Game Theory in Management

by
Modelling Business Decisions and their Consequences

About this Blog

RSS

Recent Posts

George Jetson, Bring Me A Rock!

How To Obstruct A PMO

Rage, Rage Against The Dying Of The Project

Think You Have A Culture Problem? Think Again.

Finally! A GAAP Concept PMs Can Get Behind!

Categories

Game Theory, PMO, Politics, Risk Management, Strategic Management

Date

The Decline of Star Trek and Its Implications for Requirements Management

linkedin twitter facebook Request to reuse this  

Every junior-high school English student knows what classical plot structure looks like: you introduce the characters and a problem confronting them, then the conflict increases leading to rising action, which continues until the protagonists, using their talents, skills, and energies, overcome the antagonists/source of the conflict at the climax, then falling action, followed by the conclusion. For whatever reasons this structure has shown itself to be highly successful in all forms of story-telling, from ancient Greek theater to modern blockbuster movies, when it is done correctly. However, structuring your plot incorrectly, or abandoning the classic structure altogether, is to court disaster.

Take Star Trek, Gene Roddenberry’s masterpiece of 1960s science fiction television drama. Roddenberry has been quoted often as having sold the original series (TOS) to prospective network buyers as “a Wagon Train to the stars.” For those of you too young to know, Wagon Train was another television drama set in the American West frontier. Westerns were very popular during the late 1960s, and I think Roddenberry’s use of this particular idiom to describe his idea for a science fiction drama was a way to convey that the writing for his series would follow the classic plot structure that the Westerns did, just in a different setting/time.

But before we go to that different time, the 23rd Century, let’s jump back to the 5th Century B.C.  In ancient Greek theater, where the classic plot structure was introduced to Western culture, even here a pernicious element entered the fray. The plot device of deux ex machina, literally “god from a machine,” made its appearance. This silly plot device entailed the introduction of the characters and central conflict, consistent with classic plot structure, as well as the rising action leading to the climax. However, with deux ex machina, instead of the protagonists overcoming the conflict’s source/antagonists with their efforts and talents, some Greek god would be craned onto the stage and, using their divine powers, set all of the issues aright. This dopey device was recognized at substandard, even in ancient times. This recognition didn’t stop its use, however.

Now let’s jump back to the 20th century. TOS’s episodes were mostly written using classic plot structure, and were highly enjoyable, save when the writers swerved into overly preachy social commentary. Twenty-one years after TOS was cancelled, Roddenberry was back with Star Trek: The Next Generation (TNG). However, in the intervening years Roddenberry came to see himself less as a producer seeking to entertain audiences, and more as some kind of visionary with special insights in to how the future should unfold. Unlike TOS, TNG often abandoned classic plot structure in favor of deux ex machina, with the “god” Communication craned into the story to set all aright: all that conflict we’ve been experiencing for the first 49 minutes of the episode? It was all a big misunderstanding, don’t you know, rooted in some base human instinctive reflex. While the special effects in TNG were vastly superior to TOS, the writing was, in my opinion, vastly inferior, which is perhaps why TOS’s Enterprise is on display in the Smithsonian’s National Air and Space museum, along with the Wright Flyer and the Apollo 11 command module, while TNG’s Enterprise, well, isn’t

What’s all this got to do with requirements management, you ask? In reviewing some of the literature addressing issues central to requirements management, the theme of better communications is often invoked. Not to criticize, but my take is a bit different. Requirements management is to IT project management what scope and configuration control is to construction or hardware PM. In these arenas, there’s a natural but subtle source of conflict in establishing the scope baseline: the customer is rewarded for allowing a certain vagueness in the scope documents by having the latitude to “move the goalposts,” or surreptitiously add scope without increasing costs.  The contractor is rewarded for imprecision in the scope baseline by delivering a cheaper product that fulfills the most basic interpretation of the contract terms. With both parties thus motivated, the problem is NOT in the communications themselves, meaning that improving the communications will not necessarily help remediate the most common problems encountered in requirements management space.

In my opinion the most common issues in the requirements management arena are rooted in a reluctance to abandon those business devices that allow greater latitude in the managing of projects, even if those devices depend on a certain deviousness. That’s the enemy that must be overcome, using our talents and energy, and waiting for the communications god to get craned onstage to set everything right is a futile pursuit.

Posted on: August 18, 2013 10:16 PM | Permalink | Comments (1)

Getting People to Love Your PMO

linkedin twitter facebook Request to reuse this  

Last week I “ran out of space” just as I was getting ready to reveal how to get people to stop hating your PMO. As I stated, the answer comes from Game Theory. I go through the complete analysis in my must-have books Things Your PMO Is Doing Wrong and Game Theory in Management, but I’ll offer up the simplistic version(s) here.

As I pointed out last week, one of the major reasons people tend to dislike Project Management Offices is because they tend to be headed by managers who do not understand that it’s impossible to leverage organizational power to compel an advancement in a capability. Put another way, even if you are these people’s organizational superiors, you really can’t make them “do” project management. Yes, yes, I know you’ve been told you can by your superiors, and you have had individual successes previously doing just that, especially if you have been in the military. But it’s undeniably true, even though the attempts take a variety of forms.

One of the silliest such attempts involves the writing of a procedure that requires people to participate in creating baselines and providing status, and then getting the organization’s executives to sign/endorse such procedures, followed by plopping copies of the new procedures on the desks of those from whom you need participation to make your new systems work. Here’s an intellectual exercise: four weeks after the procedures hit everyone’s desks, drop by the offices unannounced, and look where the procedure is located. Ninety-nine times out of one hundred, it’s on a bookshelf, or buried beneath other documents (maybe even the quality and risk procedures, heh heh, heh). I provide more extensive analysis of tactics that don’t work in my first book, but, for now, suffice to say that you can’t compel the advancement of a capability.

Interestingly enough, the quality that’s needed for a successful implementation from the PMO team, and especially its leaders, is absolute gold, but perhaps even rarer. It’s humility.

Let’s momentarily examine the opposite quality, arrogance. Besides being highly off-putting in inter-personal relationships, arrogance also carries an opiate that prevents its carriers from being able to recognize when they have committed an error.  I have seen this time and again, where a newly-minted PMP® or CCE®, having studied hard and exerted great effort to get their certifications, automatically think they can not be wrong in asserting anything that ought to occur in project management space. I don’t mean to pick on the certification-granting organizations here – advanced degrees, being involved in large, high-profile successful projects, or even an absurdly inflated opinion of the self, all can lead to the same crippling frame of mind. And once that sets in, the PMO’s chances of success have all but evaporated. The project teams your PMO is supposedly providing a service to now perceive that you seek to be their masters, or, at the very least, highly irksome, know-it-all kibitzers, best left out of the decision-making process.

However, the humble PMO knows it exists to generate an information stream for the benefit of the decision-makers in the organization. This information stream doesn’t have to be expensive or difficult, but it does have to be accurate and timely. If the information stream thus provided is either of the former, and neither of the latter, that’s on YOU, Mr. or Mrs. PMO director, NOT on the macro organization around you.

Most writers will often begin their careers with a set of ideas they feel they need to get off of their chests. Successful writers will soon encounter a transition where, instead of expressing themselves for the cathartic value of doing so, they will seek to provide what their writers want to read. Similarly, virtually all PMOs begin life with an idea that they will be the mechanism by which the macro organization advances in its project management capability. The successful ones will quickly undergo a transformation, where they realize their contribution is maximized when they provide accurate, timely, and (most of all) relevant information streams to the organizations’ decision-makers, and do so as unobtrusively as possible. Once the organization’s decision-makers realize the benefit of having ready access to the information they need to make the best choices on a regular basis, they will also realize that they won’t be able to function at their new, higher level without the PMO’s input.

At that moment, your PMO will be loved.

Posted on: August 11, 2013 06:24 PM | Permalink | Comments (2)

Why People Hate Your PMO

linkedin twitter facebook Request to reuse this  

In 1415, King Henry V of England was leading an army through France, attempting to reclaim the territory he believed was rightfully his, being the descendant of William of Normandy, later William the Conqueror. Henry was confronted by a much larger French army near the village of Agincourt and, on the 25th of October, the two armies came to battle.

When an army, in this case the French, confronts a significantly smaller force, the usual path to victory is to simply envelope the smaller force, forcing them to fight in every direction with no path to retreat. However, this tactic was denied the French, since the battlefield was in a long narrow field bounded on either side by thick forest. But even this did not seem problematic to them – they could simply throw more cavalry and infantry against the English front lines and overwhelm them that way. Unfortunately, the evening before saw torrential rains on the recently-plowed field. It was a sodden, muddy mess.

The typical man-at-arms of the period wore around 80 pounds of armor, either plate or chain-mail, and mounted knights wore far more. As the French advanced the approximately 300 yards, they became exhausted from trying to move forward in the muck. As soon as they came within range of the English longbowmen, they had to endure hundreds of iron-tipped arrows which could easily punch through most of their armor. By the time the remnants arrived at the front of the English lines they were easy marks for Henry’s men-at-arms who, wielding axes and maces, easily dispatched the exhausted French. One account maintains that a 5-foot-high wall of wounded, dead, and struggling Frenchmen lay just in front of the English position. By the end of the day Henry had won an astonishing victory.

Okay, Michael, you say, what does all of this have to do with the reason I clicked on this article, after having seen the title? What does this have to do with the Chief Financial Officer having a corner office, while the PMO personnel are lucky to not have to share cubicles? Well, I’ll tell you.

Back when the precepts of modern project management theory and practice were being codified, the United States Department of Defense was getting a little tired of major programs’ overruns and delays. They created the Cost/Schedule Control System Criterion, or C/SCSC. These guidelines for setting up baselines and generating cost and schedule performance reports were somewhat stringent; but, most of all, they were required of all contractors who wanted to do significant business with the DoD. You don’t want to “do” C/SCSC? Okay, fine, we’ll just take our mega contracts to your competitors, case closed. Generally speaking, this is no longer the case, what with the advances of the so-called graded approach and all. But at this time, “doing” PM was a rock-hard, inescapable requirement for doing business, much like observing Generally Accepted Accounting Practices is now.

The august managers who head up many of the PMOs currently cut their teeth on project management information systems and techniques during this period. It never occurred to them that parts of the macro organization would either silent veto attempts to advance a project management capability, or even resist them outright, until they found themselves in charge of the PMO and saw that exact reality unfold. For many, the fallback position was to engage in eat-your-peas style hectoring, which worked about as well as you would think. Some would resort to near-begging, with little better results. Project managers who did not want to have to engage proper PM techniques no longer had to, and those who wanted things to be different became very unpopular. Like the French at Agincourt, a major condition of the conflict had changed, and changed utterly. The ensuing reverses in applied PM tools and techniques has led directly to the type of management science caste system we see now, where accountants are somehow held to be far more valuable than Earned Value or Critical Path analysts, even though (as I have complained extensively in this blog) the general ledger can’t provide near the amount or quality of management information needed for an organization’s decision-makers that they claim. No, the answer to all of this, interestingly enough, comes from game theory, and is…

Oops! Out of space again. I will address the most appropriate technical approach to advancing the PMO’s mission in my next blog, assuming no accountants equipped with longbows get to me first.

Posted on: August 03, 2013 09:58 PM | Permalink | Comments (3)

The True Role of the PMO

linkedin twitter facebook Request to reuse this  

Identifying and articulating the most appropriate role of the Project Management Office has proven to be difficult in the extreme, and the pursuit of this goal has become epistemologically messy, also in the extreme. The practitioners and teachers of project management feel strongly, passionately about their profession, and, in my experience, experience much frustration from the fact that the loudest voices in the management sciences often give short shrift to PM’s advantages and, by extension, the practitioners’ professional worth. This has led to many project management theories being marketed far beyond their capacity for returning relevant information or economic behaviors which, in turn, provide fuel for those opposed to doing project management right, when they correctly point out the overreach. The risk management types represent a classic example of this taking of an invalid theory and advancing it to its absurd lengths, and thereby making the rest of us look like doofuses.

Of course, should the most appropriate role of the PMO actually be captured and articulated, it follows that it could be quantified, and that would represent the brass ring of PM. No more eat-your-peas-style hectoring to get your PMO funded, no siree! The erstwhile PMO directors could present irrefutable analysis that demonstrated to even the most suspender-clad asset manager (read: accountant) that a stubborn refusal to pursue excellence in project management has directly traceable and cataclysmic consequences, to the tune of X dollars per year. As long as the PMO’s budget is less than X, the massive conflict that has afflicted project management types from the beginning of the PM struggle would simply evaporate, having been settled in our favor. Within management science, and by extension the macro-organization, peace would reign at last, and we could get up off of our knees and cease our begging for monthly status. Project management nirvana!

Unfortunately, the Project Management Institute® attempted such a quantification with a slew of books that tried to provide the framework for an organization to compute its PMO’s – wait for it! – Return on Investment. I kid you not. In trying to justify what is, in essence, their raison de etre’, they actually reached back to the accountants’ bag of tricks in order to produce a hard number that would validate the PMO’s creation and support.  Sadly, even when used on an asset (rather than a capability), the formula for computing an ROI is so fraught with either poorly quantified or even unknowable parameters that its returned value is next to meaningless. And yet, the accountants love it, and even PMI® was led to resorting to its use. Amazing.

No, the only way – and I do mean only way – to capture the PMO’s role in the macro organization, as well as in management science in general, is to realize that project and asset management are not variations within the same management science meme. They are different utterly: they pursue different goals, with different tools. As I have often taken them to task in this space previously, the asset managers seek to maximize shareholder wealth. So taken are they with this little axiom that they have convinced themselves that any disagreement with it represents profound backwardness in the management sciences. Nevermind that the Tom Peters of this world mock them to their faces over the over-acceptance of their goal – they will never abandon it. Then along comes the project managers, who dare to say that the pursuit of the customers’ goals with respect to scope, cost, and schedule ought to at least have a place at the decision-makers table, and the asset managers have a collective conniption fit. But it is undeniably true that PM should have a role in providing the decision-makers’ information stream, even as the asset managers see their influence wane.

As I discuss in my must-have second book, Game Theory in Management, there is a third element that must come into play: strategic management. Asset, project, and strategic management represent the triad of management science groupings that provide the only known structure for assessing the benefit of establishing the information streams that can even allow an evaluation of the PMO’s value and role. The organization that is informed of its position relative to its assets, customers, and competition performance is in a place to provide its decision-makers with the information they need to make the correct choices. And the organization that makes the better choices will overcome its competitors every time.

Without a feed from each of the three management science types, the decision-makers are just shooting in the dark. And probably missing.

Posted on: July 28, 2013 07:17 PM | Permalink | Comments (0)

PMO Double-Agents

linkedin twitter facebook Request to reuse this  

Two weeks ago I blogged about the PMO’s natural enemies, and last week I wrote about its natural allies. Now I would like to discuss that odd duck, the PMO double-agents. Of course, in the world of espionage (or, at least, in the theatrical world of espionage) a double-agent is a spy who is ostensibly working for one side, but is actually working for the other. The true nature of the movie double-agents’ loyalties can make such movies’ plots very complex (Where Eagles Dare, I Spy, etc.).  Just imagine what they can do to the technical agenda of the Project Management Office.

“Now hold on, Michael!” you say. “How can a member of my PMO staff be surreptitiously working against my organization? For whom would they be doing this?” Well, I’ll tell you, and it has to do with the dual nature of critical path and earned value management information streams.

CPM and EVM information streams serve two purposes: they indicate how the projects are performing in cost and schedule space, and they provide the data points that support the narrative of how and why the things that happened to the projects happened the way they did.  The first purpose is rather easily attained, using the basic calculations I showed in my blog two weeks ago. The second is a bit trickier. For example, recall from my previous blog how you can get within 10% of an estimate at completion by simply dividing the cumulative actual costs by the estimated percent complete, and this simple trick also works for duration.  Clearly, this takes very little set-up, or even very much expertise, save the estimate of the percent complete. Compare this piece of first-purpose information with the amount of data needed to do a complete forensic analysis of a schedule should a subcontractor fail to perform to the contract specifications.  Their natural defense is to claim that your PMO allowed (or even initiated) scope creep, or gave informal directions for additional work to be performed. At an instant, if you had a poorly set-up work breakdown structure (WBS), or the verbiage in your work packages was anything but complete and detailed, your second-purpose PM information stream has just failed utterly.

To prevent this type of failure there has arisen within the ranks of PMO experts this narrative that, unless your scope baseline is exhaustively thorough, your cost estimate detailed in the extreme, your schedule virtually free of level-of-effort tasks or high levels of float, that the entire system is not just sub-par, it is worthless. The people within your PMO who hold to this narrative – they are the double-agents, and, wittingly or not, they can do great damage to the odds that your technical agenda will be met.

Here’s how it works: the unenlightened members of your organization (outside of your PMO) view what you do with a substantial amount of skepticism.  They think that all of the time, energy, and money spent on detailed baselines and their attendant artifacts are a waste, because they fail to generate the first-purpose information they crave. The baseline documents tend to simply occupy shelf space (like the PMBOK Guide®) unless and until some sort of forensic need arises. In order to sell these people that what your PMO brings to the table is (a) extremely valuable, and (b) well worth the price, you are going to have to stress the relevance, inexpensiveness, and accuracy of the cost-and-performance information stream. Those in your own organization who want to dig in their heels and insist that, without the expensive and (largely) irrelevant extremely detailed baseline documents, the whole thing is a waste are actually helping your opponents, who are only too happy to advance the narrative that your PMO does not deliver an information stream that’s worth the (now considerable) investment.

Consultants can be the worst about this, for, if the information stream that the macro organization craves isn’t really that difficult to set up and deliver, then it does not require any advanced or unique knowledge. Of course these will push the idea that properly-functioning PM information systems need advanced or unique knowledge – otherwise, there’s no reason to hire consultants! Hence the “80% confidence interval” silliness, where the risk management types try to horn in on the you-must-spend-megabucks-or-your-systems-are-worthless tripe.

And here you thought the risk management consultants and baseline integrity purists were working for your side!

Posted on: July 21, 2013 05:33 PM | Permalink | Comments (2)