Project Management

Budgeting System Workbook (Renewable Energy Projects)

By

Format: Report / Log

The drafting of a project budget always starts with a technical estimate of the quantities of materials, manpower hours and equipment needed to carry out the project. The way in which the engineering department elaborates its estimates is according to a purely technical detail without any regard for the detail necessary for the elaboration of a budget.

This system allows the project engineer to make estimates as they see fit, and the project manager to draw up the budget according to the detail most suited to project management. This system also allows you to draw up a rough bar chart, which then allows you to position the project costs over time (and which also allows you to manage the project during its execution). The downloadable zip file contains an Excel workbook and its manual as a Word document.

People who downloaded this item also downloaded . . .

Premium Content
PMI Membership
Sign up for PMI Membership to download this deliverable and get unlimited access to our library of webinars, time-saving templates and more.
PMI Membership perks include job opportunities, local chapters, respected publications, and standards.   Learn more
Already a PMI Member? Log in now.

ADVERTISEMENT

552
Downloads
ADVERTISEMENTS

"When one door closes another door opens; but we often look so long and so regretfully upon the closed door that we do not see the ones which open for us."

- Alexander Graham Bell

ADVERTISEMENT

Sponsors