Project Management

Software Development: Controlled Introduction

By

This plan covers:

  • Requirements Analysis
  • Design of Architecture
  • Specify and Implement Features
  • Design Verification (DV)
  • System Test (ST)
  • Controlled Introduction (CI)
  • Extended System Test (EST)

People who downloaded this item also downloaded . . .

Premium Content
PMI Membership
Sign up for PMI Membership to download this project plan and get unlimited access to our library of webinars, time-saving templates and more.
PMI Membership perks include job opportunities, local chapters, respected publications, and standards.   Learn more
Already a PMI Member? Log in now.

ADVERTISEMENT

505
Downloads
ADVERTISEMENTS

"What is the voice of song, when the world lacks the ear of taste?"

- Nathaniel Hawthorne

ADVERTISEMENT

Sponsors