Project Closeout Checklist

By

The project closure checklist should summarize and condense much of the information and data from the project. This data could include the following items in addition to information that is specific to the project:

  • The scope: both the original planned scope and the scope that was met by the final result of the project.
  • The issues and risks faced by the project and how they were dealt with during the execution of the project.
  • The actual data from the project plan versus the baseline data.

This template covers ample questions for integration, scope, time, cost, quality, HR, communication, risk and procurement management.

Related Content

People who downloaded this item also downloaded . . .

Log in or sign up to download this checklist
Log In
OR
Sign Up

ADVERTISEMENT

10,219
Downloads

Reviews (11)

Login/join to subscribe
Page:
Page:
ADVERTISEMENTS

"Nearly every great advance in science arises from a crisis in the old theory, through an endeavor to find a way out of the difficulties created. We must examine old ideas, old theories, although they belong to the past, for this is the only way to understand the importance of the new ones and the extent of their validity."

- Albert Einstein

ADVERTISEMENT

Sponsors