The project closure checklist should summarize and condense much of the information and data from the project. This data could include the following items in addition to information that is specific to the project:

  • The scope: both the original planned scope and the scope that was met by the final result of the project.
  • The issues and risks faced by the project and how they were dealt with during the execution of the project.
  • The actual data from the project plan versus the baseline data.

This template covers ample questions for integration, scope, time, cost, quality, HR, communication, risk and procurement management.

Related Content

People who downloaded this item also downloaded . . .

Log in or sign up to download this checklist
Log In
OR
Sign Up

ADVERTISEMENT

26,092
Downloads

Comments (24)

Login/join to subscribe
Page:
Page:
ADVERTISEMENTS

Love can sweep you off your feet and carry you along in a way you've never known before. But the ride always ends, and you end up feeling lonely and bitter. Wait. It's not love I'm describing. I'm thinking of a monorail.

- Jack Handey

ADVERTISEMENT

Sponsors