Project Closeout Checklist

By

The project closure checklist should summarize and condense much of the information and data from the project. This data could include the following items in addition to information that is specific to the project:

  • The scope: both the original planned scope and the scope that was met by the final result of the project.
  • The issues and risks faced by the project and how they were dealt with during the execution of the project.
  • The actual data from the project plan versus the baseline data.

This template covers ample questions for integration, scope, time, cost, quality, HR, communication, risk and procurement management.

Related Content

People who downloaded this item also downloaded . . .

Log in or sign up to download this checklist
Log In
OR
Sign Up

ADVERTISEMENT

9,080
Downloads

Reviews (11)

Login/join to subscribe
Page:
Page:
ADVERTISEMENTS

"Impartial observers from other planets would consider ours an utterly bizarre enclave if it were populated by birds, defined as flying animals, that nevertheless rarely or never actually flew. They would also be perplexed if they encountered in our seas, lakes, rivers and ponds, creatures defined as swimmers that never did any swimming. But they would be even more surprised to encounter a species defined as a thinking animal if, in fact, the creature very rarely indulged in actual thinking."

- Steve Allen