Project Management

Stakeholders Management: The Storm Is Never the Problem

From the The Young Project Manager Blog
by
Practical growth for project managers in the early stage of their careers.

About this Blog

RSS

Recent Posts

The Art of the Strategic Trade-Off in Project Management

The Junior Project Manager's Trap: Saying Yes Too Fast, Regretting It Too Late

Stakeholders Management: The Person Everyone Checks With Before They Say Yes

Stakeholders Management: The Storm Is Never the Problem

The Plan Will Not Save Your First Project

Categories

Agile, Artificial Intelligence, career, Career Development, Career Development, Change Management, Education, Stakeholder Management

Date

linkedin twitter facebook Request to reuse this  


By the time a stakeholder issue surfaces, you are already managing fallout. What project managers miss is the silence that builds long before anyone speaks up.

A colleague came to me frustrated after a project review.

"I don't understand," she said. "Everything was on track. The team delivered. And now, at the very end, this stakeholder appears and questions everything."

I asked her when she had last talked to that person. Not updated. Talked. She thought for a moment. "In the kickoff meeting, I think."

That was four months earlier...

The thing is, the problem didn't start at the review. It started at month two, when an assumption was made that nobody checked. And at month three, when a risk came up that nobody mentioned because it didn't feel urgent yet. And at month four, when the stakeholder sent a short reply to an update email and everyone read it as agreement.

It wasn't agreement. It was silence. And silence, in a project, almost never means what we think it means.

The storm is never the problem. The silence before it is.

Most stakeholder issues don't announce themselves.

Actually, they grow quietly, in the space between conversations that should have happened and didn't. By the time something surfaces, you're not leading anymore. You're managing the fallout. And there's a big difference between those two things.

The fix is less complicated than it sounds. But it requires doing something that feels almost too simple to matter.

Show up early. Before you have anything important to say.

That early presence does something that no status report can do. It builds trust. And trust, in a project, works a lot like a battery. You don't charge it when the power is out. You charge it in advance, in small moments that feel almost irrelevant at the time.

Every check-in that wasn't strictly necessary. Every question asked before there was even a problem to solve. Every "just wanted to hear how this looks from your side" sent on a Tuesday with no agenda attached. Those are deposits. They feel like nothing. But they accumulate. And when the hard moment comes, and it always comes, you find the battery isn't empty.

Here is what I've learned about what stakeholders actually want. Not from a book. From watching projects go right and wrong for a long time.

They want to feel heard. Not informed. Heard. There's a difference. An update tells them what's happening. A conversation makes them feel like they're part of it.

They want to be included, even when they're not the one deciding.

And they want to feel safe. Safe from being surprised. Safe from being blamed for something they didn't fully shape. Safe from waking up in month four and realizing the project went somewhere nobody told them it was going.

You can't fix all of that with a stakeholder map. You fix it with a few honest conversations, started early enough that there's nothing at stake yet.

Ask how the project connects to what they're already carrying. Ask what success looks like from their side, not the project plan's side. Those are different things more often than you'd expect. Ask what worries them most. Ask what usually goes wrong in projects like this one. That last question is underrated. Most stakeholders have seen this kind of project before. They have pattern recognition you don't have yet. And when you ask, you get something more useful than their approval. You get their real experience.

You don't do this all at once. You make it part of the rhythm. And then, the hard part: you actually listen to what they say.

The mistakes that cost the most are embarrassingly simple.

Waiting too long to engage because you want something real to show first. Sending everyone the same update and calling it communication. Going quiet about a risk because you're not ready to explain it. Getting defensive when someone pushes back instead of getting curious. Forgetting the quiet stakeholder, the one who never replies much, who turns out to have the most influence in the room.

None of those are process failures. They're attention failures. And that is actually human, not based on certifications or project management qualifications.

Which means they're fixable, starting today, without a new framework.

Pick one stakeholder. The quiet one. The one you haven't really spoken to since the kickoff. Send a short message. Something close to this:

"I'd love to hear how this project looks from where you sit. What am I missing?"

One sentence. It costs almost nothing. And it can shift the entire dynamic of a project.

Projects run on schedules and budgets. But they move forward on relationships.

So who is the one stakeholder you haven't really talked to yet?
Posted on: July 20, 2026 01:00 AM | Permalink

Comments (11)

Please login or join to subscribe to this item
avatar
Kwiyuh Michael Wepngong
Community Champion
Financial Management Specialist | US Peace Corps Yaounde, Centre, Cameroon
Hi William, merci! thanks for sharing this

avatar
Jamie Bell St George, Utah, United States
Excellent - thank you for sharing.

avatar
Satyananda Sahu Senior Engineering Manager| Immediate Joiner - Unemployed, Seeking Opportunity Bengaluru, Karnataka, India
Nice post. In today’s digital era of agile practices, leaders cannot afford to stay behind. They must efficiently leverage the benefits of digital communication to keep stakeholders informed and engaged, tailoring their approach to the specific type of stakeholder they are dealing with. By doing so, leaders not only maintain stakeholder satisfaction but also enable more efficient delivery and sustained success.

avatar
robert morton Project Services Manager| Nikkiso Clean Energy Industrial Gas Flowery Branch, Ga, United States
Thanks for the great insight on stakeholder management. No news doesn't always mean good news...

avatar
Mark van Rijnbach Senior Project Coordinator| Cognizant Technology Solutions Amsterdam, Netherlands
Hi William,
Great article with very interesting insights!
Thanks a lot for sharing this.
Regards Mark

avatar
Javier Gomez Head of Railway Projects Division| GMV Spain
Thanks!

avatar
Georgiy Zelkind Project Management Head| Sulzer Pumps Russia Russian Federation
"They want to feel safe from being blamed for something they didn't fully shape.
You can't fix all of that with a stakeholder map.
None of those are process failures.
Projects run on schedules and budgets. But they move forward on relationships."
Each sentence in the article is spot on. Thank you, William

avatar
Silvia Gutberlet PM Specialist| Lufthansa Cargo AG Marburg, Germany
Thanks for this very good article! The answers of some stakeholders are really surprising at times, and it really pays off to stay in touch constantly.

avatar
Thomas Dittscher Project Manager Health & Care| d.velop AG Lübeck, SH, Germany
Great reminder to reflect more often on a pro-active stakeholder management!
Thank you!

avatar
Kelly Lim Project Manager Singapore, Singapore
Thank you for the reminder!

avatar
Bianca Lankford Senior Technical Infrastructure Program Manager| Amazon
This is so true! Thank you for sharing your experience with our community. Oftentimes PMs assume that “silence is golden” and “no news is good news”. And in our busy days of back-to-back meetings, the effort of building relationships can take a backseat. Thank you for challenging us to see projects from our stakeholder’s perspective and staying curious. More than anything else, people are what drives project success.

Please Login/Register to leave a comment.

ADVERTISEMENTS

"I have taken more good from alcohol than alcohol has taken from me."

- Winston Churchill

ADVERTISEMENT

Sponsors