Our iceberg is melting - revisited
Categories:
Change; Change management; Team management
Categories: Change; Change management; Team management
| Our iceberg is melting is not a new release – in fact its first edition dates back from 2005. Nevertheless, the content of this wonderful fable about change management is still valid today. Organizations are constantly evolving in order to adapt to a changing environment. The authors of the book, John Kotter and Holger Rathgeber, describe the change that a penguin colony must undertake in order to adjust to a changing reality and save their lives.
The reader shall not get fooled by the numerous illustrations that populate the pages of this book. This is not a children’s book. And this is precisely what makes it so valuable. In a world with abundance of academic materials about change management, using penguins instead of complex flowcharts increases the reader engagement – and makes the key concepts stick. The reader will surely recognize the characters of the book. For instance, Fred, an observant penguin who identifies and reports the worrying issue to Alice. She is the go getter penguin that puts the valuable information in the agenda of colony’s counsel. Or Louis, the head penguin, wise and respected by all except the naysayers (sure we can all think of naysayers in our organizations!). And Buddy, a not so wise but charismatic penguin whose main role is to provide assurance and confidence in times of distrust. Finally, don’t forget the Professor, who will make use of scientific evidence to back up the need for change throughout the arduous journey. The change team is ready, and they will be covering all required stages; creating and communicating a vision of the new reality, circumventing all obstacles, getting the colony onboard by empowering it and recognizing the efforts carried out by all colony members. These are, in a nutshell, the stages that the reader is navigated through since the need for change is detected until it is successfully implemented (apologies for the spoiler, but when has a fable end up badly?). I read this book during the lockdown caused by coronavirus, which made its lecture very special. At the end of the day, this pandemic will lead the whole world to live in a different way, what has been coined as “new normality”. What a better example of change management than this? One can mull over the reasons that have caused a poor management of the pandemic, specially during the initial stage. A scientific article published in 2007 (Clin. Microbiol Rev 20(4)) took the role of Fred and warned about it: “The presence of a large reservoir of SARS-CoV-like viruses in horseshoe bats, together with the culture of eating exotic mammals in southern China, is a time bomb. The possibility of the reemergence of SARS and other novel viruses from animals or laboratories and therefore the need for preparedness should not be ignored.” Was there an Alice to put this item in the agenda of all world leaders? Were there too many Louis’ leading the efforts to fight the battle against the virus? Did the community trust its leaders? The lecture of this book brings an opportunity to reflect about these aspects and change management in general. |
The Adaptation of Project Management in a Changing World
Categories:
Project Management
Categories: Project Management
| The tune that Bob Dylan released in the sixties, “The times they are a-changing” holds true after 50 years. And like Professor Leon C. Meeginson said “It is not the strongest or the most intelligent who will survive but those who can best manage change”. Read my article below to find out more about the adaptation of project management to the current society and economy. https://pmtips.net/article/the-adaptation-of-project-management-in-a-changing-world
|
Project Management with wings
| I have recently read a non-fictional book entitled “The Invested Investor”, written by the successful UK-based investor Peter Cowley. I strongly recommend the book to anyone that wishes to learn the basics of angel investing. The author covers the life cycle of an investment, from the first round of investment (seeding) until the startup closes shop (most frequent case), is turned into an operational medium-sized business (sometimes) or is acquired by a big player (rarely).
Most of concepts explained throughout the book are related to the art of investing: funding, valuation, venture capital, options, shares, CLV/CCA ratio, etc. However, some other concepts are also applied in the project management arena. In fact, the author claimed that an invested investor must have good project management skills in order to succeed. I selected and described below the top three concepts that are shared in both disciplines. Team Everything starts with the Team. Without a team, there is no startup and there is no project. But not any team will do the job. The features that a project manager or an investor look in their teams are actually the same: passion, drive, knowledge, willingness to learn and listen, transparency, honesty and ability to inspire. In other words, whether is developing a new phone app in a startup that has not reached breakeven or carrying out multimillion dollar projects to transform a city landscape, goals will not be met unless there is a strong and committed team behind them. Pivot Pivot is when a company changes direction and its fundamental offering because the original business model is not working. Pivots are expensive and difficult because they usually carry along more investments and a modified vision. It is important to note than pivoting is not a sign of failure. In fact, most businesses pivot on their way to optimizing the model. Pivoting can also occur – and actually quite often – during a project’s life cycle. At the end of the day, project management enables the translation of a company’s vision into reality. A change in environmental factors or regulations, a shift in consumers’ habits, the release of a novel competing technology… all of these are factors that could pivot the project. Pivoting is carried out by modifying project’s triple constraint – more funding, extended/modified scope, additional resources and/or time – or by killing it straight up. The same concept could be extrapolated to program and portfolio levels, where pivoting the company strategy will inevitably pivot the value stream represented by its portfolio of projects. Documentation Writing cheques is not something that can be done lightly. Funds are transferred from the angel’s account to another account without the certainty that it will ever produce a return. Before the money is kissed goodbye, two documents are set in place; the term sheet which is a mostly non-binding document that sets out the deal to be completed between investors and founders. And the shareholders’ agreement, which is a legally binding document signed by the investors and founders defining how ownership of the company is distributed between the parties. This gated approach resembles the two gates typically found in the initiation and planning phases of a given project. In this manner, the term sheet is equivalent to the project charter – with the difference that the latter is binding – and the shareholders’ agreement is comparable to the project plan. |
Stakeholder management. Emotional Intelligence & Knowledge matrix
| The Power & Interest grid (P&I) is a simple and effective stakeholder analysis tool that categorizes stakeholders according to their degree of interest and power in the project. The end goal of such a tool is to identify key stakeholders who can make or break the project. Power and interest are project specific variables. A stakeholder with a high interest and little power in project A can score totally opposite in project B. Typically, one of these four approaches is applied depending on the score: monitor, keep informed, keep satisfied, manage closely. Despite the usefulness of this tool, could stakeholders be mapped out according to project independent variables? At the end of the day, it is frequent to simplify things and define coworkers in two dimensions: emotional intelligence, EI - are they in control of their emotions and show empathy to others? - and knowledge – how much do they really know? A matrix that plots these two variables is useful in putting together a balanced team and opens up the possibility of identifying synergistic effects amongst stakeholders.
Group 1: High EI & High Knowledge These individuals are likely to be the best fitted in leading (sub)teams. In addition, their wealth of knowledge combined with outstanding EI skills makes them the best candidates to mentor junior or less experienced members, especially from groups 2 and 4. They require minimal supervision and make working with them a rewarding experience. Most likely, they will be on the wish list of future projects or endeavors. Group 2: High EI & Low Knowledge Stakeholders in this group have the right mindset to allow further personal growth and development. Their lack of knowledge is compensated by their continuous commitment to hard work. Opportunities to expand their knowledge must be considered to keep them motivated; this could be done by an ad-hoc training program including shadowing a knowledgeable stakeholder from groups 1 or 3. Group 3. Low EI & High Knowledge The wealth of knowledge that these stakeholders bring to the table is well needed. However, stakeholders that fall in this category tend to make noise, bypass communication lines and could eventually become a threat to project’s well-being. Assigning them an SME role, as opposed to a leading part, should cover their feeling of importance (it is assumed that every stakeholder wants to feel that what they do matters) and thereby minimize the occurrence of disruptive situations along the way. Group 4: Low EI & Low Knowledge Also known as rotten apples. The value added is small compared with the amount of supervision they require. Chances of project derailing skyrocket if too many of these are in the same team. A balanced training comprising soft and hard skills together with the inclusion in a mentoring program are initiatives to consider in order to slowly but surely turn this bad apple into a tasty and juicy one. In some cases, the metamorphose occurs only in one dimension, EI or knowledge, shifting to Groups 2 or 3 respectively. |
Airbus A380. The downfall of a doomed product
Categories:
Project Management
Categories: Project Management
| Six months ago Air France announced it will phase out its ten Airbus A380s by 2022. Rarely has an airline been as unhappy with the Airbus giant as the French, who are in general taking every Airbus aircraft. Other carriers like Singapore airlines - which received the first A380 back in October 2007 - has also started to replace these aircrafts with A350s. Lufthansa and British Airways will likely follow soon. As a consequence, Airbus will stop producing the world's largest passenger airliner as of 2021. Why is the Airbus A380 being phased out earlier than anticipated?
Start with the why Just like famous author and motivational speaker Simon Sinek writes in his book, start with the why. Why was the development and production of an Ultra High Capacity Airliner (UHCA) needed? Was Airbus A380 an innovative product that could challenge the air travel industry? The first studies date back from the late 1980s and were joined by both Boeing and Airbus. The former dropped out after a few preliminary meetings due to sound differences in their vision of aviation industry. On one hand, Airbus was betting on the spoke-hub model in which traffic planners organize routes as series of "spokes" that connect outlying points to a central "hub". On the other, Boeing believed that the future would follow the point to point model which emphasizes flying between two cities directly regardless of their size. The fewer routes required in the hub and spoke requires also bigger planes. Even though both models are used by airliners for transporting passengers from one point to another, the growth in the spoke hub model that Airbus was expecting did not occur. Every assumption is a risk, and this is no different. Back to the drawing board The Airbus A380 project launched in 2000 with a budget of 9,5 billion euros. The first prototype was released in 2005. However, serious issues with the electrical wiring were found. By then the project cost had skyrocketed to 18 billion euros. The delivery of the first commercial unit was delayed up to three times. In June 2005 a delay of 6 months was announced and then again in June 2006. Finally, the first A380 was dispatched in October 2007. The Program Manager and Airbus CEO made a good scapegoat and got fired. Tom Enders, the incoming Airbus CEO, said in 2019: "If you have a product that nobody wants anymore, or you can sell only below production cost, you have to stop it". A thorough and continuous analysis of the market trends along with other environmental factors (in this case, mostly politics) could have provided a landscape in which threats could have been turned into opportunities, and weaknesses intro strengths...but during an earlier phase, in the drawing board. Future is uncertain Just like the Concorde stopped flying in 2003 despite being a profitable business, Airbus A380 could perhaps be retrofitted and get a second life in the future. If this is the case, it will be best to take a good look at the assumptions and ask WHY. |