For my third and final professional example, I am using the UK Governments Infrastructure and Projects Authority guidance document Benchmarking – Best Practices. I was privileged to be asked to provide a ‘critical friend’ review of the document before it was issued in March of 2019. The document describes Benchmarking as the process of improving cost and performance against similar projects.
Benefits of Benchmarking by Project Stage. The IPA document states that benchmarking is useful at three key project stages.
- During policy creation to select the right project
- During detailed delivery conversations ; providing challenge and building confidence
- At the end of the project to assess performance, share learning and build continuous improvement into the system.
There are five C’s in this summary; policy creation, conversations; challenge; confidence and continuous improvement which cover the range of benefits that benchmarking provides
Infrastructure Benchmarking Process – The document provides guidance on the detailed process for the effective use of benchmarking; particularly in the matter for major infrastructure projects – rail and road – although I would argue that it could be applied to other types of project as well. At the core of the document there are seven steps to using effective benchmarking. To help explain the process I have developed an an acronym OCTAVIA – it is a Latin name – and means eighth-born baby.
Step 1: Confirm the project Objectives and set the metrics – get clarity on the basis for benchmarking
Step 2: Break the project into major Components for benchmarking – choose the benchmarks wisely
Step 3: Develop Templates for data gathering – create a common language and a forum of expertise
Step 4: Scope sources and gather data – a critical success factor is the Acquisition of data
Step 5: Validate and re-base the data – a further critical success factor is the quality of data
Step 6: Produce and test the benchmark figure – use Images and visual presentation
Step 7: Review and repeat, if necessary, before using data for benchmarking – Assess impact
In support of the process the IPA have created a Benchmarking Team to support the Transforming Infrastructure Performance (TIP) programme. The Benchmarking guide is also aligned to the TIES – Transport Infrastructure Efficiency Strategy – a Department for Transport (DfT) sponsored activity involving Transport for London (Tfl), Traffic England, High Speed 2 (HS2), Network Rail and Crossrail. Members of TIES have already worked together to produce a benchmarking forum for tunnelling which an excellent example of the benchmarking guidance in action.
Tunnel example – cost – The worked example produced by the benchmarking team at the IPA working with a forum of tunnellers representing a number of organisations; Crossrail; High Speed 2; Heathrow; Network Rail, Transport for London, Highways England; Thames Tideway Tunnel; National Grid and Scottish Water, The study was based on Tunnelling data across a range of infrastructure types. Of the 25 major tunnelling projects identified which have been recently completed in the UK, valid data points were collected for 16 of them.
The chart used has cost per unit face area against tunnel length – this is a standardised metric, based on face area where from my earlier pipeline example the standardised metric was based on diameter.
On analysis by the tunnelling benchmarking forum it was apparent that the data separated distinctly into transport tunnels and utility tunnels. The former were larger, in the range of 5.5m to 11.5m diameter but most fell between 6.8m and 8.1m, while utility tunnels were in the range of 2.m to 8.8m but most fell between 3.4m and 5.2m.
The principal drivers of cost across both groups are, perhaps unsurprisingly, length and diameter with some useful correlation of data points to form useful trend lines on the chart. This gives the data for either a benchmark against the trend or can help identity specific projects to benchmark against.
Tunnel example – schedule The second example is for schedule and the assessment of tunnel performance as a production rate – metre/week. Once again this gives either a benchmark against the trend or can help identify specific projects to benchmark against.
As a final point there are two lenses available for benchmarking here – what I would describe as the yin and yan of benchmarking - internal and external.
The point I want to draw out is the blending of Internal and External Benchmarking - these ideally interact for maximum benefit. Internal benchmarking is within an organisation such as across government or a major company; external benchmarking is with organisations outside your own. External benchmarking is normally harder to do as you need three things; legal considerations around Non-Disclosure Agreements (NDA) ; and Intellectual Property IP – and trust in the sharing of information in order to get maximum benefit.
However, my experience of a major oil and gas company, means that there can also be internal silos to deal with – we had upstream, downstream, petrochemicals and alternative energy with internal boundaries to deal with – primarily the issue of trust and different approaches – so benchmarking certainly facilitated sharing and learning. This is a similar situation across government but with a shared benchmarking mindset it should be possible to overcome differences across government agencies – Tfl, Traffic England, HS2, Network Rail, Crossrail all involved in the TIES effort.
To conclude – I’ve explained benchmarking, used one personal example – park running and three professional examples – pipelines, best practices and the IPA document top show illuminate benchmarking is the use of data to facilitate continuous improvement, to support target setting and creating a learning culture.
I believe passionately that using a benchmark gives an invaluable external perspective ; can remove ‘tunnel vision’ and prevent ‘groupthink’ . as a measure a benchmark provides a discussion point, a reasonable target and a fair comparison for a project.
My call for action is to use data and benchmark to help achieving professional and personal goals.



