Project Management
Step                                              0800                                               - Reengineer the Social Systems0800 Reengineer the Social Systems Step                                              1000                                               - Plan Facility Preparation1000 Plan Facility Preparation

Step 0900 - Reengineer the Physical Environment

Task 010 - Develop Facility Requirements
Task 020 - Develop Support System Requirements
Task 030 - Conduct Detailed Site Visits
Task 040 - Develop Design Concept
Task 050 - Develop Detailed Facilities Design
Task 060 - Develop Detailed Support Systems Design
Task 070 - Obtain Cost Estimates
Outputs
Templates for this Process
Templates for this Stage
Index
ADVERTISEMENT
linkedin twitter facebook Request to reuse this  

Description

The purpose of this step is to design or reengineer the physical environment to support the reengineered value stream. This may encompass simple tasks such as designing wiring or cabling layouts, or could involve a much more complex set of activities such as designing new workstations and workspace...

Please login/register to continue reading.


Outputs


ADVERTISEMENTS

"My sole inspiration is a telephone call from a producer."

- Cole Porter

ADVERTISEMENT

Sponsors