need to pause; the organization cannot handle another new initiative right now"? How did that go?

Looking forward to reading your strategies!

Francisco

Sort By:
< 1 2 >
avatar
Luis Branco CEO| Business Insight, Consultores de Gestão, Ldª Carcavelos, Lisboa, Portugal
A very relevant question, Francisco.
I would add one distinction: change saturation may not primarily reflect a limit in people’s capacity to absorb change. It may signal a pattern of change that exceeds or conflicts with the organization’s capacity to govern and absorb it.

Individually justified initiatives can become collectively unmanageable when they compete for the same people, attention and capabilities, or introduce conflicting priorities, incentives and ways of working.

That is why I would be cautious about treating fatigue or resistance as the problem itself.
They may be signals of a deeper portfolio or organizational issue.

The response is therefore not necessarily to make people more resilient, or simply to pause. It may require reprioritizing, resequencing, integrating or stopping initiatives, while addressing the conditions that constrain absorption.

Before asking whether people can handle another change, perhaps governance should ask whether the organization should be generating and combining change in this way at all.
...
1 reply by Francisco Herrera
Aug 24, 2026 2:38 PM
Francisco Herrera
...
Yes Luis we often blame 'change fatigue' on the team's resilience, when the real issue is poor portfolio governance. Treating resistance as a symptom of conflicting priorities rather than the root problem makes a lot of sense. Thanks! Francisco.
avatar
Francisco Herrera
Community Champion
Program Manager, PPM&PMO Specialist.| Coppel, Mexico. Culiacán, Sinaloa, Mexico
Aug 22, 2026 5:15 AM
Replying to Luis Branco
...
A very relevant question, Francisco.
I would add one distinction: change saturation may not primarily reflect a limit in people’s capacity to absorb change. It may signal a pattern of change that exceeds or conflicts with the organization’s capacity to govern and absorb it.

Individually justified initiatives can become collectively unmanageable when they compete for the same people, attention and capabilities, or introduce conflicting priorities, incentives and ways of working.

That is why I would be cautious about treating fatigue or resistance as the problem itself.
They may be signals of a deeper portfolio or organizational issue.

The response is therefore not necessarily to make people more resilient, or simply to pause. It may require reprioritizing, resequencing, integrating or stopping initiatives, while addressing the conditions that constrain absorption.

Before asking whether people can handle another change, perhaps governance should ask whether the organization should be generating and combining change in this way at all.
Yes Luis we often blame 'change fatigue' on the team's resilience, when the real issue is poor portfolio governance. Treating resistance as a symptom of conflicting priorities rather than the root problem makes a lot of sense. Thanks! Francisco.
...
1 reply by Tuan Mark
Aug 29, 2026 3:37 AM
Tuan Mark
...
Hi
I think one of the biggest warning signs is when people stop asking questions and simply say, “Sure, whatever we need to do.” That can look like acceptance, but often it means they are tired of another initiative and have mentally disengaged.
When a team is already overloaded, I try to look at the full portfolio rather than treating each project separately. Sometimes the right answer is not better change management, but actually stopping, delaying, or removing lower-priority initiatives. I’ve found that showing stakeholders the combined impact on the same people makes the conversation much easier.
A pause doesn’t have to mean failure. Giving a team enough time to stabilize and absorb previous changes can ultimately make the next project much more successful.
avatar
Kiron Bondale Retired | Mentor| Retired Welland, Ontario, Canada
Francisco -

Often times I've found it is not the team but the affected or impacted stakeholders who experience this fatigue. This results from a couple of common causes:

  1. The size of the changes is too big. This is common when a predictive rather than an adaptive approach is used. I like to use the analogy of swallowing one huge pill vs a few small ones.
  2. There is no coordination of changes across the portfolio. Individual discrete projects may all hit the same stakeholders and yet the PMs and sponsors don't try to phase & pace the changes to avoid change fatigue.
Kiron
...
1 reply by Francisco Herrera
Aug 27, 2026 1:50 PM
Francisco Herrera
...
Yes Kiron, stakeholders are often the ones suffering the most. I really liked your analogy about swallowing one huge pill versus a few small ones. It perfectly explains why an adaptive approach is so valuable for reducing change fatigue.
Francisco.
avatar
Francisco Herrera
Community Champion
Program Manager, PPM&PMO Specialist.| Coppel, Mexico. Culiacán, Sinaloa, Mexico
Aug 24, 2026 6:38 PM
Replying to Kiron Bondale
...
Francisco -

Often times I've found it is not the team but the affected or impacted stakeholders who experience this fatigue. This results from a couple of common causes:

  1. The size of the changes is too big. This is common when a predictive rather than an adaptive approach is used. I like to use the analogy of swallowing one huge pill vs a few small ones.
  2. There is no coordination of changes across the portfolio. Individual discrete projects may all hit the same stakeholders and yet the PMs and sponsors don't try to phase & pace the changes to avoid change fatigue.
Kiron
Yes Kiron, stakeholders are often the ones suffering the most. I really liked your analogy about swallowing one huge pill versus a few small ones. It perfectly explains why an adaptive approach is so valuable for reducing change fatigue.
Francisco.
avatar
Tuan Mark United States
Aug 24, 2026 2:38 PM
Replying to Francisco Herrera
...
Yes Luis we often blame 'change fatigue' on the team's resilience, when the real issue is poor portfolio governance. Treating resistance as a symptom of conflicting priorities rather than the root problem makes a lot of sense. Thanks! Francisco.
Hi
I think one of the biggest warning signs is when people stop asking questions and simply say, “Sure, whatever we need to do.” That can look like acceptance, but often it means they are tired of another initiative and have mentally disengaged.
When a team is already overloaded, I try to look at the full portfolio rather than treating each project separately. Sometimes the right answer is not better change management, but actually stopping, delaying, or removing lower-priority initiatives. I’ve found that showing stakeholders the combined impact on the same people makes the conversation much easier.
A pause doesn’t have to mean failure. Giving a team enough time to stabilize and absorb previous changes can ultimately make the next project much more successful.
...
1 reply by Francisco Herrera
Sep 04, 2026 12:13 PM
Francisco Herrera
...
Tuan our point about people saying, 'Sure, whatever' is so accurate. It is very easy to confuse apathy with acceptance, but as you mentioned, it is actually a clear sign of mental exhaustion. I also agree that looking at the portfolio level is the best way to handle this.
Francisco
avatar
Robert Snyder Founder & President| Innovation Elegance, LLC Chicago, Il, United States
The culture trait of saturation has been around a long time without a standardized solution. This is because executives have the skills and incentives for saturation. The alternative to saturation is synchronization. If executives had the skills and incentives for synchronization, they would shape cultures for it. They don't, so they don't. For many executives, saturation is the whole point.

For Operations, scale and synchronization is attractive to executives.
But for Innovation and Change, scale and synchronization is not attractive. Saturation is attractive.
...
1 reply by Francisco Herrera
Sep 01, 2026 1:56 PM
Francisco Herrera
...
Robert ff leadership is rewarded for launching as many initiatives as possible, saturation becomes the actual goal, not a problem to solve. It really highlights that fixing change fatigue requires shifting the mindset at the very top.
Francisco..
avatar
Francisco Herrera
Community Champion
Program Manager, PPM&PMO Specialist.| Coppel, Mexico. Culiacán, Sinaloa, Mexico
Aug 29, 2026 2:37 PM
Replying to Robert Snyder
...
The culture trait of saturation has been around a long time without a standardized solution. This is because executives have the skills and incentives for saturation. The alternative to saturation is synchronization. If executives had the skills and incentives for synchronization, they would shape cultures for it. They don't, so they don't. For many executives, saturation is the whole point.

For Operations, scale and synchronization is attractive to executives.
But for Innovation and Change, scale and synchronization is not attractive. Saturation is attractive.
Robert ff leadership is rewarded for launching as many initiatives as possible, saturation becomes the actual goal, not a problem to solve. It really highlights that fixing change fatigue requires shifting the mindset at the very top.
Francisco..
avatar
Fayez Alasiri Saudi Arabia

For many executives, saturation is not simply a by-product of the system; it is the objective itself. The focus becomes maximizing activity, increasing coverage, adding resources, and continuously responding to issues rather than addressing the structural causes that create those issues. From an Operations perspective, however, scale and synchronization are far more attractive and sustainable. Operational excellence is not achieved by continuously adding people, controls, meetings, or interventions. It is achieved when the organization can scale its capabilities while maintaining consistency, coordination, reliability, and control. Synchronization allows Operations to move from a reactive model to a proactive one. It connects planning, resources, maintenance, service delivery, performance management, and decision-making into one coordinated system. The objective is not simply to do more, but to make the entire operation work better together. At scale, synchronization becomes even more critical. Without it, growth creates complexity, duplication, conflicting priorities, communication gaps, and increased operational risk. With it, scale becomes an advantage: resources can be optimized, responsibilities can be clarified, decisions can be accelerated, and performance can be measured consistently. Ultimately, saturation increases activity, while synchronization increases effectiveness. Saturation may provide short-term visibility, but synchronization creates long-term operational capability. For Operations, the real opportunity is therefore not to build a culture that depends on constant saturation, but to build a culture where people, processes, technology, and resources are synchronized to deliver predictable and sustainable performance at scale. The goal is not to create an organization that can work harder indefinitely; it is to create an organization that can scale intelligently, synchronize effectively, and perform consistently.

...
1 reply by Francisco Herrera
Sep 09, 2026 8:19 PM
Francisco Herrera
...
Fayez Alasiri the contrast you make between executive goals (maximizing activity) and operational needs (consistency and coordination) explains a lot of our daily struggles. It is very difficult to build a proactive environment when top management only rewards short-term saturation. Your point about scaling intelligently rather than just working harder indefinitely is spot on.
Francisco.
avatar
Sergio Luis Conte Helping to create solutions for everyone| Worldwide based Organizations Buenos Aires, Argentina
If an organization has "change saturation" then it will desapear.
...
1 reply by Francisco Herrera
Sep 07, 2026 7:26 PM
Francisco Herrera
...
Sergio Luis that is a very interesting and bold statement! Could you elaborate a bit more on why you think this happens? Do you mean the organization will disappear because it loses its market position, or because employees will eventually leave due to burnout?
Francisco
avatar
Francisco Herrera
Community Champion
Program Manager, PPM&PMO Specialist.| Coppel, Mexico. Culiacán, Sinaloa, Mexico
Aug 29, 2026 3:37 AM
Replying to Tuan Mark
...
Hi
I think one of the biggest warning signs is when people stop asking questions and simply say, “Sure, whatever we need to do.” That can look like acceptance, but often it means they are tired of another initiative and have mentally disengaged.
When a team is already overloaded, I try to look at the full portfolio rather than treating each project separately. Sometimes the right answer is not better change management, but actually stopping, delaying, or removing lower-priority initiatives. I’ve found that showing stakeholders the combined impact on the same people makes the conversation much easier.
A pause doesn’t have to mean failure. Giving a team enough time to stabilize and absorb previous changes can ultimately make the next project much more successful.
Tuan our point about people saying, 'Sure, whatever' is so accurate. It is very easy to confuse apathy with acceptance, but as you mentioned, it is actually a clear sign of mental exhaustion. I also agree that looking at the portfolio level is the best way to handle this.
Francisco
< 1 2 >

Please login or join to reply

Content ID:
ADVERTISEMENTS

"Put your hand on a hot stove for a minute, and it seems like an hour. Sit with a pretty girl for an hour, and it seems like a minute. THAT's relativity."

- Albert Einstein

ADVERTISEMENT

Sponsors