Statistical PERT™ (SPERT™) Task Estimation Worksheet

By PMI South Florida Chapter

To be used in conjunction with the accompany article Introducing Statistical PERT. To use this template, enter 3-point, task estimates under the Optimistic, Most Likely, and Pessimistic columns. Choose a confidence value for the Most Likely estimate under the Most Likely Confidence column (hover over cell I3 for details).  Examine the SPERT probabilistic estimates for various confidence levels: Show/hide columns O through Z.  Choose whether you want unskewed (it uses the mode) or skewed (it uses the estimated mean).

Related Content

People who downloaded this item also downloaded . . .

Log in or sign up to download this deliverable
Log In
OR
Sign Up

ADVERTISEMENT

19,048
Downloads

Reviews (41)

Login/join to subscribe
Page:
Page:
ADVERTISEMENTS

"I think popular music in this country is one of the few things in the twentieth century that have made giant strides in reverse."

- Bing Crosby

ADVERTISEMENT

Sponsors

Vendor Events

See all Vendor Events